多点位移计及锚索测力计监测成果显示,紫坪铺引水洞进口边坡在"5.12"汶川地震后发生向坡外的变形,表面点位移增量在3.684~11.518 mm范围内,锚索荷载增量在-16.9~86.1 kN范围内,坡体整体处于稳定状态。主震对坡体变形影响最大,后期余震对坡体变形影响较小,引水洞进口边坡仍处于稳定状态。
The Monitoring results by multi-point extensometer and anchor-cable dynamometer show that the entrance slope at Zipingpu Dam has deformed outwardly after the Wenchuan earthquake.The surface displacement increment is 3.684 to 11.518 mm and the anchor load increment is-16.9 to 86.1 kN,showing that the slope is basically stable.And the study reveal that the deformation has been most affected by the main shock rather,in stead of the aftershocks.
引文
[1]郑声安,王仁坤,章建跃,等.汶川地震对岷江上游水电工程的影响分析[J].水力发电,2008,34(11):5-9.
    [2]牟林,蔡德文.紫坪铺混凝土面板堆石坝震损特征分析[J].吉林水利,2010,(3):8-11.
    [3]杨建,彭仕雄.紫坪铺水利枢纽工程:重大工程地质问题研究[M].北京:中国水利水电出版社,2006:40-61.
    [4]黄秋香,汪家林,邓建辉.基于多点位移计监测成果的坡体变形特征分析[J].岩石力学与工程学报,2009,28(增1):2667-2673.
    [5]钟贤五,周先齐.预应力锚索在紫坪铺水利枢纽边坡工程中的应用[J].中国西部科技,2008,26(7):20-22.
    [6]杨志宏.紫坪铺工程岩质高边坡处理设计[J].四川水利发电,2006,25(4):22-26.
    [7]石安池,赵明华,薛果夫.三峡工程永久船闸高边坡岩体变形特征与机理分析[J].岩石力学与工程学报,2001,20(5):638-642.
    [8]何思明.预应力锚索作用机制研究[D].成都:西南交通大学,2004.
    [9]周维恒.高等岩石力学[M].北京:中国水利水电出版社,1990:216-250.
    [10]张顶立,王悦汉,曲天智.夹层对层状岩体稳定性的影响分析[J].岩石力学与工程学报,2000,19(2):140-144.