建筑工程一切险承保自然灾害的风险分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
在建工程具有灾害易损性高、处于风险中的资产价值随着建设进度逐渐增加的特点.将巨灾风险评估模型与在建工程价值渐增性的特点相结合,提出了建筑工程施工期自然灾害风险分析方法,并以地震灾害为例,阐述了风险分析方法的应用过程.风险分析结果可以作为确定建筑工程一切险保费的依据.
Constructing projects are characterized by higher vulnerability and increasing value at risk,VAR from start to finish.This paper presents a risk analysis method of natural hazards which integrates the feature of(increasing) VAR of constructing projects into catastrophe mode.Then the paper illustrates the application method with a risk analysis of earthquake hazards.The risk analysis results can be served as the foundation of fixing construction all risks(CAR) premiums for CAR insurers.
引文
[1]Hyun-Ho,Hyo-Nam,Seo J W.Risk assessment methodology forunderground construction projects[J].Journal of ConstructionEngineering and Management,2004,130(2):258.
    [2]陈龙.城市软土盾构隧道施工期风险分析与评估研究[R].上海:同济大学土木工程学院,2004.CHEN Long.Risk analysis and assessment during construction ofsoft soil shield tunnel in urban area[R].Shanghai:Tongji Univer-sity,School of Civil Engineering,2004.
    [3]Kozlowski R T,Mathewson S B.A primer on catastrophe model-ing[J].Journal of Insurance Regulation,1997,15(3):322.
    [4]Grossi P.Quantifying the uncertainty in seismic risk and loss esti-mation[D].Philadelphia:University of Pennsylvania,Departmentof Systems Engineering,2000.
    [5]李树桢.地震灾害评估[M].北京:地震出版社,1996.LI Shuzhen.Earthquake hazard assessment[M].Beijing:Seismology Press,1996.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心