格库铁路主要地质灾害及地质选线
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
新建格尔木至库尔勒铁路在阿尔金山北缘断裂山前段,线路平面位置受高程约束,区域内地质构造复杂,不良地质灾害危害严重构成了控制线路方案的主要工程地质问题,通过综合勘察法,详细调绘了该地区构造及地质灾害特点,在充分总结汲取山区铁路综合选线技术经验的基础上,提出了阿尔金山北苑断裂山前段选线定线技术原则,选取地质条件具有优势的桥方案跨越该地区,选线效果显著,同时也为山区类似地质条件地区地质选线提供借鉴。
New Golmud to Korla railway in the northern margin of Altun Mountains rupture front line,bounded line position by the elevation plane,complex geological structure in the region,seriously harmful geological disasters constitute the main engineering geological problems in the rail line control.Through comprehensive survey method,the structure and characteristics of geological disasters in this region was expounded in detail.After drawing a comprehensive summary in full mountain railway line selection on the basis of technical experience,Altun mountain front line selection Beiyuan fracture alignment technical principles was proposed.By selecting advantageous geological conditions across the bridge program the area,line selection effect is significant and can be reference for the geological line selection where mountainous region geological conditions are similar.
引文
[1]杨新亮.遥感技术在格库铁路阿尔金山区地质选线中的应用[J].铁道标准设计,2014,58(3):5-9.
    [2]杜宇本,袁传保,王彦东,等.成兰铁路主要地质灾害与地质选线[J].铁道工程学报,2012,8:11-15.
    [3]杜宇本,蒋良文.大瑞铁路大保段主要工程地质问题及地质选线[J].铁道工程学报,2010,4:23-28.
    [4]毛邦燕,吴俊猛,俞洪平,等.沪昆客专黄果树至北盘江段地质选线方案研究[J].铁道工程学报,2011,10:19-24.
    [5]郑剑东.阿尔金山大地构造及其演化[J].现代地质,1991,5(4):347-354.
    [6]中铁第一勘察设计院集团有限公司.新建库尔勒至格尔木铁路预可行性研究报告[R].2010,西安:中铁第一勘察设计院集团有限公司.
    [7]候珍清,王多杰.阿尔金山北缘断裂带(东北段)基本特征及其与地震的关系[J].西北地震学报,1982,4(3):71-77.
    [8]林辉.泥石流地区的铁路选线[J].铁道工程学报,1992,9:129-135.
    [9]中铁第一勘察设计院集团有限公司.铁路工程地质手册[M].北京:中国铁道出版社,1999:512-518.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心