宝中铁路增建二线六盘山区工程地质选线
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
研究目的:宝中铁路增建二线线路方案比选重点为六盘山区越岭方案的研究工作。由于该区域地质条件复杂,控制线路方案主要地质因素有滑坡、泥石流、地质构造、高烈度地震区、地应力、软质围岩及水文地质条件等,地质选线成为线路穿越六盘山区方案的主要依据。研究结论:根据各方案的地质条件比较,均衡坡西方案以两座特长隧道穿行于六盘山基岩山区,避开了滑坡等不良地质,隧道工程躲避了主干断裂的影响,围岩为岩性单一的白垩系地层,洞口少,浅埋段短,在地震频发的六盘山区,铁路工程的修建和运营风险明显降低,工程地质条件最优。
Research purposes: The study on the schemes for the railway passing the Liupan mountain area is crucial to the selection of the schemes for the extended second line of Baoji-Zhongwei Railway.As the geological condition of this area is complex,the geological factors of controlling the railway line schemes involves in the many geological conditions,such as the landslide,debris flow,geological structure,seismic region,high ground stress,the soft tunnel wall rock and hydrogeological conditions.The engineering geological alignment is crucial to the scheme for railway passing through the Liupan mountain area. Research conclusions:From the comparison of the geological conditions of the various schemes,it is concluded that with the west slope equalization scheme of building two extra-long tunnel through Liupan mountain area,the railway and tunnel can keep away from the area with unfavorable geological condition and the main fault zone,and the tunnel wall is of single lithology cretaceous stratum with less portal and short shallow section.In this way,the risks of construction and operation of the railway in the Liupan mountain area where earthquake occurs frequently are much cut,and the engineering geological condition is optimal.
引文
[1]中道第一勘察设计院集团有限公司.改建铁路宝中线增建第二线可行性研究第四篇地质[R].西安:中铁第一勘察设计集团有限公司,2011.China Railway First Survey and Design Institute GroupLtd.Feasibility Study on the Extended Second Line ofthe Renovated Railway of Baoji-Zhongwei Line Part 4Geology[R].Xi’an:China Railway First Survey andDesign Institute Group Ltd,2011.
    [2]铁道部第一勘测设计院.新建铁路宝鸡中卫线初步设计第四篇地质[R].兰州:铁道部第一勘测设计院,1986.Ministry of Railway the First Survey and DesignInstitute.Preliminary Study on the Renovated Railwayof Baoji-Zhongwei Line Part 4 Geology[R].Lanzhou:Ministry of Railway the First Survey andDesign Institute,1986.
    [3]TB10012—2007,铁路工程地质勘察规范[S].TB 10012—2007,Code for Geology Investigation ofRailway Engineering[S].
    [4]GBJ50111—2006,铁路工程抗震设计规范[S].GBJ 50111—2006,Code for Seismic Design of RailwayEngineering[S].
    [5]中国地震局地壳应力所.宝中铁路增建二线新六盘山隧道水压致裂法地应力测试初步结果[R].北京:中国地震局地壳应力所,2011.China Seismological Bureau Crust Stress Institute.NewLiupan Mountain Tunnel Preliminary Ground StressTest Results of Extended Second Line of Baoji-Zhongwei Railway[R].Beijing:China SeismologicalBureau Crust Stress Institute,2011.
    [6]王联平.西南线芦山隧道地质选线[J].铁道工程学报,2001(3):96-99.Wang Lianping Geologic Route Selection for LushanTunnel of Xi’an-NangJing Railway[J].Journal ofRailway Engineering Society,2001(3):96-99.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心