引文
[1]北京正点国际投资咨询有限公司.中国高速公路产业“十一五”回顾及“十二五”规划投资分析及预测报告[EB/OL].(2011-4-20).http://www.qqfx.com.cn.Beijing Zhengdian International Investment Consultancy.The review of the Eleventh Five-Year Plan and investment analysisand prediction of the twelfth Five-Year Plan of highway in China[EB/OL].(2011-4-20).http://www.qqfx.com.cn.
[2]汪志红,王斌会,张衡.基于Logistic曲线的城市应急能力评价研究[J].中国安全科学学报,2011,21(3):163-169.WANG Zhi-hong,WANG Bin-hui,ZHANG Heng.Research on urban emergency capability evaluation based on logisticcurve[J].China Safety Science Journal,2011,21(3):163-169.
[3]火恩杰,宋俊高,朱元清,等.GIS在城市防震减灾应急决策中的应用[J].自然灾害学报,2000,9(3):15-22.HUO En-jie,SONG Jun-gao,ZHU Yuan-qing,et al.Application of GIS in emergence decision-making of urban earth-quake prevention and disaster reduction[J].Journal of Natural Disasters,2000,9(3):15-22.
[4]吴新燕.城市地震灾害风险分析与应急准备能力评价体系的研究[D].北京:中国地震局地球物理研究所,2006.WU Xin-yan,Analysis of Urban Earthquake Disaster Risk and Research of Evaluation System of Emergency ReadinessCapability[D].Beijing:Institute of Geophysics,China Earthquake Administration,2006.
[5]Geni Brafman Bahar.Integrated Safety Management Proeess[M].Transportation Researeh Board,Washington D.C.,2003.
[6]许丹枫,张礼敬,刘小勇,等.我国公路交通防抗极端天气灾害的应急探讨[J].中国安全科学学报,2010,20(10):159-164.XU Dan-feng,ZHANG Li-jing,LIU Xiao-yong,et al.Study on emergency handling of highway traffic against extremeweather in China[J].China Safety Science Journal,2010,20(10):159-164.
[7]孟祥海,李梅,麦强,等.高速公路事故多发点鉴别及诱发因素识别[J].交通运输系统工程与信息,2011,11(1):114-120.MENG Xiang-hai,LI Mei,MAI Qiang,et al.Research on identification of black spot and accident inducing factor forfreeway[J].Journal of Transportation Systems Engineering and Information Technology,2011,11(1):114-120.
[8]朱茵,江越.城市道路交通应急警力配置模型研究[J].中国安全科学学报,2010,20(11):171-176.ZHU Yin,JIANG Yue.Study on disposing model of policeman for urban road traffic emergencies[J].China SafetyScience Journal,2010,20(11):171-176.
[9]赵挺生,卢学伟,方东平.建筑施工伤害事故诱因调查统计分析[J].施工技术,2003,32(12):54-55.ZHAO Ting-sheng,LU Xue-wei,FANG Dong-ping.Investigation,statistic and analysis of predisposing causes ofconstruction injury accidents[J].Construction Technology,2003,32(12):54-55.
[10]许东强,李军.建筑施工高处坠落事故的特点、成因与预防[J].建筑安全,2003,18(10):9-11.XUDong-qiang,LI Jun.The characteristic cause and prevention of high falling accident in building construction[J].Construction Safety,2003,18(10):9-11.
[11]C.W.Johnson.Proving properties of accidents[J].Reliability Engineering and System Safety,2000,67(2):175-191.
[12]陈科荣.城市建设施工安全重大危险源辨识与防治[J].施工技术,2004,33(8):55-56.CHEN Ke-rong.Identification and prevention of important dangerous headstream affect construction safety in city construc-tion[J].Construction Technology,2004,33(8):55-56.
[13]赵平,裴晓丽,薛剑.基于信息融合的建筑施工安全预警管理研究[J].中国安全科学学报,2009,19(10):106-110.ZHAO Ping,PEI Xiao-li,XUE Jian.Research on safety pre-warning management of building construction based on infor-mation fusion technique[J].China Safety Science Journal,2009,19(10):106-110.
[14]肖劲夫,胡群芳,黄宏伟,等.城市公路隧道预警指标体系调研与分析[J].中国安全科学学报,2009,19(8):144-151.XIAO Jin-fu,HU Qun-fang,HUANG Hong-wei,et al.Investigation and research on the early-warning index system ofurban road tunnel[J].China Safety Science Journal,2009,19(8):144-151.
[15]高青松,彭振斌,徐蒙.工程项目安全预警与应急控制隐性知识集成与共享研究[J].中国安全科学学报,2008,18(10):148-152.GAO Qing-song,PENG Zhen-bin,XU Meng.Study on the integration and sharing of recessive knowledge of safety earlywarning and emergency control for projects[J].China Safety Science Journal,2008,18(10):148-152.
[16]S.Mohamed,T.H.Ali,W.Y.V.Tam.National culture and safe work behavior of construction workers in Pakistan[J].Safety Science,2009,47(1):29-35.
[17]S.X.Zeng,Vivian W.Y.Tam,C.M.Tam.Towards occupational health and safety systems in the construction industryof China[J].Safety Science,2008,46(8):1 155-1 168.
[18]侯馄.建筑工程项目安全应急管理能力评价研究[D].天津:天津财经大学,2009.HOU Kun.Research on the Evaluation of Safety Emergency Management Capability of Construction Projects[D].Tianjin:Tianjin University of Finance&Economics,2009.
[19]李乐.建筑企业安全事故应急管理研究[D].西安:西安建筑科技大学,2010.LI Le.The Study on Security Accident Emergency Management in Construction Enterprises[D].Xi'an:Xi'an University ofArchitecture and Technology,2010.
[20]Roger C.Schank.Dynamic Memory:A Theory Of Reminding And Learning In Computers And People[M].CambridgeUniversity Press,1983.
[21]An M,Baker C,Zeng J.A fuzzy-logic-based approach to qualitative risk modeling in the construction process[J].WorldJournal of Engineering,2005,2(1):1–12.
[22]郭艳红,邓贵仕.基于事例的推理(CBR)研究综述[J].计算机工程与应用,2004,(21):1-5.GUO Yan-hong,DENG Gui-shi.Review of Case-based Reasoning[J].Computer Engineering and Applications,2004(21):1-5.
[23]Agnar Aamodt,Enric Plaza.Case-based reasoning:foundational issues,methodological variations and system approaches[J].AI Communications,1994,7(1):39-59.
[24]陈守煜,袁晶瑄,李亚伟.基于可变模糊集的模糊聚类迭代模型及其应用[J].大连理工大学学报.2008,48(6):882-886.CHEN Shou-yu,YUAN Jing-xuan,LI Ya-wei.Fuzzy clustering iterative model and its application based on variable fuzzyset[J].Journal of Dalian University of Technology,2008,48(6):882-886.
[25]陈守煜,李敏,王淑英.可变模糊聚类迭代模型合理性分析与应用检验[J].大连理工大学学报.2009,49(6):932-936.CHEN Shou-yu,LI Min,WANG Shu-ying.Rationality analysis and application test of variable fuzzy clustering iterativemodel[J].Journal of Dalian University of Technology,2009,49(6):932-936.
[26]姜绍飞.人工神经网络用于建筑工程领域的数据处理方法[J].哈尔滨建筑大学学报,1999,32(5):24-28.JIANG Shao-fei.The Method of Data Processing of Artificial Neural Networks in Civil Engineering Problems[J].Journalof Harbin University of Civil Engineering and Architecture,1999,32(5):24-28.
[27]陈守煜.模糊概念在分级条件下的模糊识别理论[J].控制与决策,1995,10(4):347-351.CHEN Shou-yu.Pattern recognition theory of fuzzy concept under classificatory condition[J].Control and Decision,1995,10(4):347-351.