新宝塔山隧道出口段施工监测与控制
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
新宝塔山隧道施工条件较为复杂:地层岩性差、不良地质条件多、新建隧道与既有隧道相邻、穿越较多的地表建筑物、存在局部覆土较浅地段等。介绍了与既有隧道相邻的出口段的拱顶沉降及净空收敛、初期支护与围岩之间的压力、初期支护混凝土应力、钢拱架内力和围岩内部位移量测,从而及时掌握隧道施工中的相互影响程度,以便修改施工参数,合理安排施工工序,大大降低隧道施工中的风险。监测数据对于确保隧道的施工安全具有很重要的现实意义,并对未来临近隧道施工对既有小间距隧道的设计施工也具有较好的参考价值。
New Baota Mountain Tunnel is constructed in complex geological conditions such as poor lithological composition,adverse geological condition,new-made tunnel adjacent to constructed tunnel,lots of surface constructions above tunnel,and shallow soil covering section.The displacement of tunnel vault and clearance convergence of tunnel,pressure between initial support and the surrounding rock,the concrete stress of initial support,and the internal force of steel arch and measurement of the displacement of internal surrounding rock are introduced so as to get informed with the mutual influence to revise construction parameter,make proper arrangement of construction processes and reduce the risks of tunnel construction.The results show that the monitoring and measurement is important to the design and construction of closely spaced tunnels.
引文
1朱维申,何满潮.复杂条件下围岩稳定性与岩体动态施工力学[M].北京:科学出版社,1996
    2孙广忠.工程地质与地质工程[M].北京:地震出版社,1993
    3孙广忠.地质工程理论语实践[M].北京:地震出版社,1996
    4孙钧.地下工程设计理论与实践[M].上海:上海科学技术出版社,1996
    5李世辉.隧道支护设计新论——典型类比分析法应用和理论[M].北京:科学技术出版社,1999
    6吴凯华.岩土隧洞量测位移的灰色预测与反分析[C].第三届全国岩土力学数值分析与解析方法讨论会论文集,1998
    7孙建华.北京地铁浅埋暗挖法监测资料的进一步研究[J].隧道及地下工程,1992(4)
    8王彦武.太阳高速公路北茹隧道围岩变形监测[J].岩石力学与工程学报,1999(4)
    9刘占魁,刘宝许.隧道工程监测技术与位移反分析测点优化布置[J].包头钢铁学院学报,2002(1)
    10董勇.孤山隧道信息监测与反馈[J].河港工程,2002(1)
    11张成平,刘维宁.隧道净空三维变形非接触监测方法的国内外动态[C].中国土木工程学会隧道及地下工程分会第十一届年会论文集,2000
    12康宁.东港隧道的施工监测[J].岩石力学与工程学报,1998(4)