九华山隧道爆破施工对明城墙振动影响的监测与分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
给出九华山隧道爆破施工对明城墙振动影响的监测方案,包括测振系统、测点布置、拾震器安装及测量参数的设定。介绍监测执行的依据和判别标准。基于爆破振动监测数据,对质点水平和竖向加速度、速度、位移及主频进行回归分析,确立振动传播衰减规律。分析不同药量爆破下各测点的波形主频率和药量相同、不同距离测点的加速度、主频及主频域,归纳出等距离测点、不同药量爆破振动的频谱特性和爆破地震波传播过程中频谱变化的特性,为类似工程提供借鉴。
The monitoring project on Ming Dynasty Wall vibration influenced by explosion construction of Jiuhuashan tunnel in Nanjing is set forth.The project includes vibration test system,measuring points arrangement,collecting sensor installation and test parameter enactment.The safety-judging standard of monitoring is introduced.Via regression analysis of main frequency,acceleration,velocity and displacement in horizontal and vertical directions of measuring points on the basis of monitoring data,the attenuation laws of spread of explosion vibration is put forward.The main frequency of explosion vibration wave of measuring points in different quantities of detonator is discussed.In the same way,the explosion vibration acceleration,main frequency,main frequency field of the measuring points in different distances to center of explosion are analyzed.The spectrum characteristic of explosion vibration measuring points in different quantities of detonator but in same distance to explosion center and the spectrum change characteristic in transmission of explosion vibration earthquake waves are concluded.These will provide references to the similar projects.
引文
[1]解放军理工大学工程兵工程学院.南京城市快速内环东线工程标段三:九华山隧道施工阶段变形监测项目竣工总报告[R].南京:解放军理工大学工程兵工程学院,2005.(Engineering Institute of Engineering Corps,PLA University of Science and Technology.Nanjing city express-inner-ring east route engineering mark section 3:complete report of deformation monitoring in construction of Jiuhuashan tunnel[R].Nanjing:Engineering Institute of Engineering Corps,PLA University of Science and Technology,2005.(in Chinese))
    [2]解放军理工大学工程兵工程学院.南京城市快速内环东线工程标段三:九华山隧道施工阶段变形监测项目爆破振动监测分报告[R].南京:解放军理工大学工程兵工程学院,2005.(Engineering Institute of Engineering Corps,PLA University of Science and Technology.Nanjing city express-inner-ring east route engineering mark section 3:explosion vibration testing report of deformation monitoring in construction of Jiuhuashan tunnel[R].Nanjing:Engineering Institute of Engineering Corps,PLA University of Science and Technology,2005.(in Chinese))
    [3]毕佳,王源,谭跃虎,等.九华山隧道施工中爆破振动对明城墙影响的测试与评定[J].岩土力学,2006,27(增1):1 265–1 269.(BI Jia,WANG Yuan,TAN Yuehu,et al.The testing and judgment on the explosion vibration effect of Jiuhuashan tunnel[J].Rock and Soil Mechanics,2006,27(Supp.1):1 265–1 269.(in Chinese))
    [4]王冰.九华山隧道爆破振动对城墙影响研究[硕士学位论文][D].南京:解放军理工大学,2006.(WANG Bing.The research on the effect on rampart by the explosion vibration of Jiuhuashan tunnel[M.S.Thesis][D].Nanjing:PLA University of Science and Technology,2006.(in Chinese))
    [5]陈士海.爆破地震作用下结构破坏安全标准研究[博士学论文][D].南京:解放军理工大学,2004.(CHEN Shihai.Study on safety standard of structure destruction affected by explosion earthquake[Ph.D.Thesis][D].Nanjing:PLA University of Science and Technology,2004.(in Chinese))
    [6]张云鹏,李存国.爆破地震效应安全判据的发展[J].河北理工学院学报,2003,25(3):119–122,126.(ZHANG Yunpeng,LI Cunguo.The development of safety criterion on blasting vibration effect[J].Journal of Hebei Institute of Technology,2003,25(3):119–122,126.(in Chinese))
    [7]刘殿中,杨仕春.工程爆破实用手册[M].北京:冶金工业出版社,2003.(LIU Dianzhong,YANG Shichun.Practical manual of engineering explosion[M].Beijing:China Metallurgical Industry Press,2003.(in Chinese))
    [8]李二兵,王镝,王源,等.城市复杂条件下浅埋大跨双连拱隧道施工变形监测与控制[J].岩石力学与工程学报,2007,26(4):833–839.(LI Erbing,WANG Di,WANG Yuane,t al.Monitoring and control of construction deformation of urban shallow-buried large-span double-arch tunnel under complex condition[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(4):833–839.(in Chinese))
    [9]郭衍敬,周凤.深孔爆破振动对城市环境的危害及控制技术[J].岩石力学与工程学报,2002,21(增2):2 570–2 573.(GUO Yanjing,ZHOU Feng.Hazards of the city environment caused by deep-hole blasting vibration and controlling technology[J].Chinese Journal of Rock Mechanics and Engineering,2002,21(Supp.2):2 570–2 573.(in Chinese))
    [10]陈庆,王宏图,胡国忠,等.隧道开挖施工中的爆破振动监测与控制技术[J].岩土力学,2005,26(6):964–967.(CHEN Qing,WANG Hongtu,HU Guozhong,et al.Monitoring and controlling technology for blasting vibration induced by tunnel excavation[J].Rock and Soil Mechanics,2005,26(6):964–967.(in Chinese))
    [11]尹志政,张家生,阳生权.厦门云顶隧道爆破监测与分析[J].中国安全科学学报,2005,15(9):109–112.(YIN Zhizheng,ZHANG Jiasheng,YANG Shengquan.Monitoring and analysis of blasting at Yunding tunnel in Xiamen[J].China Safety Science Journal,2005,15(9):109–112.(in Chinese))
    [12]黄志鹏,童克强,李维树,等.重庆市快速轨道交通大坪出渣支洞爆破施工地面建筑爆破振动及裂缝监测[J].岩石力学与工程学报,2001,20(增1):1 838–1 841.(HUANG Zhipeng,TONG Keqiang,LI Weishu,et al.Monitoring on vibration and crack induced by blasting for Daping mucking tunnel of Chongqing City express-railway[J].Chinese Journal of Rock Mechanics and Engineering,2001,20(Supp.1):1 838–1 841.(in Chinese))

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心