短期预报新技术在特长隧道施工中的应用研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
在某深埋、特长隧道施工过程中,为能够更准确地预报地下水,特引入钻孔雷达和BEAM电法预报方法。以典型洞段的预报成果为例,将其与传统方法预报成果进行对比分析,对钻孔雷达和BEAM电法运用的可行性与合理性进行了探讨。实践表明,采用钻孔雷达和BEAM电法探测技术对隧道掌子面前方的不良地质情况,尤其是含水情况具有较好的预测结果。
In construction process of a deep embedded and very long tunnel,in order to accurately predict ground water level,boring radar and BEAM electric prediction method are introduced.Taking typical prediction achievement as example and comparing with the prediction achievement by traditional prediction method,the feasibility and reasonability of using boring radar and BEAM electric method are investigated.The practice demonstrates that the prediction to adverse geologic condition in front of the heading face by boring radar and BEAM electric method,especially to water-holding condition,is satisfied.
引文
[1]赵永贵,刘浩,孙宇.隧道地质超前预报研究进展.地球物理学进展,2003,18(3).
    [2]刘志刚.概论岩溶或地质复杂隧道隧洞地质灾害超前预报技术.铁道建筑技术,2003,(2).
    [3]钟宏伟,赵凌.我国隧道工程超前预报技术现状分析.人民长江,2004,35(9).
    [4]刘秀峰,刘志刚.岩溶地质超前预报方法研究.石家庄铁道学院学报,2003,16(2).
    [5]曾昭璜.隧道地震反射法超前预报.地球物理学报,1994,37(2).
    [6]柳杨春.HSP地持超前预报技术及其应用.西部探矿工程,1997,9(5).

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心