地震次生山地灾害对岷江干流都江堰-汶川段水电工程的影响
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
"5.12"汶川地震震级强、烈度大、波及面广、成灾重,震后诱发了大量的次生山地灾害,对山区城镇村庄、道路交通、水利水电工程和通讯基础设施等造成严重破坏。以都汶公路沿线为例,利用实地调查与遥感解译相结合的方法,研究地震诱发次生山地灾害的分布规律,通过对岷江上游重大水电工程的震害损失调查,分析崩塌滑坡、泥石流对水电工程度危害方式;在此基础上对沿线的37条泥石流沟进行危险度评价,其中属于高度危险的泥石流16条,中度危险的泥石流18条,这些泥石流造成严重的堵河危害;最后对水电工程恢复重建提出减灾措施。
Wenchuan Earthquake,which occurred on May 12,2008 in Sichuan Province of China,has the characteristic of high earthquake magnitude,great intensity,wide area and serious disaster.The secondary mountain hazards caused heavy casualties,serious property damage,and the emergency rescue system of roads and transportation blocked.Xuankou-Wenchuan section of Dujiangyan-Wenchuan highway was selected to discuss the distribution of mountain hazards induced by "5·12" Wenchuan Earthquake.The different types and distribution rules of mountain hazards were extracted and analyzed by means of remote sensing technology and field observation.According to the survey of earthquake losses of hydropower projects in the minjiang river,the hazards pattern of landslide and debris flow to hydropower projects was analyzed.The thirty-seven debris flow gullies along Minjiang River threaten the safety of the highway and bridges cross the gullies.The debris flow hazards assessment results showed that 16 were of high hazardousness,which would result in blocking of the main channel that possibly brought about flood in the downstream of the rive.In the end,the reduction countermeasures were given.
引文
[1]Fan jihui,Liu Qiao,Ma Zelong,et al.Environmental Impactof Hydropower Development in the Upper Reaches of Min-jiang River[J].Sichuan Environment,2006,25(1):24-27.[范继辉,刘巧,麻泽龙,等.岷江上游水电开发对环境的影响[J].2006,25(1):24-27.]
    [2]中国地震局.汶川8.0级地震烈度分布图[EB/OL].http://www.cea.gov.vn/manage/html/8a8587881632fa5c0116674a 018300cf/_content/08_08/29/1219980517676.html.2008-08-29.
    [3]Chen shenghui,Huo Jiaping,Zhang Weimin.Analysis ofeffects of“5.12”Wenchuan Earthquake on Zipingpu con-crete face rock-fill dam[J].Chinese Journal of Geotechni-cal Engineering,2008,30(6):795-801.[陈生水,霍家平,章为民.“5.12”汶川地震对紫坪铺混凝土面板坝的影响及原因分析[J].岩土工程学报,2008,30(6):795-801.]
    [4]杨三军.四川紫坪铺水利枢纽工程受损电站机组全部停机[EB/OL].http://news.xinhuanet.com/newscenter/2008-05/13/content_8158074.htm.2008-05-13.
    [5]Liang Zhiyong,Liu Xia,Xu Yongnian,et al.River channelchanges due to convergence of debris flow[J].Journal ofNatural Disasters,2001,10(1):45-50.[梁志勇,刘峡,徐永年,等.泥石流入汇对河流河床演变的影响[J].自然灾害学报,2001,10(1):45-50.]
    [6]〗Guo Zhixue,Fang Duo,Wang Xiekang,et al.The influ-ence on fluvial process of main river by debris flow[J].Journal of Sediment Resear,2000(4):22-26[郭志学,方择,王协康,等.泥石流入汇对主河演变的影响[J].泥沙研究,2000(4):22-26.]
    [7]Cui P,Liu S Q,Tang B X,et al.Debris flow prevention pat-tern in national parks.Science in China Ser,2003,46:1-11.
    [8]Cui Peng,Wei Fangqiang,Chen Xiaoqing,et al.Geo-haz-ard in Wenchuan Earthquake Area and Countermeasure forDisaster Reduction[J].S&T for Disaster Relief,2008,23(4):317-323.[崔鹏,韦方强,陈晓清,等.汶川地震次生山地灾害及其减灾对策[J].中国科学院院刊,2008,23(4):317-323.]
    [9]刘希林,唐川.泥石流危险性评价[M].北京:科学出版社,1995.
    [10]刘希林,莫多闻.泥石流风险评价[M].成都/乌鲁木齐:四川科学技术出版社/新疆科技卫生出版社,2003.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心