大型水泥筒仓结构物群体的拆除爆破技术
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
介绍一大型水泥厂筒仓结构物群体的定向爆破拆除,但需保留其中一磨料房和6个筒仓。由于筒仓群周围环境复杂,筒仓集群连接,结构坚固,难以实现定向倒塌。该工程采用预处理办法,将其分割成3组独立的结构群体,分组顺序延时起爆,分别向三个方向倾倒的“同一建筑三向倾倒方案”。爆破后达到预期的拆除目的,可为同类工程参考。
In this paper,a very large cement factory building need to be demolished,but the triturator house and the rest six silos must be protected.Because of the complicated environment and the stable structure,and it is difficult to topple them over.Based on some pre-treatment measures such as dividing them into 3 separated structures and priming them in sequence,three different directional collapsing of the same construction is realized.The desired blasting results were achieved and the experience could been provided for similar projects in the future.
引文
(1)冯叔瑜,吕毅,顾毅成,等.城市控制爆破[M].北京:中国铁道出版社,1996.
    (2)陈寿如,周治国,宋光明.特殊框架拆除爆破的几点体会[J].西部探矿工程,1998,10(5):53-54.
    (3)史秀志,陈寿如,宋光明,等.倒塌空间不足的水塔爆破拆除[J].爆破器材,2001,30(3):23-25.
    (4)刘殿中.工程爆破手册[M].北京:冶金工业出版社,1993.
    (5)陈寿如,毛晖,张劲松,等.减少喀斯特岩层铝土矿台阶爆破根底和大块的研究[J].工程爆破,2003,9(2):42-45.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心