摘要
岩土层波速特别是剪切波波速是核电厂场地评价和设计最重要的参数之一,通过原位测试手段获得高精度的波速数据是核电厂勘测中的重点和难点之一。相对于人工孔中机械震源,孔中电火花震源具有发射能量强、频率高、一致性好等优点,本文介绍了跨孔波速测试方法和孔中电火花震源的原理,并以南方某核电厂最重要的核岛区和泵房区跨孔波速测试为例,分析了孔中电火花震源的测试效果和特点。
The shear wave velocity of nuclear power plant geotechnical layer is one of the most important parameters for site evaluation and design input,so how to obtain wave velocity data of high precision by methods in-site tests is the most important and difficult in nuclear power plant survey.Related to the mechanical source in hole,spark source in hole has the advantages of strong emitted energy,high frequency and good consistency.In this paper,taking the cross hole wave velocity tested in nuclear island and pump room area of a nuclear power plant in south China as an example,the cross hole wave velocity test method and the principle of spark source in hole are introduced,and the test result and characteristics are analyzed.
引文
[1]董树巍,刘伟强.波速测试在岩土工程勘察中的应用[J].科技信息,2011,(4):357~358.
    [2]陈昌军.场地剪切波波速测试及其应用[J].华南地震,2003,23(4):82~86.
    [3]袁文福.波速测试在工程中的应用研究[J].内陆地震,1998,12(1):50~56.
    [4]孙鹞鸿,左公宁.用于井间地震的传输式电火花震源[J].石油物探,2001,40(3):57~60.
    [5]甘文兵,刘江平,王延坤,等.地震映像法在某跨海大桥水上勘查中的应用[J].工程地球物理学报,2006,3(1):33~37.
    [6]朱文仲,赵志忠.弹性波CT技术几个重要问题的研究[J].工程地球物理学报,2008,5(2):173~180.
    [7]刘君利,卫福旺,李新,等.堤坝质量检测中的层析成像技术[J].工程地球物理学报,2009,6(5):556~560.
    [8]牛向东,李文勇,介伟.黄河大堤根石探测的地震SH横波方法研究[J].工程地球物理学报,2005,2(3):195~201.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心