在地质灾害防治工程治理滑坡抗滑桩施工中,由于外界因素的影响很容易引起滑坡变形加剧。施工工序改变、大规模的开挖、施工中遇持续的暴雨和地质环境条件的变化可能造成未完工的支挡工程坏损。
In the construction of landslide sliding pile of geological disaster prevention governance project,the landslide deformation can easily be rock-ribbed because of the influence of the external factor.The change of the construction process,large-scale excavating and persistent rainstorm and the change of geological environment in the construction maybe lead to the damage of the retaining engineering which is unfinished.
引文
[1]刘平,李伟,李三明,等.四川省地震灾区2008年重大地质灾害宝兴县先锋村滑坡应急勘查报告[R].武汉:武汉地质工程勘察院,2009.
[2]刘晓,熊承仁,等.四川省地震灾区2008年重大地质灾害宝兴县先锋村滑坡防治工程施工图设计[R].武汉:中国地质大学(武汉),2009.