Minimizing average project team size given multi-skilled workers with heterogeneous skill levels
详细信息    查看全文
文摘
class="listitem" id="list_li0005">
class="label">•

The task of assigning multi-skilled workers to concurrent projects is considered.

class="label">•

We present a mixed-integer linear program that aims at forming small project teams.

class="label">•

We outline valid inequalities that support a commercial branch-and-cut solver.

class="label">•

We prove that the problem is strongly NP-hard and devise three heuristics.

class="label">•

A computational analysis reveals the heuristic that performs best.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700