Development of an ITER prototype disruption mitigation valve
详细信息    查看全文
文摘

An ITER-DMV prototype for 100 bar, D = 80 mm, opening time 3.5 ms, is ready for fabrication.

The vacuum part is sealed against the working gas by stainless steel bellows for 110 bar.

The conical Laval gas outlet allows maximal mass flow rate.

The eddy current drive turn ratio was optimized for low tilting moment.

Polyimide is used for the head sealing, the decelerator and for the bearing of the guide tube.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700