Risk adjusted financial costs of photovoltaics
详细信息    查看全文
文摘
Recent research shows significant differences in the levelised photovoltaics (PV) electricity cost calculations. The present paper points out that no unique or absolute cost figure can be justified, the correct solution is to use a range of cost figures that is determined in a dynamic power portfolio interaction within the financial scheme, support mechanism and industry cost reduction. The paper draws attention to the increasing role of financial investors in the PV segment of the renewable energy market and the importance they attribute to the risks of all options in the power generation portfolio. Based on these trends, a former version of a financing model is adapted to project the energy mix changes in the EU electricity market due to investors behaviour with different risk tolerance/aversion. The dynamic process of translating these risks into the return expectation in the financial appraisal and investment decision making is also introduced. By doing so, the paper sets up a potential electricity market trend with the associated risk perception and classification. The necessary risk mitigation tasks for all stakeholders in the PV market are summarised which aims to avoid the burden of excessive risk premiums in this market segment.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700