双拼单线梁组成临时运架梁通道的关键技术研究
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Research on Key Techniques of Temporary Beam Transportation and Erection Channel Composed of Double-spliced Single Track Beam
  • 作者:王玉策
  • 英文作者:WANG Yuce;China Railway 23rd Bureau Group Rail Transit Engineering Co.Ltd.;
  • 关键词:地铁 ; 技术支持 ; 数值计算 ; 双拼单线梁 ; 渐变 ; 运梁荷载
  • 英文关键词:Railway;;Technical support;;Numerical calculation;;Double-spliced single track beam;;Gradual change;;Beam transport load
  • 中文刊名:TDJZ
  • 英文刊名:Railway Engineering
  • 机构:中铁二十三局集团轨道交通工程有限公司;
  • 出版日期:2019-05-20
  • 出版单位:铁道建筑
  • 年:2019
  • 期:v.59;No.543
  • 语种:中文;
  • 页:TDJZ201905010
  • 页数:3
  • CN:05
  • ISSN:11-2027/U
  • 分类号:49-51
摘要
为保证架桥机安全通过渐变式轨道梁体,成都轨道交通10号线二期工程花桥站采用了双拼单线梁运梁过站的方法。该方法将单线梁暂时并拢,使其位于线路正中位置,同时安装临时支座固定,形成临时的运梁通道。待全线运梁、架梁工作完成后,再将其横移至线路设计位置。为验证该方法的可行性,利用MIDAS/Civil软件建立了花桥站轨道梁的有限元计算模型,从轨道梁体的纵桥向、横桥向强度以及整体抗倾覆稳定性3个方面详细验算了梁体的力学参数在双拼单线运梁荷载作用下的变化,完成了双拼单线梁运梁过站的数值计算,为花桥站渐变式双拼单线梁运梁过站专项施工提供了技术支持。
        To guarantee the safety of bridge crane as it passes through the track beam with gradual change,the method of double-spliced single track beam is used for transporting beam in Huaqiao station of the second phase of Chengdu rail transit line 10.In this method,the single track beam is temporarily closed and placed in the middle of the track.Then,the temporary bearings are installed and fixed to form a temporary beam transport channel.When the work of transporting and erecting beam on the whole line is completed,the beam is moved to the design position of the track.To verify the feasibility and correctness of this method,the finite element computational model of track beam of Huaqiao station was established by using the MIDAS/Civil software.In terms of the longitudinal direction,transverse direction and overall anti-overturning stability of the track beam,the variation of the mechanical parameters of the track beam under the load of the double-spliced single track transport beam was examined in detail.The numerical calculation of the double-spliced single track beam of beam transportation is completed,which provides the technical support for the beam transportation special construction of the double-spliced single track beam with gradual change in Huaqiao station.
引文
[1]李艳茹.预制梁场建设规模优化与内部布局问题研究[D].成都:西南交通大学,2013.
    [2]徐庆.大型桥梁工程预制梁场设计及生产优化研究[D].合肥:合肥工业大学,2008.
    [3]郭勇,潘诚文,周晓慧,等.运梁车过桥对成桥阶段混凝土箱梁的结构影响[J].交通科技,2014,40(6):32-34.
    [4]马耕.混凝土宽箱梁桥上运梁过程仿真分析[J].铁道建筑,2011,51(1):1-3.
    [5]徐爱敏,陈衡治,张治成.杭州湾大桥梁上运梁过程仿真分析[J].中国铁道科学,2005,26(5):22-25.
    [6]陈平.铁路连续梁在运梁车作用下的承载力分析[J].中华建设,2013,(12):170-171.
    [7]贺国京,向绿林,徐爱民,等.山区高速公路裸梁上运梁安全性分析及防护措施研究[J].中外公路,2015,35(4):119-122.
    [8]郑凯锋,陈宁,张晓翘.桥梁结构仿真分析技术研究[J].桥梁建设,1998,33(2):10-15.