洪屏抽水蓄能电站水泵方向导叶关闭优化处理
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Optimizing Treatment for Guide Vane Closing in Pump Mode of HongPing Storage Hydropower Plant
  • 作者:唐拥军 ; 喻冉
  • 英文作者:TANG Yongjun;YU Ran;Technology Center of State Grid Xinyuan Company Ltd;Hebei Fengning pumped storage Co.Ltd.;
  • 关键词:抽水蓄能机组 ; 水泵断电 ; 反转 ; 快速关闭 ; 控制逻辑
  • 英文关键词:Pump storage unit;;Load rejection test in pump mode;;Contrarotation;;Quick close;;Control logic
  • 中文刊名:DBGC
  • 英文刊名:Hydropower and Pumped Storage
  • 机构:国网新源控股有限公司技术中心;河北丰宁抽水蓄能有限公司;
  • 出版日期:2019-02-20
  • 出版单位:水电与抽水蓄能
  • 年:2019
  • 期:v.5;No.23
  • 基金:国家电网公司科技项目(52573016001J)
  • 语种:中文;
  • 页:DBGC201901020
  • 页数:6
  • CN:01
  • ISSN:32-1858/TV
  • 分类号:90-95
摘要
江西洪屏抽水蓄能电站装机4台300MW的水泵水轮机—发电电动机机组。4台机组在启动调试期间进行的水泵断电试验中,机组均出现了较高转速的反转现象,这将引发剧烈的水力瞬变,威胁机组及其压力管道系统的安全运行。通过仿真计算确定了最优的导叶关闭速度,并通过增加快速关闭阀和修改相应控制逻辑对水泵方向的导叶关闭实现优化改造处理,结果使得机组反转转速明显变小,达到了优化处理的目的。
        JiangXi Hongping pump storage hydropower plant was equipped with four pump turbine-generator motor units. The phenomena of high contrarotation speed happened in load rejection test in pump mode during four unit's start-up test period,which triggered a sharp hydraulic transient,so it was a menace to safe running of unit and the pressure piping system. The optimal closure speed of guide vane was figured out through simulation analysis. At last,the optimizing treatment for guide vane closing in pump mode was conducted through adding quick closing valve and modifying corresponding control logic. As a result,the contrarotation speed was decreased significantly. Therefore,the purpose of optimization was achieved.
引文
[1]刘竹溪,刘光临.泵站水锤及其防护[M].北京:水利电力出版社,1985.LIU Zhuxi,LIU Guanglin. Water Hammer of Pump Station andits Protection[M]. Beijing:Water Resources and Electric PowerPress,1985.
    [2]朱伟.水泵水轮机S特性形成机理的水动力学分析[D].北京:清华大学图书馆,2015.ZHU Wei. Hydrodynamic Mechanism Analysis of the S-shapedCurve for aReversible Pump-turbine Model[D]. Beijing:Tsinghua University Library,2015.
    [3]赵亮,杨建东,石卫兵,刘德祥.白莲河抽水蓄能电站首台机组低扬程下水泵工况抽水断电水力过渡过程研究[J].水利与建筑工程学报,2009(9):129-131.ZHAO liang,YANG Jiandong,SHI Weibing,LIU Dexiang.Research on Interim Processing Condition of Water-pumpingPower Failure Under Low Head in Bailianhe Pumped-StoragePower Station[J]. Journal of Water Resources and Architectural,2009(9):129-131.