摘要
通过分析大体积混凝土温控不到位的原因,进一步探讨了经过实践经验总结的大体积混凝土温控措施,如:温控参数选定、浇筑温控措施、测温技术、浇筑后的温控措施,提高了大体积混凝土温控力度,同时也分析了大体积混凝土其他控制措施,有助于提高温控措施效果,防止大体积混凝土裂缝的产生,提高大体积混凝土施工质量。
By analyzing the cause of the large volume concrete temperature control not in place,this paper further discusses the author's practical experience to sum up the large volume concrete temperature control measures,such as the selection of temperature control parameters,after pouring temperature control measures,temperature measuring technology and after pouring temperature control measures. The temperature control of the large volume concrete is improved,and the other control measures of large volume concrete are also analyzed. It helps to improve the effect of temperature control measures,to prevent the creation of the large volume of concrete cracks,and to improve the construction quality of large volume concrete.
引文
[1]何双福.桥梁工程的大体积混凝土施工技术与温控措施研究[J].山东工业技术,2016(3):271.
[2]邓华伟,陈梦义,孔维,等.厦漳同城大道主桥大体积混凝土温控防裂技术研究[J].施工技术,2016(S1):302-304.
[3]高振东.风电场工程风机基础大体积混凝土施工技术研究探讨[J].工程技术(全文版),2017(1):163.
[4]张彬,宋帅,钱由胜,等.桥梁基础大体积混凝土施工温控研究[J].辽宁工程技术大学学报(自然科学版),2017(6):614-618.
[5]王涛,李北星,刘敬,等.超缓凝大体积混凝土配合比优化及温控技术[J].硅酸盐通报,2017,36(6):2154-2161.
[6]彭再勇.红谷沉管隧道管节大体积混凝土温控与防裂技术[J].隧道建设,2016,36(9):1139-1146.
[7]张丹丹,杨泽华.空间立体冷却网对桥梁基础大体积混凝土温控效果研究[J].公路工程,2017,42(3):282-285.