摘要
项目环境影响包括大气环境、声环境、水环境、固体废弃物以及水土流失的影响。在环境评价工作中,通过替代方案比选、关联项目尽职调查、公众参与协商、采取减缓措施、实施环境与社会管理计划等途径减轻对环境保护目标的影响,将其影响程度和范围控制在国家法律法规和世界银行业务政策允许的框架内。
This paper briefly introduced the focus of environmental assessment for the World Bank 's project. The environmental impacts during construction includes the impacts on atmospheric environment, acoustic environment, water environment, solid waste and water and soil erosion. In the environmental impact assessment, alternatives analysis has been conducted to optimize the project design; in addition, with the implementation of mitigation measures and the developed environmental and social management plan based on the effective public consultation, the impacts on these sensitive receptors were expected to be controlled within acceptable level in compliance with the national laws,regulations and the World Bank's operational policies.
引文
[1]马红友,史学峰.申报世界银行节能贷款项目环境影响评价要点分析[J].科技信息, 2009(12):337-338.
[2]张文聪.山西省世行贷款水土保持项目环境影响评价[J].山西水土保持科技, 1996(4):28-30.
[3]汪舒文.谈国际金融组织贷款项目环境评价工作[J].辽宁建材, 2006(2):91.
[4]吴平,周宗敏.对比分析我国和亚洲银行环境影响评价的异同点——以贵阳市水资源综合管理项目为例[J].水利规划与设计, 2008(4):59-62.
[5]夏海芳.世界银行贷款项目环境影响评价中的公众参与——以世行贷款某渔港项目为例[J].海峡科学, 2014(7):18-21.
[6]陈敏才.亚行贷款福建水土保持项目环境影响评价[J].亚热带水土保持, 1998(1):50-54.
[7]World bank group.Environmental, Health, and Safety General Guidelines[R]. The World Bank,2007.
[8]World bank group.Operational Manual OP 4.01-Environmental Assessment[R].The World Bank, 1999.
[9]World bank group.Operational Manual OP 4.04-natural Habitats[R]. The World Bank, 2001.
[10]World bank group.Operational Manual OP 4.09-Pest Management[R]. The World Bank, 1998.
[11]World bank group. Operational Manual OP 4.11-Physical Cultural Resources[R]. The World Bank,2006.