摘要
对于有优先权的开关和不同部件及修理设备组成的温贮备系统.马尔可夫系统分析方法,Matlab软件和拉普拉斯变换及反变换给出了该系统的首次故障前平均时间和可用度及故障频度等主要的可靠性指标表达式.
For a warm standby system composed of switch with priority, various components, and reparatory equipments, Markov system analysis method, MATLAB software, Laplace transform, and its inverse transform are employed to give an expression for principal reliability indices of this system such as average time before first failure, availability, and fault frequency.
引文
[1] 曹晋华,程侃.可靠性数学引论 [M].北京:科学出版社,1986.
[2] 吴清太.2个不同部件组成的开关寿命连续型温贮备可修系统的可靠性分析 [J].南京理工大学学报(自然科学版),2004,28(6):673-678.
[3] 张权,韩旸,关宝玲,等.转换开关不可靠的温储备可修系统可靠性分析 [J].山东大学学报(理学版),2014,49(10):62-65.
[4] LI H X,MENG X Y,LI X.Warm standby repairable system consists of two components with priority and a unreliable switch [J].Management Science and Engineering,2007,1(2):22-28.
[5] 张民悦,陈艳丽.不同类型三部件串并联系统的可靠性分析 [J].兰州理工大学学报,2011,37(2):127-130.
[6] ELSHERBENY M S,RASHAD A M,GHARIEB D M.The optimal system for series systems with warm standby components and a repairable service station [J].Pakistan Journal of Statistics & Operation Research,2011,37(2):227-284.
[7] 张民悦,邬一帆.具有多重休假开关连续型温贮备可修系统的可靠性分析 [J].兰州理工大学学报,2015,41(5):152-157.
[8] 杨利升,郑海鹰,YANG L S,等.开关不完全可靠潜艇充电系统可靠性分析 [J].浙江大学学报(理学版),2012,39(4):393-395.
[9] MOKADDIS G S,El-SHERBENY M S,Al-ESAYEH E.Compare between two-unit cold standby and warm standby outdoor electric power systems in changing weather [J].Journal of Mathematics & Statistics,2010,6(1):17-22.
[10] LEUNG F,ZHANG Y L,LAI K K.An optimal replacement policy for a two-component cold standby system with repair priority [J].Proceeding of the Institution of Mechanical Engineer,2010,224(6):963-970.
[11] 王冠军,张元林.有优先维修权和优先使用权的冷贮备系统的几何过程模型 [J].经济数学,2005,22(1):42-49.
[12] 谢秀梅,张民悦,姚滔.有优先权3部件冷贮备可修系统可靠性分析 [J].甘肃科学学报,2010,22(1):118-121.
[13] 包林涛,张民悦,段红星.有优先权两部件温贮备可修系统的模糊可靠性 [J].模糊系统与数学,2008,22(1):169-174.
[14] 董兵,唐应辉.具有优先修理权的两个不同部件并联系统的可靠性分析 [J].黑龙江大学自然科学学报,2007,24(2):249-252.
[15] 梁丹丽,张民悦.具有优先修理权的三个不同部件并联系统的可靠性分析 [J].兰州交通大学学报,2011,8(4):139-144.
[16] 张民悦,郑铭海.开关有优先权n部件并联系统可靠性分析 [J].四川理工学院学报(自然版),2012,25(3):83-85.
[17] LI Y,MENG Y X.Reliability analysis of a warm standby repairable system with priority in use [J].Applied Mathematical Modelling,2011,35(9):4295-4303.
[18] 张民悦,薛美娜.维修有优先权的且含有r个修理工的环形相邻k/n(F)可修系统分析 [J].兰州理工大学学报,2012,38(3):134-138.