研究开发项目的中止决策研究
详细信息    本馆镜像全文|  推荐本文 |  |   获取CNKI官网全文
摘要
由于研究开发项目的高风险性,以及随着项目进展投入逐渐增加的特点,适时中止一个没有前途的项目,具有重大的现实意义。本文立足于管理实践,首先对中止决策的基本理论进行探讨;提出划分研究开发项目过程的五阶段活动决策方法,并在此基础上建立了动态权变的评价指标选择模型;用定性和定量方法帮助管理者做好中止决策;从行为金融和集体信念的角度分析了不良项目难以终结的原因,并给出了应对措施;最后探讨了中止决策后一些问题的处理。本文的研究将有助于提高管理者对中止决策的认识,更好地做好中止工作,避免不良项目带给企业的更大浪费。
It's practically important to terminate a R&D project just in time due to its high risks and increasing investments. This study put forward a dynamic contingency model of assessment index system based on a five stage activity-decision theory. We consider the reason why the bad project is difficult to terminate in behavior finance and collective belief perspectives and give some countermeasures to improve the decision's rationality. The thesis also focus on the related problems after the terminate decision. This study will be helpful to give an insight on the project management and avoid the waste of bad project successfully.
引文
1.资料来源于:The Standish Group的混沌报告(The Standish Chaos Report 2001)
    2. Vinod Kumar, Aditha N.S.Persaud, and Uma Kumar. To Terminate or Not an Ongoing R&D Project: A Managerial Dilemma. IEEE Transactions on Engineering Management. Vol 43, No. 3, August 1996, 273-284
    3.官建成,刘权,曹彦斌.R&D项目中止决策的实证研究.北京航空航天大学学报,2001年6期
    4.详见:综合统计方法在R&D项目中止决策中的应用.系统工程学报,Vol.16,No.6,Dec.,2001,450-455
    5.此方法和官建成等的打分评价模型相同.详见:R&D项目中止决策的实证研究[J].北京航空航天大学学报,2001年6期
    6.详见:王守荣.研究与开发项目中止的经济分析.科学学研究,1994年2期
    7.张三力.项目后评价[M].北京:清华大学出版社,2001年
    8.事实上,三种评估模型并不是打分评价模型这么简单,这样处理是为了比较的方便。
    9.德国另外多出项目生命周期阶段、项目经理的适应性两个指标,这14个是三个国家共有的。
    10.费歇尔判别函数是把k个总体的所有p维空间的样本点投影到一维空间上,使得在一维空间中,来自不同总体的样本点尽可能的分开,既要建立一个线性判别函数:u(z)=ax=a_1x_1+a_2x_2+…+a_px_p。
    11.可以结合SPSS和Excel比较容易实现,参见:干方彬,王伟.在Excel中实现上市公司财务的模糊聚类分析.中国会计电算化,2004年12期
    
    
    [1] R. Balachandra, Early Warning Signals for R&D Project. Lexington [M], MA: Lexington Books,1989
    [2] Jonathan F'Bard, Ramaiya Balachandra, Pedro E'Kaufmann. An Interactive Approach to R&D Project Selection and Termination[J]. IEEE Transactions on Engineering Management. Vol 35, No. 3, August 1988, 139-146
    [3] Vinod Kumar, Aditha N.S.Persaud, and Uma Kumar. To Terminate or Not an Ongoing R&D Project: A Managerial Dilemma[J]. IEEE Transactions on Engineering Management. Vol 43, No. 3, August 1996, 273-284
    [4] Klaus Brockhoff. R&D Project Termination Decision by Discriminant Analysis-An international comparison[J]. IEEE Transactions on Engineering Management. Vol 41, No. 3, August 1994, 245-254
    [5] R. Balachandra and Klaus Brockhoff. Are R&D Project Factors Universal? [J]. Research Management, 1995, July, August, 31-36
    [6] R. Balachandra, Klaus Brockhoffand Alan W.Pearson. R&D Project Termination Decisions: Processes, Communication, and Personnel Changes[J]. Journal of Product Innovation Management, 1996, 13,245-256
    [7] Amir M.Hormozi, Robert D.McMinn, Okeleke Nzeogwu. The Project Life Cycle:The Termination Phase[J]. Sam Advanced Management Journal,Winer2000,45-50
    [8] R.Balachandra, and John H.Friar. Factors for Success in R$D Projects and New Product Innoation: A Contextual Framework[J]. IEEE Transactions on Engineering Management. Vol 44, No. 3, August 1997, 276-287
    [9] R.Balachandra. A Comparison of R&D Project Termination Factors in Four Industrial Nations[J]. IEEE Transactions on Engineering Management. Vol 43, No. 1, August 1996, 88-96
    [10] Meir Statman, and David Caldwell. Applying Behavioral Finance to Capital Budgeting: Project Terminations[J]. Financial Management/winter,1987,7-15
    [11] Jiancheng Guan, Quan Liu, and Hui Peng. Making Better Project Termination
    
    Decisions[J]. Research Technology Management, January-February, 2002,13-15
    [12] Wen-Yau Liang. The Analytic hierarchy process in project evaluation: A R&D Case study in Taiwan[J]. 445-456
    [13] 杨列勋.R&D项目评估研究综述[J].管理工程学报,2002年2期
    [14] 陈国宏.R&D项目中止决策刍议[J].科研管理,1997年4期
    [15] 黄荣兵,项建国,杨缦琳.R&D项目选择模型和中止模型的比较[J].科研管理,1999年1期
    [16] 王凭慧.科学研究项目评估方法综述[J].科研管理,1999年3期
    [17] 谢有红.企业研究与开发组合项目的中止决策探析[J].中国钼业,2002年5期
    [18] 王守荣.研究与开发项目中止的经济分析[J].科学学研究,1994年2期
    [19] 董景荣.R&D项目中止决策的小波网络模式识别[J].管理科学学报,2001年2期
    [20] 陈国宏.R&D项目中止决策的Fuzzy模式识别[J].科学学研究,1998年1期
    [21] 官建成,刘权,曹彦斌.R&D项目中止决策的实证研究[J].北京航空航天大学学报,2001年6期
    [22] 杨列勋.研究与开发项目评估及应用[M].北京:科学出版社,2002年
    [23] 张三力.项目后评价[M].北京:清华大学出版社,2001年
    [24] 陈劲 周笑磊 唐会英.R&D项目的中止决策[J].科学学语科学技术管理,2003年8期,5—8
    [25] 席酉民,杨列勋.R&D项目评估整体模型研究[J].系统工程理论与实践,2002年10期,105—112
    [26] 陈业华,邱菀华.R&D投资决策可靠性的熵(法)评价[J].科研管理,Vol.20,No.6,Nov.,1999,71-76
    [27] 周勇,周寄中.R&D项目的期权性特征分析与期权性价值的估算[J].管理科学学报,Vol.5,No.1,Feb.,2002,19—24
    [28] 刘权,官建成.企业R&D项目最佳组合及中止决策[J].系统工程理论与实际.2001年2期,47—52
    [29] 官建成,刘权.改进的Hamming神经网络在R&D项目中止决策中的应用[J].控制与决策,2001年11月,882—885
    
    
    [30] 刘权,官建成,薛荆枝.国防R&D项目的评估与中止决策[J].北京航空航天大学学报,June,2001,Vol.27,No.3,361-364
    [31] 杨扬.R&D项目决策的动态规划模型[J].渝西学院学报(自然科学版).Sep.,2003,Vol.2,No.3,61-64
    [32] 董景荣,杨秀苔.基于人工神经网络的R&D项目中止决策诊断[J].科研管理,Vol.22,No.1,Jan.,2000,128-132
    [33] 曹彦斌,官建成.R&D项目中止决策的Fuzzy综合评判方法之实证研究[J].研究与发展管理,Vol.12,No.4,Aug.,2000,21-26
    [34] 孙佰清,王小唯等.基于区域映射模型的R&D项目中止决策[J].哈尔滨工业大学学报,Vol.34,NO.4,Aug.,2002,455-458
    [35] 官建成,刘权.综合统计方法在R&D项目中止决策中的应用[J].系统工程学报,Vol.16,No.6,Dec.,2001,450-455
    [36] 屈交胜,官建成.R&D项目中止决策的Fuzzy动态综合评判[J].科研管理,Vol.17,No.5,Sep.,1996,36-42
    [37] 董景荣,杨秀苔.R&D项目中止决策的有效性分析[J].重庆大学学报(自然科学版),Vol.23,Jan.,2000,88-92
    [39] 干方彬,王伟.在Excel中实现上市公司财务的模糊聚类分析[J].中国会计电算化,2004年12期
    [40] 李相镐,李洪兴等.模糊聚类分析及其应用[M].贵州科技出版社,1994年9月
    [41] 何晓群.现代统计分析方法与应用[M].中国人民大学出版社,1998年11月
    [42] 茆诗松,主编.统计手册[M].科学出版社,2003年1月
    [43] 加里S·林恩,理查德R·赖利.新产品开发的5个关键步骤[M].机械工业出版社,2003年8月
    [44] 陈劲,宋建元.解读研发——企业研发模式精要·实证分析[M].机械工业出版社,2003年4月
    [45] Roman Boutellier等著,曾忠禄主译.未来竞争的优势——全球研发管理案例研究与分析[M].广东经济出版社,2002年12月