摘要
弃渣场是铁路工程建设土石方平衡调配必需的配套设施,线路平纵断面调整引起工点发生变化、征地困难、交通运输困难、部分弃土场已另作他用等因素造成弃渣场位置发生变化。在阐述弃渣场选址原则、弃渣场重新选址主要情况的基础上,结合工作实际从工程措施、植物措施、临时措施3个方面对铁路弃渣场防护措施进行分析,以期对今后工作有所借鉴。
Waste slag is a necessary supporting facility for balanced allocation of earthwork in railway engineering construction. The adjustment of horizontal and vertical sections of the line causes changes in worksite, difficulties in land acquisition, transportation, a part of waste slag been used for other purposes and other factors, which cause changes in the position of waste slag. On the basis of expounding the principle of site selection and the main situation of site re-selection of waste slag, this paper analyzes the protective measures of railway waste slag from three aspects of engineering measures,plant measures and temporary measures, so as to provide reference for future work.
引文
[1]水利部.水利部办公厅关于印发《水利部生产建设项目水土保持方案变更管理规定(试行)》的通知:办水保[2016] 65号[A/OL].(2016-03-24)[2018-10-18].http://www.mwr.gov.cn/zwgk/zfxxgkml/201603/t20160324_965736.html.
[2]开发建设项目水土保持技术规范:GB 50433—2008[S].北京:中国计划出版社,2008:6.
[3]王明慧,蒋树平,张桥,等.山区高速铁路弃渣场选址分析[J].铁道工程学报,2013,30(4):18-20,67.
[4]章健华,宋珺.铁路工程建设项目弃渣管理探索与实践[J].铁路节能环保与安全卫生,2018,8(4):173-176.
[5]韩信,张敏静.弃土场位置选择和设计原则方法探讨[J].公路,2008(9):282-285.
[6]中华人民共和国河道管理条例[A/OL].(2017-03-01)[2018-10-18]. http://www.gov.cn/gongbao/content/2017/content_5219167.htm.
[7]水土保持工程设计规范:GB 51018—2014[S].北京:中国计划出版社,2014:100.
[8]宋立旺,戚德辉,郝咪娜.生产建设项目表土资源的保护与利用[J].中国水土保持,2017(9):26-28.
[9]中国水土保持学会水土保持规划设计专业委员会.生产建设项目水土保持设计指南[M].北京:中国水利水电出版社2011,114.