震后交通需求预测的修正四阶段法
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
将城市震后交通系统运行划分为两个阶段:震后应急阶段及震后恢复阶段,并根据地震环境下不同恢复阶段的社会经济活动及交通系统特性对传统交通预测四阶段法———出行产生、出行分布、方式划分、交通分配的宏观模型进行修正,讨论不同模型参数的变化趋势,建议参数的调整原则及方法,进而以修正四阶段法为基础进行震后交通需求预测。该方法简便易行,预测结果可对城市交通系统防灾规划提供决策依据。
In the paper,post-earthquake traffic processing is divided into three periods for urban transportation system,that is emergency period,restoration period and recovered period.Depending on the social economic activity and transportation character in different period,the traditional four-stage traffic demand estimation model,which includes traffic generation,traffic distribution,modal split and traffic assignment is advised.The changing tendency of different parameters in the models is discussed and the parameter adjustment principle and method are suggested.The advised four-stage method can be used to estimate the traffic distribution after earthquake and help the government make anti-disaster plan.
引文
[1] 赵成刚,冯启民,等 生命线地震工程[M] 北京:地震出版社,1994
    [2] 王炜,徐吉谦,杨涛,李旭宏 城市交通规划理论及其应用[M] 南京:东南大学出版社,1998
    [3] 陆化普,等 交通规划理论与方法[M] 北京:清华大学出版社,1998
    [4] 刘灿齐 现代交通规划学[M] 北京:人民交通出版社,2001

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心