引文
[1]王梦恕.中国隧道及地下工程修建技术[M].北京:人民交通出版社,2010:8–11.(WANG Mengshu.Tunnelling and underground engineering technology in China[M].Beijing:China Communications Press,2010:8–11.(in Chinese))
[2]高文学,颜程鹏,李志星,等.浅埋隧道爆破开挖及其振动效应研究[J].岩石力学与工程学报,2011,30(增2):4 153–4 157.(GAO Wenxue,YAN Chengpeng,LI Zhixing,et al.Blasting excavation and vibration effects of shallow tunnel excavation[J].Chinese Journal of Rock Mechanics and Engineering,2011,30(Supp.2):4 153–4 157.(in Chinese))
[3]李夕兵,凌同华,张义平.爆破震动信号分析理论与技术[M].北京:科学出版社,2009:22–25.(LI Xibing,LING Tonghua,ZHANG Yiping.Analysis of blast vibration signals-theories and methods[M].Beijing:Science Press,2009:22–25.(in Chinese))
[4]李洪涛,卢文波,舒大强,等.爆破地震波的能量衰减规律研究[J].岩石力学与工程学报,2010,29(增1):3 364–3 369.(LI Hongtao,LU Wenbo,SHU Daqiang,et al.Study of energy attention law of blast-induced seismic wave[J].Chinese Journal of Rock Mechanics and Engineering,2010,29(Supp.1):3 364–3 369.(in Chinese))
[5]宗琦,汪海波,周胜兵.爆破地震效应的监测和控制技术研究[J].岩石力学与工程学报,2008,27(5):938–945.(ZONG Qi,WANG Haibo,ZHOU Shengbing.Research on monitoring and controlling techniques considering effects of seismic shock[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(5):938–945.(in Chinese))
[6]杨年华,张志毅.隧道爆破控制技术研究[J].铁道工程学报,2010,(1):82–86.(YANG Nianhua,ZHANG Zhiyi.Research on the control technology for tunnel blasting vibration[J].Journal of Railway Engineering Society,2010,(1):82–86.(in Chinese))
[7]周春锋.城市浅埋隧道开挖减震控制爆破技术[J].工程爆破,2001,7(1):57–61.(ZHOU Chunfeng.Vibration reducing controlled blasting technology for excavation of urban shallow tunnel[J].Engineering Blasting,2001,7(1):57–61.(in Chinese))
[8]陈庆,王宏图,胡国忠,等.隧道开挖施工的爆破振动监测与控制技术[J].岩土力学,2005,26(6):964–967.(CHEN Qing,WANG Hongtu,HU Guozhong,et al.Monitoring and controlling technology for blasting vibration induced by tunnel excavation[J].Rock and Soil Mechanics,2005,26(6):964–967.(in Chinese))
[9]张永兴,张远华.隧道爆破开挖条件下地表建筑振动速度响应研究[J].地震工程与工程振动,2010,30(6):112–119.(ZHANG Yongxing,ZHANG Yuanhua.Research on vibration velocity responses of surface building under the condition of blasting excavation in tunnel[J].Journal of Earthquake Engineering and Engineering Vibration,2010,30(6):112–119.(in Chinese))
[10]张俊兵,胡国伟.浅埋不良地质条件下小净距隧道掘进与减振爆破技术研究[J].铁道工程学报,2011,(1):51–56.(ZHANG Junbing,HU Guowei.Research on driving and damping blasting technologies for construction of shallow small clear-distance tunnel under favorable geological conditions[J].Journal of Railway Engineering Society,2011,(1):51–56.(in Chinese))
[11]唐海,李海波,周青春,等.预裂爆破震动效应试验研究[J].岩石力学与工程学报,2010,29(11):2 277–2 284.(TANG Hai,LI Haibo,ZHOU Qingchun,et al.Experimental study of vibration effect of presplit blasting[J].Chinese Journal of Rock Mechanics and Engineering,2010,29(11):2 277–2 284.(in Chinese))
[12]傅洪贤,沈周,赵勇,等.隧道电子雷管爆破降振技术试验研究[J].岩石力学与工程学报,2012,31(3):598–603.(FU Hongxian,SHEN Zhou,ZHAO Yong,et al.Experimental study of decreasing vibration technology of tunnel blasting with digital detonator[J].Chinese Journal of Rock Mechanics and Engineering,2012,31(3):598–603.(in Chinese))
[13]凌同华,李夕兵,王桂尧.爆破震动灾害主动控制方法研究[J].岩土力学,2007,28(7):1 439–1 442.(LING Tonghua,LI Xibing,WANG Guiyao.A study of initiative control of blast vibration damages[J].Rock and Soil Mechanics,2007,28(7):1 439–1 442.(in Chinese))
[14]孟小伟,黄明利,谭忠盛,等.数码电子雷管在城镇浅埋隧道减振爆破中的应用[J].工程爆破,2012,18(1):28–32.(MENG Xiaowei,HUANG Mingli,TAN Zhongsheng,et al.Application of digital electron detonator in the blasting shock absorption technology to shallow-buried tunnel at town[J].Engineering Blasting,2012,18(1):28–32.(in Chinese))
[15]孟祥栋,田振农,王守伟,等.城区隧道微震爆破技术研究[J].爆破,2011,28(4):6–10.(MENG Xiangdong,TIAN Zhennong,WANG Shouwei,et al.Study of slight vibration technology of tunnel blasting in urban area[J].Blasting,2011,28(4):6–10.(in Chinese))
[16]刘星,徐栋,颜景龙.几种典型电子雷管简介[J].火工品,2003,(4):35–38.(LIU Xing,XU Dong,YAN Jinglong.The oversea development of electronic detonator[J].Initiators and Pyrotechnics,2003,(4):35–38.(in Chinese))
[17]KAY D.Digital blasting—an opportunity to revolutionise mass underground mining[C]//Proceedings of Massmin 2000.Brisbane:The Australian Institute of Mining and Metallurgy,2000:155–161.
[18]TUCKER G B,KAY D B.The use of electronic blasting system at the M.I.M George Fisher Mine[J].Explosives and Blasting Technique,2000:117–122.
[19]周桂松,江小波,向华仙,等.I-Kon电子起爆系统在三峡RCC围堰爆破拆除中的应用[J].爆破器材,2007,36(6):23–26.(ZHOU Guisong,JIANG Xiaobo,XIANG Huaxian,et al.Application of I-Kon electronic blasting system in the demolition of Three Gorges RCC cofferdam[J].Explosive Materials,2007,36(6):23–26.(in Chinese))
[20]张乐,颜景龙,李风国,等.隆芯1号数码电子雷管在露天采矿中的应用[J].工程爆破,2010,16(4):73–76.(ZHANG Le,YAN Jinglong,LI Fengguo,et al.Application of Lux No.1 digital electronic detonator in an open pit mine[J].Engineering Blasting,2010,16(4):73–76.(in Chinese))
[21]石崇,毕卫国.爆破地震破坏判据的探讨[J].岩土力学,2004,25(增):115–118.(SHI Chong,BI Weiguo.Discussion of blasting damage criteria[J].Rock and Soil Mechanics,2004,25(Supp.):115–118.(in Chinese))
[22]宋全杰,李海波,李俊如,等.层理对爆破振动传播规律的影响[J].岩石力学与工程学报,2012,31(10):2 103–2 108.(SONG Quanjie,LI Haibo,LI Junru,et al.Influence of stratification on attenuation law of blasting vibration[J].Chinese Journal of Rock Mechanics and Engineering,2012,31(10):2 103–2 108.(in Chinese))
[23]REZA N.Prediction of ground vibration level induced by blasting at different rock units[J].International Journal of Rock Mechanics and Mining Sciences,2011,48(6):899–908.
[24]田振农,孟祥栋,王国欣.城区隧道电子雷管起爆错相减震机制分析[J].振动与冲击,2012,31(21):108–111.(TIAN Zhennong,MENG Xiangdong,WANG Guoxin.Mechanism analysis of fault-phase vibration reduction for tunnel blasting initiated by electronic detonators in city area[J].Journal of Vibration and Shock,2012,31(21):108–111.(in Chinese))
[25]陈寿如,李雁翎,谢圣权.露天采场台阶干扰降震爆破技术试验研究[J].湖南科技大学学报:自然科学版,2004,19(2):10–13.(CHEN Shouru,LI Yanling,XIE Shengquan.Experimental study of blasting vibration reducing by waveform interface in an open stope[J].Journal of Hunan University of Science and Technology:Natural Science,2004,19(2):10–13.(in Chinese))
[26]张继春,曹孝君,郑爽英,等.浅埋隧道掘进爆破的地表震动效应试验研究[J].岩石力学与工程学报,2005,24(22):4 158–4 163.(ZHANG Jichun,CAO Xiaojun,ZHENG Shuangying,et al.Experimental study on vibration effects of ground due to shallow tunnel blasting[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(22):4 158–4 163.(in Chinese))
[27]东兆星,李佃平,李正龙,等.隧道掘进常用掏槽方式及参数合理性评价与分析[J].岩石力学与工程学报,2003,22(9):1 478–1 482.(DONG Zhaoxing,LI Dianping,LI Zhenglong,et al.Evaluation and analysis on the rationality of undermine patterns and parameters for tunneling[J].Chinese Journal of Rock Mechanics and Engineering,2003,22(9):1 478–1 482.(in Chinese))