引文
[1]潘家铮,何璟.中国大坝50年[M].北京:中国水利水电出版社,2000.9.(PAN Jia-zheng,HE Jing.Large dams inChina(a fifty year review)[M].Beijing:China Water PowerPress,2000.(in Chinese))
[2]顾淦臣,束一鸣,沈长松.土石坝工程经验与创新[M].北京:中国水利水电出版社,2004.(GU Gan-chen,SUYi-ming,SHEN Chang-song.Experiences and innovations ofearth-rockfill dam engineering[M].Beijing:China WaterPower Press,2004.(in Chinese))
[3]王柏乐.中国当代土石坝工程[M].北京:中国水利水电出版社,2004.(WANG Bo-le.Modern earth-rockfill dams inChina[M].Beijing:China Water Power Press,2004.(inChinese))
[4]邓铭江,于海鸣,李湘权,等.新疆大坝建设进展[J].水利水电技术,2010,41(7):29-35.(DENG Ming-jiang,YUHai-ming,LI Xiang-quan,et al.Dam construction progress inXinjiang[J].Water Resources and Hydropower Engineering,2010,41(7):29-35.(in Chinese))
[5]邓铭江,于海鸣,李湘权.新疆坝工技术进展[J].岩土工程学报,2010,32(11):1678-1687.(DENG Ming-jiang,YUHai-ming,LI Xiang-quan.Advances of dam constructiontechniques in Xinjiang[J].Chinese Journal of GeotechnicalEngineering,2010,32(11):1678-1687.(in Chinese))
[6]邓铭江,于海鸣.新疆坝工建设[M].北京:中国水利水电出版社,2011.(DENG Ming-jiang,YU Hai-ming.Damconstruction in Xinjiang[M].Beijing:China Water PowerPress,2011.(in Chinese))
[7]蒋国澄,傅志安,凤家骥.混凝土面板坝工程[M].武汉:湖北科学技术出版社,1997.(JIANG Gou-cheng,FU Zhi-an,FENG Jia-ji.Concrete face rockfill dam project[M].Wuhan:Hubei Science and Technology Press,1997.(in Chinese))
[8]陈生水,凤家骥,袁辉.砂砾石面板坝关键技术研究[J].岩土工程学报,2004,26(1):16-20.(CHEN Sheng-shui,FENG Jia-ji,YUAN Hui.Research on key techniques offacing sandy gravel dam[J].Chinese Journal of GeotechnicalEngineering,2004,26(1):16-20.(in Chinese))
[9]凤家骥,张国安.柯柯亚面板坝的防渗设计与原型观测[J].水力发电,1989,15(3):17-20.(FENG Jia-ji,ZHANGGou-an.Seepage control design and prototype observationfor Kekeya face rockfill dam[J].Water Power,1989,15(3):17-20.(in Chinese))
[10]韦春侠,陈洪武,王占巨.察汗乌苏水电站混凝土面板砂砾石坝关键技术[J].葛洲坝集团科技,2009,90(2):15-18.(WEI Chun-xia,CHEN Hong-wu,WANG Zhang-ju.Keytechnology of the CF sand and gravel rockfill dam of theChahanwusu Hydropower Station[J].Gezhouba groupScience&Technology,2009,90(2):15-18.(in Chinese))
[11]谢定松,刘杰,魏迎奇.高面板堆石坝渗流控制关键技术问题探讨[J].长江科学院院报,2009,26(10):118-121,125.(XIE Ding-song,LIU Jie,WEI Ying-qi.Key technologyproblems of seepage control for building high concrete facerockfill dam[J].Journal of Yangtze River Scientific ResearchInstitute,2009,26(10):118-121,125.(in Chinese))
[12]汪洋,曲苓.乌鲁瓦提砂砾石面板高坝渗流控制的设计[J].水利水电技术,2000,31(1):66-70.(WANG Yang,QU Ling.Seepage control design for Wuluwati dam[J].WaterResources and Hydropower Engineering,2000,31(1):66-70.(in Chinese))
[13]白建军,王钧.乌鲁瓦提混凝土面板砂砾石堆石坝坝料填筑渗透性浅析[J].水利水电技术,2003,34(12):36-39.(BAI Jian-jun,WANG Jun.Permeability analysis onembankment material of Wuluwati concrete face rockfilldam[J].Water Resources and Hydropower Engineering,2003,34(12):36-39.(in Chinese))
[14]曲苓,汪洋,余春海.乌鲁瓦提混凝土面板堆石(砂砾石)坝体排水系统设计[J].新疆水利水电,1994(2):6-10.(QU Ling,WANG Yang,YU Chun-hai.Design ofdrainage for concrete face rock fill dam of WuluwatiHydropower Station[J].Xinjiang Water Conservancy andHydropower,1994(2):6-10.(in Chinese))
[15]彭卫军,罗松涛.吉林台一级水电站混凝土面板砂砾一堆石坝设计与施工[J].水力发电,2006,32(6):23-25.(PENG Wei-jun,LUO Song-tao.The design and constructionof the CF sand and gravel rockfill dam of the Jilintai-Ⅰhydropower station[J].Water Power,2006,32(6):23-25.(inChinese))
[16]杨长征,王钧,洪迎东,等.乌鲁瓦提水利枢纽工程混凝土面板砂砾石堆石坝坝体填筑施工技术[J].水利水电技术,2003,34(12):9-13.(YANG Chang-zheng,WANG Jun,HONG Ying-dong.Construction technique of filling forWuluwati concrete face rockfill dam[J].Water Resources andHydropower Engineering,2003,34(12):9-13.(in Chinese))
[17]杨昭,席福来.乌鲁瓦提水利枢纽工程混凝土面板堆石坝筑坝料工程特性研究[J].水利水电技术,2003,34(12):31-33.(YANG Zhao,XI Fu-lai.Characteristics ofembankment material of Wuluwati concrete face rockfilldam[J].Water Resources and Hydropower Engineering,2003,34(12):31-33.(in Chinese))
[18]彭汉军,郭霞辉.吉林台混凝土面板砂砾-堆石坝填筑中的质量监理[J].水力发电,2006,32(6):34-39.(PENGHan-jun,GUO Xia-hun.Quality inspect of the filling of theJilintai hydropower station slab and gravel rock-fill dam[J].Water Power,2006,32(6):34-39.(in Chinese))
[19]唐懿.吉林台一级水电站面板堆石坝混凝土面板施工[J].水力发电,2006,32(6):40-43.(TANG Yi.Construction of concrete faced rock-fill dam of Jilintai-hydropower station[J].Water Power,2006,32(6):40-43.(inChinese))
[20]顾淦臣.土石坝地震工程[M].南京:河海大学出版社,1989.(GU Gan-chen.Earthquake engineering for earthrockdams[M].Nanjing:Hohai University Press,1989.(inChinese))
[21]汪洋,曲苓.乌鲁瓦提混凝土面板堆石(砂砾石)坝设计[J].新疆水利水电,1995(1):19-26.(WANG Yang,QU Ling.Design of concrete-face rock-fill dam in WuluwatiHydropower Station[J].Xinjiang Water Conservancy andHydropower,1995(1):19-26.(in Chinese))
[22]彭卫军,范金勇.吉林台一级水电站混凝土面板砂砾石一堆石坝坝体抗震设计[J].水力发电,2006,32(6):26-28.(PENG Wei-jun,FAN Jin-yong.The seismic design of the CFdam of Jilintai-Ⅰhydropower station[J].Water Power,2006,32(6):26-28.(in Chinese))
[23]大连理工大学.吉林台混凝土面板砂砾一堆石坝坝材试验与三维有限元静动力分析[R].大连:大连理工大学,2001.(Dalian University of Technology.Jilintai concrete facerockfill dam material test and gravel a 3d finite element staticand dynamic analysis[R].Dalian:Dalian University ofTechnology,2001.(in Chinese))
[24]唐懿,张开军.高寒高震地区混凝土面板堆石坝工程的特点[J].水电站设计,2006,22(1):10-13.(TANG Yi,ZHANG Kai-jun.Characteristics of concrete face rock-filldam in high cold&seismic area[J].Design of HydroelectricPower Station,2006,22(1):10-13.(in Chinese))
[25]郑远建.吉林台一级水电站混凝土面板砂砾堆石坝面板止水施工工艺[J].水利水电技术,2006,37(6):57-59.(ZHENG Yuan-jian.Construction technology of waterstop ofthe face slab of the concrete face rock-fill dam of Jilintai-Ⅰhydropower station[J].Water Resources and HydropowerEngineering,2006,37(6):57-59.(in Chinese))
[26]贾金生,郝巨涛,陈肖雷.混凝土面板坝止水带设计与柔性填料[J].水力发电,2002,28(4):23-26.(JIA Jing-sheng,HAO Ju-tao,CHENG Xiao-lei.Design principles ofwatertight strip for high reinforced concrete face dam and thecontrol indexes of flexible filling material performances[J].Water Power,2002,28(4):23-26.(in Chinese))
[27]鲁一晖,郝巨涛,赵波,等.吉林台电站混凝土面板坝周边缝自愈型止水结构[J].水力发电,2005,31(1):42-54.(LU Yi-hui,HAO Ju-tao,ZHAO Bo,et al.Research onself-healing waterstop of perimeter joint of Jilintai-I CFRD[J].Water Power,2005,31(1):42-54.(in Chinese))
[28]钟根波.梅溪水库混凝土防渗墙的设计与施工[J].浙江水利科技,2000(5):56-58.(ZHONG Geng-bo.Design andconstruction of concrete impervious wall for Meiqireservoir[J].Zhejiang Hydrotechnics,2000(5):56-58.(inChinese))
[29]李国英,沈珠江,赵魁芝.梅溪水库面板堆石坝原型观测资料反馈分析及大坝变形预报模型[J].水利水运科学研究,1999(4):329-337.(LI Gou-ying,SHEN Zhu-jiang,ZHAOKui-zhi.Back analysis of observation data of Meixi CFRDand study on prediction model for dam deformation[J].Hydro-science and Engineering,1999(4):329-337.(inChinese))
[30]朱孟业.建造在深厚覆盖层上的梁辉水库面板堆石坝[J].浙江水利科技,1997(3):34-35.(ZHU Men-ye.LianghuiCFRD built on thick alluvium deposits[J].ZhejiangHydrotechnics,1997(3):34-35.(in Chinese))
[31]孙志峰.汉坪咀水电站坝基防渗墙施工综述[J].东北水利水电,2004,22(12):230-235.(SUN Zhi-feng.Constructionof dam foundation impervious wall in Hanpengzuihydropower station[J].Water Resources&Hydropower ofNortheast China,2004,22(12):230-235.(in Chinese))
[32]聂广明,何雷霆.汉坪嘴水电站大坝“5.12”地震后的应急检查概况[J].大坝与安全,2008(3):6-8,14.(NIEGuang-ming,HE Lei-ting.Introduction on emergencyinspection of Hanpingzui dam 5.12 earthquake[J].Large Dam&Safety,2008(3):6-8,14.(in Chinese))
[33]赵魁芝,李国英,米占宽.汉坪咀混凝土面板堆石坝防渗体系设计方案优选[J].水利水运工程学报,2004(2):45-50.(ZHAO Kui-zhi,LI Guo-ying,MI Zhan-kuan.Designoptimization for impervious system of Hanpingzui rockfilldam with concrete facing slab[J].Hydro-science andEngineering,2004(2):45-50.(in Chinese))
[34]冯业林,李云,李娟,等.趾板置于覆盖层的那兰水电站面板砂砾石坝设计研究[J].水力发电,2006,32(11):45-47.(FENG Ye-ling,LI Yun,LI Juan,et al.Concrete facegravelfill and rockfill dam of Nalan hydropower station ondeep alluvium[J].Water power,2006,32(11):45-47.(inChinese))
[35]刘娟,马耀.深厚覆盖层上高面板坝防渗体系设计研究[J].水力发电,2009,34(9):81-83.(LIU Juan,MA Yao.Study on the design of seepage control system for high facerockfill dam on deep overburden layer[J].Water Power,2009,34(9):81-83.(in Chinese))
[36]吴利平.九甸峡水利枢纽工程筑坝材料特性研究[J].甘肃水利水电技术,2010,46(3):26-28.(WU Li-ping.Study oncharacteristic of material of Jiudianxia Water Project[J].Gansu Water Conservancy and Hydnopower Technology,2010,46(3):26-28.(in Chinese))
[37]刘娜.土石坝三维非线性有限元分析及防渗墙应力状态研究[D].西安:西安理工大学,2007:81-95.(LIU Na.Three-dimension nonlinear analysis of earth-rock dam andthe stress character study of the diaphragm wall in dams[D].Xi'an:Xi'an University of Technology,2007:81-95.(inChinese))
[38]孙大伟,邓海峰,田斌,等.大河水电站深覆盖层上面板堆石坝变形和应力性状分析[J].岩土工程学报,2008,30(3):434-439.(SUN Da-wei,DENG Hai-feng,TIANBing,et al.Deformation and stress analysis of Dahe CFRDbuilt on thick alluvium deposits[J].Chinese Journal ofGeotechnical Engineering,2008,30(3):434-439.(inChinese))
[39]吴鹏举.铜街子水电站面板坝三向测缝计资料分析[C]//混凝土面板堆石坝国际研讨会论文集.北京,2000:477-481.(WU Peng-ju.Material analysis of triaxial joint meter ofTongjiezi Dam[C]//International Conference Of ConcreteFaced Rockfill Dam,Beijing,2000:477-481.(in Chinese))
[40]何志涛,邓德生,王兴然.铜街子水电站面板堆石坝有限元计算[J].水电站设计,1994,10(3):74-79.(HE Zhi-tao,DENG De-sheng,WANG Xing-ran.Finite Element Methodfor Tongjiezi dam[J].Design of Hydroelectric Power Station,1994,10(3):74-79.(in Chinese))
[41]吴何乔,吴波,鲁芳芳.双溪口水库低弹模混凝土防渗墙施工[J].浙江水利科技,2008(1):77-78,81.(WUHe-qiao,WU Bo,LU Fang-fang.The constructiontechnology of low elastic modulus of concrete cutoff wall inShuangxikou reservoir[J].Zhejiang Hydrotechnics,2008(1):77-78,81.(in Chinese))
[42]唐巨山,丁邦满.横山水库扩建工程混凝土面板堆石坝设计[J].水力发电,2002,28(7):35-37.(TANG Ju-shan,DING Bang-man.Design of concrete face rockfill dam of theexpansion project of Hengshan Reservoir[J].Water Power,2002,28(7):35-37.(in Chinese))
[43]王汝军,梁谦.老渡口水电站面板堆石坝防渗墙施工[J].湖北水力发电,2009(3):49-52.(WANG Ru-jun,LIANGQian.Construction of impervious wall in CFRD of LaodukouHydropower Station[J].Hubei Water Power,2009(3):49-52.(in Chinese))
[44]唐新军,凤炜,凤家骥,等.榆树沟水库枢纽工程的设计特点与运行情况[J].新疆农业大学学报,2004,27(2):52-56.(TANG Xin-jun,FENG Wei,FENG Jia-ji,et al.Designcharacter and circulation situation of Yushugou reservoirpivot project[J].Journal of Xinjiang agricultural University,2004,27(2):52-56.(in Chinese))
[45]刘杰.土石坝渗流控制理论基础及工程经验教训[M].北京:中国水利水电出版社,2006.(LIU Jie.Seepage controlof earth-rock dams theoretical basis,engineering experiencesand lessons[M].Beijing:China Water Power Press,2006.(inChinese))
[46]刘杰.混凝土面板坝碎石垫层料最佳级配试验研究[J].水利水运工程学报,2001(4):1-5.(LIU Jie.Experimentalstudy of optimum gradation of crushed stone cushion forconcrete-face rockfill dam[J].Hydro-science and Engineering,2001(4):1-5.(in Chinese))
[47]SL228—98混凝土面板堆石坝设计规范[S].北京:中国水利水电出版社,1999.(SL228—98Concrete face rockfilldam design standard[S].Beijing:China Water Power Press,1999.(in Chinese))