引文
[1]闫少宏,尹希文.大采高综放开采几个理论问题的研究[J].煤炭学报,2008,33(5):481-484.Yan Shaohong,Yin Xiwen.Discussing about the main theoreticalproblems of long wall with top coal caving[J].Journal of China CoalSociety,2008,33(5):481-484.
[2]闫少宏.大采高综放开采煤壁片帮冒顶机理与控制途径研究[J].煤矿开采,2008,13(4):5-8.Yan Shaohong.Research on side and roof falling mechanism andcontrol approaches in caving mining with large mining height[J].Coal Mining Technology,2008,13(4):5-8.
[3]王国法,刘俊峰,任怀伟.大采高放顶煤液压支架围岩耦合三维动态优化设计[J].煤炭学报,2011,36(1):145-151.Wang Guofa,Liu Junfeng,Ren Huaiwei.Design and optimization ofhigh seam caving coal hydraulic support based on model of supportand wall rock coupling[J].Journal of China Coal Society,2011,36(1):145-151.
[4]吴永平.特厚复杂煤层综放开采技术研究[J].煤矿开采,2008,13(1):18-21.Wu Yongping.Research on full mechanized caving mining technolo-gy in extremely thick and complicated coal seam[J].Coal MiningTechnology,2008,13(1):18-21.
[5]孟庆坤.涡北矿大采高综放开采及其液压支架选型[J].煤炭科学技术,2007,35(8):53-54.Meng Qingkun.Fully mechanized high cutting height and cavingmining technology and hydraulic powered support selection in WobeiMine[J].Coal Science and Technology,2007,35(8):53-54.
[6]闫少宏.特厚煤层大采高综放开采支架外载的理论研究[J].煤炭学报,2009,34(5):590-593.Yan Shaohong.Theory study on the load on support of long wall withtop coal caving with great mining height in extra thick coal seam[J].Journal of China Coal Society,2009,34(5):590-593.
[7]刘杰.特厚煤层综放工作面围岩运动的微地震监测[J].矿业安全与环保,2008,35(1):44-46.Liu Jie.Movement of roof strata in extra-thick coal seams in top-coalcaving mining based on a high precision micro-seismic monitoringsystem[J].Mining Safety&Environmental Protection,2008,35(1):44-46.
[8]杨志国,于润沧,郭然,等.基于微震监测技术的矿山高应力区采动研究[J].岩土力学与工程学报,2009,28(2):3632-3637.Yang Zhiguo,Yu Runcang,Guo Ran,et al.Mining engineering rockburst high-stress area micro seismic monitoring time-spatial distribu-tion[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(2):3632-3637.
[9]夏永学,潘俊锋,王元杰,等.基于高精度微震监测的煤岩破裂与应力分布特征研究[J].煤炭学报,2010,36(2):239-243.Xia Yongxue,Pan Junfeng,Wang Yuanjie,et al.Study of rule of sur-rounding rock failure and stress distribution based on high-precisionmicro-seismic monitoring[J].Journal of China Coal Society,2011,36(2):239-243.
[10]夏永学,康立军,齐庆新,等.基于微震监测的5个指标及其在冲击地压预测中的应用[J].煤炭学报,2010,35(12):2011-2015.Xia Yongxue,Kang Lijun,Qi Qingxin,et al.Five indexes of micro-seismic and their application in rock burst forecastion[J].Journalof China Coal Society,2010,35(12):2011-2015.
[11]孔令海,姜福兴,刘杰,等.基于高精度微震监测的特厚煤层综放面支架围岩关系[J].岩土工程学报,2010,32(3):401-406.Kong Linghai,Jiang Fuxing,Liu Jie,et al.Relationship betweensupport and strata in extra-thick coal seam fully-mechanized sublev-el caving mining based on high precision micro seismic monitoringtechnology[J].Chinese Journal of Geotechnical Engineering,2010,32(3):401-406.
[12]康天合,柴肇云,李义宝.底层大采高综放全厚开采20 m特厚中硬煤层的物理模拟研究[J].岩石力学与工程学报,2007,26(5):1065-1072.Kang Tianhe,Chai Zhaoyun,Li Yibao.Study on physical simulationof full-seam mining for a 20 m very thick and medium hard seam bybub-level caving mining with high bottom cutting height[J].Chi-nese Journal of Rock Mechanics and Engineering,2007,26(5):1065-1072.
[13]祝凌甫,闫少宏.大采高综放开采顶煤运移规律的数值模拟研究[J].煤矿开采,2011,16(1):11-40.Zhu Lingfu,Yan Shaohong.Numerical simulation of top-coal move-ment rule in fully-mechanized caving mining with large miningheight[J].Coal Mining,2011,16(1):11-40.
[14]刘全明.大采高综放工作面长度的空间效应初探[J].煤矿开采,2010,15(3):27-29.Liu Quanming.Research on space effect of face length of full mech-anized caving mining with large mining height[J].Coal MiningTechnology,2010,15(3):27-29.
[15]鲍里索夫A A.矿山压力原理与计算[M].王庆康,译.北京:煤炭工业出版社,1986.