引文
[1]王学潮,张辉,陈书涛,等.南水北调西线第一期工程地质条件分析[J].人民黄河,2001,23(10):25–26.(WANG Xuechao,ZHANG Hui,CHEN Shutao,et al.Analysis of geological conditions on the first stage project of water diversion form West Route of South-to-North Water Transfer Project[J].Yellow River,2001,23(10):25–26.(in Chinese))
[2]王学潮,张辉,刘振红,等.南水北调西线工程地质灾害初步研究[J].地球科学,2001,26(3):297–303.(WANG Xuechao,ZHANG Hui,LIU Zhenhong,et al.Geological hazards about West Route of South-to-North Water Transfer Project[J].Earth Science,2001,26(3):297–303.(in Chinese))
[3]王学潮,高广礼.南水北调西线工程环境地学特征研究[C]//庄逢甘,陈述彭编.2001遥感科技论坛.北京:中国宇航出版社,2001:125–128.(WANG Xuechao,GAO Guangli.Study on geological environment feature of West Route of South-to-North Water Transfer Project[C]//ZHUANG Fenggan,CHEN Shupeng ed.2001Remote Sensing Technical Forum.Beijing:China Astronautics Publishing House,2001:125–128.(in Chinese))
[4]王学潮,陈书涛,张辉,等.南水北调西线工程地质条件研究[M].郑州:黄河水利出版社,2005.(WANG Xuechao,CHEN Shutao,ZHANG Hui,et al.Study on engineering geological condition of the West Route of South-to-North Water Transfer Project[M].Zhengzhou:Yellow River Conservancy Press,2005.(in Chinese))
[5]王学潮.南水北调西线一期工程的地质条件和隧洞地质问题[C]//王学潮,伍法权主编.南水北调西线工程岩石力学与工程地质探索.北京:科学出版社,2007:3–9.(WANG Xuechao.Geological problems of tunnel and condition of west line of Water Diversion Project from West Route of South-to-North Water Transfer Project[C]//WANG Xuechao,WU Faquan ed.Exploration of Engineering Geology and Rock Mechanical Problems in the West Route of South-to-North Water Transfer Project.Beijing:Science Press,2007:3–9.(in Chinese))
[6]王学潮,马国彦.南水北调西线工程及其主要工程地质问题[J].工程地质学报,2002,10(1):38–45.(WANG Xuechao,MA Guoyan.Introduction to engineering project of West Route of South-to-North Water Transfer Project and its main engineering geological problems[J].Journal of Engineering Geology,2002,10(1):38–45.(in Chinese))
[7]路新景,孙文怀,李金都.南水北调西线工程几个特殊的工程地质和岩石力学问题[J].岩石力学与工程学报,2003,22(5):829–833.(LU Xinjing,SUN Wenhuai,LI Jindu.Special problems of engineering geology and rock mechanics in the West Route of South to-North Water Transfer Project[J].Chinese Journal of Rock Mechanics and Engineering,2003,22(5):829–833.(in Chinese))
[8]李广诚,严福章.南水北调工程概况及其主要工程地质问题[J].工程地质学报,2004,12(4):354–360.(LI Guangcheng,YAN Fuzhang.An overview of the South-to-North Water Transfer Project and its major engineering geological problems in China[J].Journal of Engineering Geology,2004,12(4):354–360.(in Chinese))
[9]王学潮,杨维九,刘丰收.南水北调西线一期工程的工程地质和岩石力学问题[J].岩石力学与工程学报,2005,24(20):3603–3613.(WANG Xuechao,YANG Weijiu,LIU Fengshou.Engineering geology and rock mechanical problems in the West Route of South-to-North Water Transfer Project[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(20):3603–3613.(in Chinese))
[10]黄润秋.西线工程的重大工程地质问题[C]//林凌,刘宝珺编.南水北调西线工程备忘录.北京:经济科学出版社,2006:24–35.(HUANG Runqiu.Important geological problems of West Route of South-to-North Water Transfer Project[C]//LIN Ling,LIU Baojun ed.Memorandum of West Route of South-to-North Water Transfer Project.Beijing:Economic Science Press,2006:24–35.(in Chinese))
[11]王媛,王学潮,王建平,等.南水北调西线工程区水文地质条件评价[J].岩石力学与工程学报,2005,24(20):3614–3619.(WANG Yuan,WANG Xuechao,WANG Jianping,et al.Evaluations for hydrogeological conditions along West Route of South-to-North Water Transfer Project[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(20):3614–3619.(in Chinese))
[12]汪小刚,邢义文,赵剑明,等.西部水工程中的岩土工程问题[J].岩土工程学报,2007,29(8):1129–1134.(WANG Xiaogang,XING Yiwen,ZHAO Jianming,et al.Geotechnical engineering problems associated construction of water resources projects in western China[J].Chinese Journal of Geotechnical Engineering,2007,29(8):1129–1134.(in Chinese))
[13]李起彤.活断层及其工程评价[M].北京:地震出版社,1991:1–158.(LI Qitong.Active fault and engineering evalution[M].Beijing:Earthquake Press,1991:1–158.(in Chinese))
[14]孙广忠.工程活动与地质环境[J].第四纪研究,1996,(2):97–102.(SUN Guangzhong.Engineering exercise and geological environment[J].Quaternary Research,1996,(2):97–102.(in Chinese))
[15]汪一鹏.与工程建设有关的活断层性状研究[C]//石宝珩编.中国地质科学新探索.北京:石油工业出版社,1998:184–192.(WANG Yipeng.Study on characteristics of active fault related to engineering construction[C]//SHI Baoheng ed.New Research on Chinese Geological Science.Beijing:Petroleum Industry Press,1998:184–192.(in Chinese))
[16]闻学泽.四川西部鲜水河—安宁河—则木河断裂带的地震破裂分段特征[J].地震地质,2000,22(3):239–249.(WEN Xueze.Character of rupture segmentation of the Xianshuihe—Anninghe—Zemuhe fault zone,Western Sichuan[J].Seismology and Geology,2000,22(3):239–249.(in Chinese))
[17]伍法权,王学潮,国连杰,等.南水北调西线一期工程区断层活动性及其对工程的影响分析[J].岩石力学与工程学报,2004,23(8):1370–1374.(WU Faquan,WANG Xuechao,GUO Lianjie,et al.Fault activity and its effect on the West Route of South-to-North Water Transfer Project[J].Chinese Journal of Rock Mechanics and Engineering,2004,23(8):1370–1374.(in Chinese))
[18]周荣军,黄润秋,雷建成,等.四川汶川8.0级地震地表破裂与震害特点[J].岩石力学与工程学报,2008,27(11):2173–2183.(ZHOU Rongjun,HUNG Runqiu,LEI Jiancheng,et al.Surface rupture and hazard characteristics of Wenchuan earthquake with magnitude of8.0in Sichuan Province[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(11):2173–2183.(in Chinese))
[19]谢和平,邓建辉,台佳佳,等.汶川大地震灾害与灾区重建的岩土工程问题[J].岩石力学与工程学报,2008,27(9):1781–1791.(XIE Heping,DENG Jianhui,TAI Jiajia,et al.Wenchuan large earthquake and post-earthquake reconstruction-related geotechnical problems[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(9):1781–1791.(in Chinese))
[20]陈生水,霍家平,章为民.“5.12”汶川地震对紫坪铺混凝土面板坝的影响及原因分析[J].岩土工程学报,2008,30(6):795–801.(CHEN Shengshui,HUO Jiaping,ZHANG Weimin.Analysis of effect of“5.12”Wenchuan earthquake on Zipingpu concrete face rock-fill dam[J].Chinese Journal of Geotechnical Engineering,2008,30(6):795–801.(in Chinese))
[21]熊堃,何蕴龙,张艳锋,“5.12”汶川地震时冶勒大坝实测动力反应[J].岩土工程学报,2008,30(10):1575–1880.(XIONG Kun,HE Yunlong,ZHANG Yanfeng.Recorded seismic response of Yele dam during“5.12”Wenchuan earthquake[J].Chinese Journal of Geotechnical Engineering,2008,30(10):1575–1880.(in Chinese))
[22]李兴唐,许兵,黄鼎成,等.区域地壳稳定性研究理论与方法[M].北京:地质出版社,1987:1–231.(LI Xingtang,XU Bing,HUANG Dingcheng,et al.Theory and method of regional crustal stability research[M].Beijing:Geology Press,1987:1–231.(in Chinese))
[23]李兴唐.活动断裂研究与工程评价[M].北京:地质出版社,1991:1–212.(LI Xingtang.Research and engineering application of active faults[M].Beijing:Geological Publishing House,1991:1–212.(in Chinese))
[24]殷跃平.汶川八级地震地质灾害研究[J].工程地质学报,2008,16(4):433–444.(YIN Yueping.Researches on the geo-hazards triggered by Wenchuan earthquake,Sichuan[J].Journal of Engineering Geology,2008,16(4):433–444.(in Chinese))
[25]周江平,宋胜武,曹强.雅砻江锦屏水电工程区域稳定性探讨[J].工程地质学报,2008,16(4):465–469.(ZHOU Jiangping,SONG Shengwu,CAO Qiang.Discussions of earthquake stability of Jinping hydroelectricity on Yalongjiang River[J].Journal of Engineering Geology,2008,16(4):465–469.(in Chinese))
[26]刘传正.环境工程地质学导论[M].北京:地质出版社,1995.(LIU Chuanzheng.An introduction on environmental engineering geology[M].Beijing:Geological Publishing House,1995.(in Chinese))
[27]彭建兵.中国活动构造与环境灾害研究中的若干重大问题[J].工程地质学报,2006,14(1):5–12.(PENG Jianbing.Some important problems to be addressed in research of active tectonics and environmental disasters in China[J].Journal of Engineering Geology,2006,14(1):5–12.(in Chinese))
[28]中华人民共和国行业标准编写组.DL/T5335–2006水电水利工程区域构造稳定性勘察技术规程[S].北京:中国电力出版社,2006.(The Professional Standards Compilation Group of People′s Republic of China.DL/T5335–2006Technical code of regional tectonic stability investigation for hydropower and water resources project[S].Beijing:China Electrical Power Press,2006.(in Chinese))
[29]中华人民共和国国家标准编写组.GB50287–99水利水电工程地质勘察规范[S].北京:中国计划出版社,1999.(The National Standards Compilation Group of People′s Republic of China.GB50287–99Code for water resources and hydropower engineering geological investigation[S].Beijing:China Planning Press,1999.(in Chinese))
[30]陈智梁.西线一期工程区地壳的活动性[C]//林凌,刘宝珺主编.南水北调西线工程备忘录.北京:经济科学出版社,2006:8–23.(CHEN Zhiliang.Crust activity of west route of South-to-North Water Transfer Project[C]//LIN Ling,LIU Baojun ed.Memorandum of West Route of South-North Water Transfer Project.Beijing:Economic Science Press,2006:8–23.(in Chinese)
[31]罗建宁,孙志明.西线工程区及邻近区域地质背景与几点思考[C]//林凌,刘宝珺主编.南水北调西线工程备忘录.北京:经济科学出版社,2006:36–43.(LUO Jianning,SUN Zhiming.Some ideas and geological background of West Route of South-to-North Water Transfer Project and adjacent area[C]//LIN Ling,LIU Baojun ed.Memorandum of West Route of South-North Water Transfer Project.Beijing:Economic Science Press,2006:36–43.(in Chinese))
[32]倪师军,朱利东,伊海生.南水北调西线工程的几个科学问题[C]//林凌,刘宝珺主编.南水北调西线工程备忘录.北京:经济科学出版社,2006:56–64.(NI Shijun,ZHU Lidong,YIN Haisheng.Several scientific problems of West Route of South-to-North Water Transfer Project[C]//LIN Ling,LIU Baojun ed.Memorandum of West Route of South-North Water Transfer Project.Beijing:Economic Science Press,2006:56–64(in Chinese))
[33]张辉,王学潮,向宏发.南水北调西线一期工程区构造稳定性分析[J].岩石力学与工程学报,2005,24(20):3657–3663.(ZHANG Hui,WANG Xuechao,XIANG Hongfa.Tectonic stability analysis for West Route of South-to-North Water Transfer Project[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(20):3657–3663.(in Chinese))
[34]中国地震局地质研究所.南水北调西线一期工程沿线断裂活动性评价与地震区划报告[R].北京:中国地震局地质研究所,2008.(Geology Institute of China Earthquake Administration.Active fault assess and earthquake zoning plan of West Route of South-to-North Water Transfer Project[R].Beijing:Geology Institute of China Earthquake Administration,2008.(in Chinese))
[35]杨春和,冒海军,王学潮,等.板岩遇水软化后的微观结构特征及力学特性研究[J].岩土力学,2006,27(12):2090–2098.(YANG Chunhe,MAO Haijun,WANG Xuechao,et al.Study on variation of microstructure and mechanical properties of water-weakening slates[J].Rock and Soil Mechanics,2006,27(12):2090–2098.(in Chinese))
[36]冒海军,杨春和,刘江,等.板岩蠕变特性试验研究与模拟分析[J].岩石力学与工程学报,2006,25(6):1204–1209.(MAO Haijun,YANG Chunhe,LIU Jiang,et al.Testing study and modeling analysis of creep behavior of slates[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(6):1204–1209.(in Chinese))
[37]郭啟良,伍法权,钱卫平,等.乌鞘岭长大深埋隧道围岩变形与地应力关系的研究[J].岩石力学与工程学报,2006,25(11):2194–2199.(GUO Qiliang,WU Faquan,QIAN Weiping,et al.Study on relationship between deformation of surrounding rock in-situ stress in Wushaoling deep-buried railway tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(11):2194–2199.(in Chinese))
[38]张宇,何川,伍晓军.复杂地质条件下隧道三维变形规律分析[J].岩土工程学报,2007,29(10):1465–1471.(ZHANG Yu,HE Chuan,WU Xiaojun.Analysis of3D deformation of tunnels under complex geological conditions[J].Chinese Journal of Geotechnical Engineering,2007,29(10):1465–1471.(in Chinese))
[39]尚彦军,史永跃,曾庆利,等.昆明上公山隧道复杂地质条件下TBM卡机及护盾变形问题分析和对策[J].岩石力学与工程学报,2005,24(21):3858–3863.(SHANG Yanjun,SHI Yongyue,ZENG Qingli,et al.TBM jamming and deformation in complicated geological conditions and engineering measures[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(21):3858–3863.(in Chinese))
[40]王广德,石豫川,葛华,等.岩爆与围岩分类[J].工程地质学报,2006,14(1):81–89.(WANG Guangde,SHI Yuchuan,GE Hua,et al.Rockburst and classification of surrounding rock masses[J].Journal of Engineering Geology,2006,14(1):81–89.(in Chinese))
[41]张镜剑,傅冰骏.岩爆极其判据和防治[J].岩石力学与工程学报,2008,27(10):2034–2042.(ZHANG Jingjian,FU Bingjun.Rockburst and its criteria and control[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(10):2034–2042.(in Chinese))
[42]王石春.隧道掘进机与地质因素关系综述[J].世界隧道,1998,(2):39–43.(WANG Shichun.Relationship between TBM tunneling and geological conditions[J].World Tunnel,1998,(2):39–43.(in Chinese))
[43]伊俊涛,尚彦军,傅冰骏,等.TBM掘进技术发展及有关工程地质问题分析和对策[J].工程地质学报,2005,13(3):389–397.(YIN Juntao,SHANG Yanjun,FU Bingjun,et al.Development of TBM excavation technology and analyses and countermeasures of related engineering geological problems[J].Journal of Engineering Geology,2005,13(3):389–397.(in Chinese))
[44]尚彦军,杨志法,曾庆利,等.TBM施工遇险工程地质问题分析和失误的反思[J].岩石力学与工程学报,2007,26(12):2404–2411.(SHANG Yanjun,YANG Zhifa,ZENG Qingli,et al.Retrospective analysis of TBM accidents from its poor flexibility to complicated geological conditions[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(12):2404–2411.(in Chinese))
[45]BARTON N.TBM tunneling in jointed and rock[M].Rotterdam:A.A.Balkema,2006.
[46]杨林德,闫小波,刘成学.软岩渗透性、应变及层理关系的试验研究[J].岩石力学与工程学报,2007,26(3):473–477.(YANG Linde,YAN Xiaobo,LIU Chengxue.Experimental study on relationship among permeability,strain and bedding of soft rock[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(3):473–477.(in Chinese))
[47]王媛,秦峰,李冬田.南水北调西线工程区地下径流模数、岩体透水性及隧洞涌水量预测[J].岩石力学与工程学报,2005,24(20):3673–3678.(WANG Yuan,QIN Feng,LI Dongtian.Groundwater runoff modulus,rock permeability and prediction of water quantities of tunnel in West Route of South-to-North Water Transfer Project[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(20):3673–3678.(in Chinese))
[48]殷黎明,杨春和,王贵宾,等.地应力对裂隙岩体渗流特性影响研究[J].岩石力学与工程学报,2005,24(17):3071–3075.(YIN Liming,YANG Chunhe,WANG Guibin,et al.Study on effect of geostress on permeability of fractured rock mass[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(17):3071–3075.(in Chinese))
[49]王纯祥,蒋宇静,江崎哲郎,等.复杂条件下长大隧道涌水预测及其对环境影响评价[J].岩石力学与工程学报,2008,27(12):2411–2417.(WANG Chunxiang,JIANG Yujing,ESAKI T,et al.Prediction of ground inflow in long tunnel and its influence on environment under complex conditions[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(12):2411–2417.(in Chinese))
[50]王建秀,朱合华,叶为民.隧道涌水量的预测及其工程应用[J].岩石力学与工程学报,2004,23(7):1150–1153.(WANG Jianxiu,ZHU Hehua,YE Weimin.Forward and inverse analyses of water flow into tunnels[J].Chinese Journal of Rock Mechanics and Engineering,2004,23(7):1150–1153.(in Chinese))