引文
[1]CUI Peng,ZHU Yingyan,HAN Yongshun,et al.The12 May Wenchuan earthquake-induced landslide lakes:distribution and preliminary risk evaluation[J].Landslides,2009,6(3):209-223.
[2]陈晓清,崔鹏,程尊兰,等.5.12汶川地震堰塞湖危险性应急评估[J].地学前缘,2008,15(4):244-249.CHEN Xiaoqing,CUI Peng,CHENG Zunlan,et al.Emergency risk assessment of dammed lakes caused bythe Wenchuan earthquake on May 12,2008[J].EarthScience Frontiers,2008,15(4):244-249.
[3]四川省地震局.1933年叠溪地震[M].成都:四川科学技术出版社,1983:1-69.
[4]LIU Ning,ZHANG Jianxin,LIN Wei,et al.DrainingTangjiashan barrier lake after Wenchuan earthquake andthe flood propagation after the dam break[J].Sciencein China Series E:Technological Sciences,2009,52(4):801-809.
[5]邱炽兴,李书健.绵远河小岗剑(上)堰塞湖应急排险处理[J].水利水电技术,2008,39(8):36-38.QIU Chixing,LI Shujian.Emergency treatment ofXiaogangjian barrier lake,Mianyuan Rive[J].WaterResources and Hydropower Engineering,2008,39(8):36-38.
[6]李虎章,刘松林.唐家山堰塞湖成功排险综述[J].水利水电技术,2008,39(8):15-18.LI Huzhang,LIU Songlin.Review of successfultreatment of Tangjiashan barrier lake[J].WaterResources and Hydropower Engineering,2008,39(8):15-18.
[7]陈晓清,崔鹏,赵万玉,等.5.12汶川地震堰塞湖应急处置措施的讨论:以唐家山为例[J].山地学报,2010,26(6):733-738.CHEN Xiaoqing,CUI Peng,ZHAO Wanyu,et al.Adiscussion of emergency treatment of dammed lakecaused by“5.12”Wenchuan earthquake[J].Journalof Mountain Science,2010,26(6):733-738.
[8]郑守仁.三峡工程三期围堰及截流设计关键技术问题[J].人民长江,2002,33(1):7-9.ZHENG Shouren.Key technical issues in the design ofstageⅢcofferdam and river closure of TGP[J].Yangtze River,2002,33(1):7-9.
[9]郭红民,宁晶,蒋文秀,等.大型水利工程截流龙口护(垫)底的试验研究及工程实践[J].三峡大学学报:自然科学版,2007,29(6):481-485.GUO Hongmin,NING Jing,JIANG Wenxiu,et al.Experimental research and engineering practice on riverclosure by filling up gap s bottom[J].Journal of ChinaThree Gorges University:Natural Sciences,2007,29(6):481-485.
[10]袁光裕.水利工程施工[M].北京:中国水利水电出版社,1996:30-36.
[11]周克己,鲁志勇.水利工程施工[M].北京:中央广播电视大学出版社,2006:27-33.
[12]陈晓清,崔鹏,游勇,等.一种人工调控排泄流量的堰塞湖处置方法及其应用:中国,200910216148.8[P].2009-11-05.
[13]吴持恭.水力学[M].北京:高等教育出版社,2003:310-345.
[14]徐锡荣,刘刚,徐松年,等.透水框架四面体防洪护岸试验研究[J].水利水电科技进展,2007,27(5):65-68.XU Xirong,LIU Gang,XU Songnian,et al.Experimental study on flood and bank protection bytetrahedron permeable frames[J].Advances inScience and Technology of Water Resources,2007,27(5):65-68.
[15]杨火其,王文杰.钱塘江河口异型块体抗冲稳定特性试验研究[J].长江科学院院报,2001,18(2):19-22.YANG Huoqi,WANG Wenjie.Experimental study ofprofiled-block stability in Qiantangjiang estuary[J].Journal of Yangtze River Scientific Research Institute,2001,18(2):19-22.
[16]唐洪武,李福田,肖洋,等.四面体框架群护岸型式防冲促淤效果试验研究[J].水运工程,2002(9):25-28.TANG Hongwu,LI Futian,XIAO Yang,et al.Experimental study on effect of scour prevention andsedimentation promotion of bank protection oftetrahedron penetrating frame groups[J].Port&Waterway Engineering,2002(9):25-28.
[17]姚仕明,卢金友,罗恒凯.长江中下游护岸工程新材料新技术试验研究[J].人民长江,2006,37(4):79-80.YAO Shiming,LU Jinyou,LUO Hengkai.Experimentstudy on new material and technology of revetmentworks in middle and lower Yangtze River[J].YangtzeRiver,2006,37(4):79-80.
[18]李学海,唐祥甫,刘力中.明渠截流抛投体稳定性研究[J].中国三峡建设,2002(10):26-27.LI Xuehai,TANG Xiangfu,LIU Lizhong.Stabilityresearch on dumped blocks of open channel closure[J].China Three Gorges Construction,2002(10):26-27.
[19]蔡启龙,严毅,刘锦碧.关于混凝土四面体截流材料的探讨[J].水利水电科技进展,2006,26(6):62-65.CAI Qilong,YAN Yi,LIU Jinbi.Discussion ontetrahedron concrete for river closure[J].Advances inScience and Technology of Water Resources,2006,26(6):62-65.
[20]肖焕雄.立堵截流抛石粒径计算研究[J].水电站设计,2000,16(1):1-7.XIAO Huanxiong.Estimation research on riprap grainsize for closure by vertical blockade[J].Design ofHydroelectric Power Station,2000,16(1):1-7.
[21]陈晓清,崔鹏,游勇,等.一种用于泥石流和堰塞坝防冲刷的人工结构体及其应用:中国,200910167888.7[P].2009-10-14.
[22]匡尚富,汪小刚,黄金池,等.堰塞湖溃坝风险及其影响分析评估[J].中国水利,2008(16):17-21.KUANG Shangfu,WANG Xiaogang,HUANG Jinchi,et al.Risk analysis and impact assessment of dam-break in barrier lake[J].China Water Resources,2008(16):17-21.
[23]钱宁,万兆惠.泥沙运动力学[M].北京:科学出版社,1983:123-132.