引文
[1]F.Hage Chehade,I.Shahrour.Numerical Analysis of the Interaction between Twin-tunnels:Influence of the Relative Position and Con-struction Procedure[J].Tunnelling and Underground Space Technology,2008,(23):210-214
[2]李云鹏,王芝银,韩常领.不同围岩类别小间距隧道施工过程模拟研究[J].岩土力学,2006,27(1):11-16Li Yunpeng,Wang Zhiyin,Han Changling.Simulating Study on Construction Process of Tunnels with Small Spacing for DifferentClasses of Surrounding Rocks[J].Rock and Soil Mechanics,2006,27(1):11-16
[3]靳晓光,刘伟,陈少华,等.小间距隧道施工过程数值模拟[C].2003年全国公路隧道学术会议论文集,2003Jin Xiaoguang,Liu Wei,Chen Shaohua,et al.Numerical Simulation of Construction Process of Tunnel with Small Spacing[C].Pro-ceedings of2003Academic Conference of National Road Tunnelling,2003
[4]张玉军,朱维申,杨家岭.近距离双隧道开挖与支护稳定性的粘弹塑性有限元计算[J].岩石力学与工程学报,1999,(增刊):855-859Zhang Yujun,Zhu Weishen,Yang Jialing.Plane Visco-elasto-plastic FEM Calculation for the Stability of the Excavation and LiningStructure of a Nearby Double Tunnel[J].Chinese Journal of Rock Mechanics and Engineering,1999,(Sup.):855-859
[5]李云鹏,王芝银,韩常领,等.考虑地震影响的小间距隧道围岩流变损伤有限元分析[J].长安大学学报,2006,26(2):51-56Li Yunpeng,Wang Zhiyin,Han Changling,et al.Finite Element Analysis of Rheologic Damage and Earthquake Influence on Surround-ing Rock ofSmall Spacing Tunnels[J].Journal of Chang’an University,2006,26(2):51-56
[6]范国文,王先堂.暗挖双连拱隧道穿越浅基础高层楼群区施工技术[J].铁道工程学报,2003,(3):109-116Fan Guowen,Wang Xiantang.Construction Technique for Subsurface Excavation of Double-Hinged Arch Tunnel Crossing High-RiseBuildings Area with Shallow Foundation[J].Journal of Railway Engineering Society,2003,(3):109-116
[7]王怡,王芝银,李云鹏,等.偏压作用下小间距隧道的施工方法研究[J].现代隧道技术,2008,45(3):29-35Wang Yi,Wang Zhiyin,Li Yunpeng,et al.Study on the Construction of Uneven-pressured Twin Tunnels with Small Spacing[J].Mod-ern Tunnelling Technology,2008,45(3):29-35
[8]曲学兵,苏红卫.超浅埋隧道暗挖施工模拟[J].四川建筑科学研究,2002,28(4):51-53Qu Xuebing,Su Hongwei.Construction Simulation of Underground Excavation about Super-shallow-burial Tunnel[J].Building Sci-ence Research of Sichuan,2002,28(4):51-53
[9]张迪.杭州解放路隧道穿越铁路的设计与施工[J].公路隧道,2005,49(1):1-6Zhang Di.Design and Construction of Jiefanglu Tunnel Crossing Exsisting Railway in Hangzhou[J].Road Tunnel,2005,49(1):1-6
[10]陈宇,曾建雄,刘建国,等.既有公路下超浅埋软弱土层四车道隧道施工技术研究[J].铁道标准设计,2005,(10):89-92Chen Yu,Zeng Jianxiong,Liu Jianguo,et al.Research on the Construction Technology for the Four-Track Tunnel on the Super Shal-low Buried Soft Earth under the Existing Road[J].Railway Standard Design,2005,(10):89-92
[11]徐建洋.小净距隧道施工技术及地表沉降的模拟与监测[J].现代隧道技术,2011,48(6):110-116Xu Jianyang.Parallel Tunnels Separated by a Thin Pillar:Construction Technology,Numerical Simulation and Monitoring Analysis ofSurface Settlement[J].Modern Tunnelling Technology,2011,48(6):110-116
[12]刘胜利,施成华,彭立敏,等.小间距隧道施工期间洞室与结构的稳定性评判[J].西部探矿工程,2003,(3):108-111Liu Shengli,Shi Chenghua,Peng Limin,et al.Evaluation on Stability of Chamber and Structure of Small-interval Tunnel during Con-struction[J].West-China Exploration Engineering,2003,(3):108-111
[13]王明年,李志业,刘智成,等.软弱围岩3孔小间距平行浅埋隧道施工力学研究[J].铁道建筑技术,2002,(4):11-14Wang Mingnian,Li Zhiye,Liu Zhicheng,et al.A Study on Construction Mechanics of Three Parallel Shallow Tunnels with Small Spac-ing inWeakSurrounding Rock[J].Railway Construction Technology,2002,(4):11-14
[14]刘洪洲.双洞小净距隧道设计施工的技术应用研究[C].2003年全国公路隧道学术会议论文集,2003Liu Hongzhou.Technical Research of Design and Construction of Twin-bore Tunnels with Small Clear Distance[C].Proceedings of2003Academic Conference of National Road Tunnelling,2003
[15]刘艳青,钟世航,卢汝绥,等.小净距并行隧道力学状态的试验研究[J].岩石力学与工程学报,2000,19(5):590-594Liu Yanqing,Zhong Shihang,Lu Rusui.Experimental Study on Mechanical Characteristics of Twin Tunnels with Small Spacing[J].Chinese Journal of Rock Mechanics and Engineering,2000,19(5):590-594
[16]中交一公院,中国石油大学(北京).小间距隧道设计技术研究报告[R].2008CCCC First Highway Consultants Co.,Ltd,China University of Petroleum(Beijing).Research Report of Design Technique for Tunnelswith Small Spacing[R].2008
[17]苏江.铁路隧道下穿既有公路地层变形特性研究[J].现代隧道技术,2012,49(1):89-95Su Jiang.Study on Characteristics of Stratum Deformation induced by Railway Tunnel Underpassing Existing Highway[J].ModernTunnelling Technology,2012,49(1):89-95