摘要
为了验证用《建筑桩基技术规范》中的公式计算开口钢管桩竖向承载力的合理性,以具体工程为实例,采用规范中的计算公式、MIDAS数值模型和高应变现场检测的方法,对开口钢管桩的竖向承载力进行了比较分析。结果表明:按规范中的计算公式计算得到的竖向承载力明显大于现场检测值;按数值模型分析得到的竖向承载力小于规范中公式的计算值。
In order to prove the reasonableness of the formula of calculating the vertical bearing capacity of open-ended steel pipe piles in "Technical Code for Building Pile Foundations",we take a specific project as an example and comparatively analyze the vertical bearing capacity of open-ended steel pipe piles using the regular computational formula,MIDAS numerical model and high-strain field testing.The results show that the value of vertical bearing capacity calculated with the computational formula in the technical code is significantly larger than that of the site test;while the vertical bearing capacity analyzed with the numerical model is less than the calculated value by the formula in the technical code.
引文
[1]俞振全.钢管桩的设计与施工[M].北京:北京地震出版社,1993.
    [2]张忠苗.桩基工程[M].北京:中国建筑工业出版社,2007.
    [3]李乐铭,尚玉华.大直径钢管桩垂直承载力的试验研究[C]∥交通部第三航务工程局科研所科技成果论文集.上海:上海同济大学出版社,1990.
    [4]Smith To,Willson Randolph.Plugging of Pipe Piles,Recent Develop-ments of Geotechnical Engineering in Soft Ground[C]∥Proceedingsof the Second China-Japan Geotechnical Symposium,2005.
    [5]Chow F C,Jardine R J,Brucy F,et al.Effects of Time on Capacity ofPipe Piles in Dense Marine Sand[J].Journal of geotechnical and geo-environmental engineering,1998,124(3).
    [6]A.De Nicola,M.F.Randolph.Centrifuge modelling of pipe piles insand under axial loads[J].Geotechnique,1999,49(3).
    [7]JTJ 254-98港口工程桩基规范[S].北京:人民交通出版社,1989.
    [8]JGJ 94-2008建筑桩基技术规范[S].北京:建筑工业出版社,2008.
    [9]中南勘查基础工程公司.岩土工程地质勘查报告(武汉超凡物流码头工程)[R].武汉:中南勘查基础工程公司,2009.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心