引文
[1]侯慧,尹项根,游大海,等.国外经验对中国电力系统抗灾型减灾机制的启示[J].电力系统自动化,2008,32(12):89-93.HOU Hui,YIN Xiang-gen,YOU Da-hai,et al.Apocalypse of overseas experiences on emergency anti-disaster mechanism for China power system[J].Automation of Electric Power Systems,2008,32(12):89-93.
[2]赵希正.强化电网安全保障可靠供电——美加“8·14”停电事件给我们的启示[J].电网技术,2003,27(10):1-7.ZHAO Xi-zheng.Strengthen power grid's safety,guarantee power grid's supply——the enlightenment of United States and Canada"8-14"blackout to US[J].Power System Technology,2003,27(10):1-7.
[3]陈向宜,陈允平,李春艳,等.构建大电网安全防御体系——欧洲大停电事故的分析及思考[J].电力系统自动化,2007,31(1):4-8.CHEN Xiang-yi,CHEN Yun-ping,LI Chun-yan,et al.Constructing wide-area security defensive system in bulk power grid——a pondering over the large-scale blackout in the European power grid on November4[J].Automation of Electric Power Systems,2007,31(1):4-8.
[4]鲁顺,高立群,王坷,等.莫斯科大停电分析及启示[J].继电器,2006,34(16):27-31,67.LU Shun,GAO Li-qun,WANG Ke,et al.Analysis and inspiration on blackout of Moscow[J].Relay,2006,34(16):27-31,67.
[5]夏清,徐国新,康重庆.抗灾型电力系统的规划[J].电网技术,2009,33(3):1-7.XIA Qing,XU Guo-xin,KANG Chong-qing.Planning of anti-disaster power system[J].Power System Technology,2009,33(3):1-7.
[6]刘建琴,孙珂,李晖,等.推行差异化设计以提高电网抗灾能力[J].华北电力技术,2009,(3):41-44,54.LIU Jian-qin,SUN Ke,LI Hui,et al.Practicing different design for improving grid ability against calamity[J].North China Electric Power,2009,(3):41-44,54.
[7]徐国新,夏清,康重庆.抗灾型电网规划模式与模型[J].电力系统自动化,2010,34(3):17-21.XU Guo-xin,XIA Qing,KANG Chong-qing.Practicing different design for improving grid ability against calamity[J].Automation of Power Systems,2010,34(3):17-21.
[8]程飞,刘俊勇,刘莹,等.应对多场景运行的柔性无功规划研究[J].电力系统保护与控制,2010,38(9):43-49,104.CHENG Fei,LIU Jun-yong,LIU Ying,et al.A study of flexible reactive power planning to cope with system multi-scenario operations[J].Power System Protection and Control,2010,38(9):43-49,104.
[9]BUYGI M O,BALZER G,SHANECHI H M,et al.Market-based transmission expansion planning[J].IEEE Trans on Power Systems,2004,19(4):2060-2067.
[10]苏玲,张建华,王利,等.微电网相关问题及技术研究[J].电力系统保护与控制,2010,38(19):235-239.SU Ling,ZHANG Jian-hua,WANG Li,et al.Study on some key problems and technique related to microgrid[J].Power System Protection and Control,2010,38(19):235-239.
[11]Moreira C L,Resende F O,Lopes J A P.Using low voltage microgrids for service restoration[J].IEEE Trans on Power Systems,2007,22(1):395-403.
[12]童林旭.城市生命线系统的防灾减灾问题——日本阪神大地震生命线震害的启示[J].城市发展研究,2000,(3):8-12.TONG Lin-xu.Disaster prevention and mitigation issues of urban lifeline systems——the inspiration of Japan's Kobe earthquake lifeline damage[J].Urban Development Research,2000,(3):8-12.
[13]Kroposki B,Basso T,DeBlasio R.Microgrid standards and technologies[C]//IEEE Power and Energy Society General Meeting-Conversion and Delivery of ElectricalEnergy in the21st Century,2008.
[14]徐国新,夏清,康重庆.电网抗灾投资决策方法研究[J].电力系统自动化,2010,30(2):22-27.XU Guo-xin,XIA Qing,KANG Chong-qing.Research on investment decision-making method of disaster-proof power grid[J].Automation of Electric Power Systems,2010,30(2):22-27.