引文
[1]Okamura M.Damage to river dikes.Quick report on the September 26,2003 Tokachi-Oki Earthquake,Japan,e-Newsletter,Buildingand Fire Res[C]//Lab.National Institute of Standards&Technology,2003.
[2]Sakamoto T.,etal.Numerical simulation of sliding of anearth dam during the1995Kobe earthquake[C]//The22ndUSSD AnnualMeeting and Conference Pre-conference Workshop 3rd U.S.-Japan Workshop on Advanced Research on Earthquake Engineering forDams,2002.
[3]顾淦臣.土石坝地震工程[M].南京:河海大学出版社,1989.10.Gu Ganchen.Earthquake engineering of earth-rock dam[M].Nanjing:Hohai University Press.1989,10.(in Chinese)
[4]Raghvendra Singh,Debasis Roy,Sudhir K.Jain.Analysis of earth dams affected by the2001Bhuj Earthquake[J].EngineeringGeology,2005,80:282~291.
[5]汝乃华,牛运光.大坝事故与安全.土石坝[M].北京:中国水利水电出版社,2001,10.RU Naihua,NIU Yunguang.Dam accidents and safety.Earth-rock dam[M].Beijing:China Water Resources and Hydropower Press.2001,10.(in Chinese)
[6]John Vrymoed,Wallace Lam.Earthquake Performance of Austrian Dam,California during the LOMA PRIETA Earthquake[C]//Proceedings of the Association of State Dam Safety Officials Conference,September 10-14 Boston,MA.
[7]M.Y.O Zkan,M.O Zyazicioglu,U.D.Aksar.An evaluation of Guldurcek dam response during6June2000Orta earthquake[J].SoilDynamics and Earthquake Engineering,2006,(26):405~419.
[8]Isao Nagayama,Yoshikazu Yamaguchi,Takashi Sasaki.Damage to Dams due to Three Large Earthquakes Occurred in2003,in Japan.
[9]Ahmed-W.M.Elgamal,and Ramana V.Gunturi.Dynamic behaviour and seismic response of El Infiernillo Dam[J].Earthquakeengineering and structural dynamics,1993,22:665~684.
[10]中国水电顾问集团西北勘测设计研究院.白龙江碧口水电站工程“5.12”汶川地震震损调查及初步分析报告[R].西安:2008,11.Hydropower Consulting Group NorthwesternInstitution.Seismic review report of BIKOU rockfill dam with earth core[R].Xian,2008,11.(in Chinese)
[11]顾淦臣.国内外土石坝重大事故剖析—对若干土石坝重大事故的再认识(续)[J].水利水电科技进展,1997,(2):16~26.GU Ganchen.Overseas Accident Analysis on Earth-rock Dam—Anew Cognition to Accident Some earth-rock dam[J].Advances InScience and Technology of Water Resources.1997,(2):16~26.(in Chinese)
[12]朱晟,石高峰,周建平.碧口心墙堆石坝抗震复核分析[J].岩石力学与工程学报,2011,30(S1):2954~2962.ZHU Sheng,SHI Gaofeng,ZHOU Jianping.China.Dam's Earthquake Damage Analysis of Bikou Hydropower Station in“5.12”Wenchuan Earthquake.Journal of Rock Mechanics and Engineering.2011,30(S1):2954~2962.(in Chinese)
[13]朱晟,杨鸽,周建平等.紫坪铺面板堆石坝静动力初步反演研究[J].四川大学学报,2010,(5):113~119.ZHU Sheng,YANG Ge,ZHOU Jianping,etc.Back Analysis on Static and Dynamic Characteristics of Zipingpu CFRD under 5.12Wenchuan Earthquake[J].Journal of Sichuan University.2010,(5):113~119.(in Chinese)
[14]SL203-97,DL5073-2000.水工建筑物抗震设计规范[S].SL203-97,DL5073-2000.Specifications for seismic design of hydraulic structures[S].(in Chinese)
[15]International Commission on Large Dams:Guidelines for Selecting Seismic Parameters for Larger Dams[S].1988.
[16]Federal Guidelines for Dam Safety:Earthquake Analyses and Design of Dams,FEMA65[S].2005.
[17]Canadian Dam Safety Association.Dam Safety Guidelines[S].1995.
[18]Reilly N.Comparison of some European guidelines for the seismic assessment of dams[M].London:Thomas Telford,2004.
[19]Austrian Federal Ministry for Agriculture and Forestry,Austrian Commission on Dams Earthquake Analysis of Dams[S].1996.
[20]陈厚群.汶川地震后对大坝抗震安全的思考[J].中国工程科学,2009,(6):44~53.CHEN Houqun.Condideration on Seismic Safety of Dams in China after the Wenchuan Earthquake[J].Chinese EngineeringSciences.2009,(6):44~53.(in Chinese)
[21]张楚汉,金峰,潘坚文等.论汶川地震后我国高坝抗震标准问题[J].水利水电技术,2009,(8):74~79.ZHANG Chuhan,JIN Feng,PAN Jianwen,etc.On seismic fortification criteria after Wenchuan Earthquake for high dam in China[J].Water Resources and Hydropower Engineering.2009,(8):74~79.(in Chinese)
[22]Building Seismic Safety Council.2003Edition NEHRP Recommended Provisions for the Development of Seismic Regulations for NewBuildings and Other Structures,FEMA450,Part 1(Provisions)and Part 2(Commentary),developed for the Federal EmergencyManagement Agency[C]//Washington DC.2004.
[23]Hardin B O,Drnevich V P.Shear modulus and damping in soil:design equation and curves[J].Journal of the Soil Mechanics andFoundations Division,ASCE,1972,7:667~692.
[24]李万红,汪闻韶.无黏性土动力剪应变模型[J].水利学报,1993,(9):11~17.LI Wanhong,WANG Wenshao.Dynamic Shearing Strain model of Cohesionless Soil[J].Journal of Hydraulic Engineering.1993,(9):11~17.(in Chinese)
[25]沈珠江,徐刚.堆石的动力变形特性[J].水利水运科学研究,1996,6(2):143~150.SHEN Zhujiang,XU Gang.The Dynamic Deformation Characteristics of Rockfill[J].Journal of Nanjing hydraulic research institute.1996,6(2):143~150.(in Chinese)
[26]朱晟,周建波.粗粒筑坝材料的动力变形特性[J].岩土力学,2010,(5):1375~1380.ZHU Sheng,ZHOU Jianbo.Deformation behavior of coarse grained materials under cyclic loading[J].Rock and Soil Mechanics,2010,(5):1375~1380.(in Chinese)
[27]Raghvendra Singh and Debasis Roy.Estimation of Earthquake-Induced Crest Settlements of Embankments[J].American J.ofEngineering and Applied Sciences 2009,2(3):515~525.
[28]ZHU Sheng,GU Jiang.Estimation of Earthquake-induced Permanent Deformation for Earth Dam Based on Seismic Damage.to berepublished.
[29]陈厚群,徐泽平,李敏.汶川大地震和大坝抗震安全[J].水利学报,2008,(10):1158~1167.CHEN Houqun,XU Zeping,LI Min.Wenchuan Earthquake and Dam Seismic Safety[J].Journal of Hydraulic Engineering.2008,(10):1158~1167.(in Chinese)
[30]Elgamal,A.-W.,Scott,R.F.,Succarieh,M.F.,La Villita dam response during five earthquakes including permanent deformation[J].J.Geotech.Eng.114,1990,1443~1462.