引文
[1]李术才,薛翊国,张庆松,等.高风险岩溶地区隧道施工地质灾害综合预报预警关键技术研究[J].岩石力学与工程学报,2008,28(7):1297-1307Li Shucai,Xue Yiguo,Zhang Qingsong,et al.Key technology study on comprehensive prediction and early-warning ofgeological hazards during tunnel construction in high-risk karst areas[J].Chinese Journal of Rock Mechanics andEngineering,2008,28(7):1297-1307
[2]李术才,李树忱,张庆松,等.岩溶裂隙水与不良地质情况超前预报研究[J].岩石力学与工程学报,2007,26(2):217-225Li Shucai,Li Shuchen,Zhang Qingsong,et al.Forcast of karst-fractured groundwater and defective geological conditions[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(2):217-225
[3]张庆松,李术才,韩宏伟,等.岩溶隧道施工风险评价与灾害防治技术研究[J].山东大学学报(工学版),2009,39(3):106-110Zhang Qingsong,Li Shucai,Han Hongwei,et al.Study on risk evaluation and water inrush disaster preventingtechnology during construction of karst tunnels[J].Journal of Shandong University(Engineering Science),2009,39(3):106-110
[4]钱七虎,戎晓力.中国地下工程安全风险管理的现状、问题及相关建议[J].岩石力学与工程学报,2008,27(4):649-655Qian Qihu,Rong Xiaoli.State issues and relevant recommendations for security risk management of China’sunderground engineering[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(4):649-655
[5]黄宏伟.隧道及地下工程建设中的风险管理研究进展[J].地下空间与工程学报,2006,2(1):13-20Huang Hongwei.State-of-the-art of the research on risk management in construction of tunnel andunderground works[J].Chinese Journal of Underground Space and Engineering,2006,2(1):13-20
[6]陈龙,黄宏伟.岩石隧道工程风险浅析[J].岩石力学与工程学报,2005,24(1):110-115Chen Long,Huang Hongwei.Risk analysis of rocktunnel engineering[J].Chinese Journal of Rock Mechanics andEngineering,2005,24(1):110-115
[7]SEN Degn Eskesen,Tengborg PER,JGEN Kampmann,et al.Guidelines for tunnelling risk management:International tunnelling association,working group No.2[J].Tunnelling and Underground Space Technology,2004,19:217-237
[8]Cancelli A,Crosta G.Hazardand risk assessment in rock fall proneareas.In:Risk and reliability in ground engineering[M].London:Institute of Civil Engineering;1993:177-90
[9]Einstein H H.Risk and risk analysis in rock engineering[J].Tunnelling and Underground Space Technology,1996,11(2):141-155
[10]Shin Hyusoung,Kwon Youngcheul,Jung Yongsoo,et al.Methodology for quantitative hazard assessment for tunnelcollapses based on case histories in Korea[J]International Journal of Rock Mechanics&Mining Sciences,2009,(46):1072-1087
[11]Alan N Beard.Tunnel safety,risk assessment and decision-making[J].Tunnelling and Underground Space Technology,2010,(25):91-94
[12]Rita L Sousa,Herbert H Einstein.Risk analysis during tunnel construction using Bayesian Networks Porto Metro case[J].Tunnelling and Underground Space Technology,2011,27(1):1-15
[13]Benardos A G,Kaliampakos D C.A methodology for assessing geotechnical hazards for TBM tunnelling-illustrated by theAthens Metro,Greece[J].Int J Rock Mech Min Sci,2004,41:987-99
[14]Ondrˇej Nvlt,Samuel Prívara,LukáFerkl.Probabilistic risk assessment of highway tunnels[J].Tunnelling andUnderground Space Technology,2011,(26):71-82
[15]沈荣喜,吴秀仪,刘长武,等.海底隧道施工过程中突水风险研究[J].武汉理工大学学报(交通科学与工程版),2008,32(3):385-388Shen Rongxi,Wu Xiuyi,Liu Changwu,et al.Research of water inrush on subsea tunnel construction[J].Journal ofWuhan University of Technology(Transportation Science&Engineering),2008,32(3):385-388
[16]许振浩,李术才,李利平,等.基于层次分析法的岩溶隧道突水突泥风险评估[J].岩土力学,2011,32(6):1757-1765Xu Zhenhao,Li Shucai,Li Liping,et al.Risk assessment of water or mud inrush of karst tunnels based on analytichierarchy process[J].Rock and Soil Mechanics,2011,32(6):1757-1765
[17]李利平,李术才,陈军,等.基于岩溶突涌水风险评价的隧道施工许可机制及其应用研究[J].岩石力学与工程学报,2011,30(7):1345-1354Li Liping,Li Shucai,Chen Jun,et al.Construction license mechanism and its application based on comprehensive riskevaluation[J].Chinese Journal of Rock Mechanics and Engineering,2011,30(7):1345-1354
[18]王燕,黄宏伟,薛亚东.钻爆法施工隧道塌方风险分析[J].沈阳建筑大学学报(自然科学版),2009,25(1):23-27Wang Yan,Huang Hongwei,Xue Yadong.Risk analysis of collapse for tunnels constructed by drill and blast metohd[J].Journal of Shenyang Jianzhu University(Nutural Science),2009,25(1):23-27
[19]周建昆,吴坚.岩石公路隧道塌方风险事故树分析[J].地下空间与工程学报,2008,4(6):991-998Zhou Jiankun,Wu Jian.Fault tree analysis of the collapse risk in rock highway tunnel[J].Chinese Journal ofUnderground Space and Engineering,2008,4(6):991-998
[20]陈洁金,周峰,阳军生,等.山岭隧道塌方风险模糊层次分析[J].岩土力学,2009,30(8):2365-2370Chen Jiejin,Zhou Feng,Yang Junsheng,et al.Fuzzy analytic hierarchy process for risk evaluation of collapse duringconstruction of mountain tunnel[J].Rockand Soil Mechanics,2009,30(12):3622-3626
[21]安永林,彭立敏,吴波,等.隧道坍方突发性事件风险可拓法综合评估[J].中南大学学报(自然科学版),2011,42(2):514-520An Yonglin,Peng Limin,Wu Bo,et al.Comprehensive extension assessment on tunnel collapse risk[J].Journal ofCentral South University(Science and Technology),2011,42(2):514-520
[22]彭立敏,安永林,张运良,等.可拓法识别勘测阶段隧道瓦斯突出的模型与实例[J].土木工程学报,2008,41(4):81-85Peng Limin,An Yonglin,Zhang Yunliang,et al.Identifying degree of gas ejection based extension theory in tunnel atprospecting stage:a case study[J].China Civil Engineering Journal,2008,41(4):81-85
[23]曹树刚,王艳平,刘延保,等.基于危险源理论的煤矿瓦斯爆炸风险评价模型[J].煤炭学报,2006,31(4):470-474Cao Shugang,Wang Yanping,Liu Yanbao,et al.Risk assessmentmodel of gas explosion in coal mine based on thehazard theory[J].Journal of China Coal Society,2006,31(4):470-474
[24]聂百胜,何学秋,王恩元,等.煤与瓦斯突出预测技术研究现状及发展趋势[J].中国安全科学学报,2003,13(6):40-43Nie Baisheng,He Xueqiu,Wang Enyuan,et al.Present situation and progress trend of prediction technology of coal andgas outburst[J].China Safety Science Journal,2003,13(6):40-43
[25]中华人民共和国建设部.建质[2007]254号地铁及地下工程建设风险管理指南[S].北京:中国建筑工业出版社,2007Ministry of construction of the People’s Republic of China.Guideline of risk management for construction of subwayand underground works[S].Beijing:China Architecture&Building Press,2007
[26]程乾生.属性识别理论模型及其应用[J].北京大学学报(自然科学版),1997,33(1):12-20Cheng Qiansheng.Attribute recognition theoretical model with application[J].Universitatis Pekinnensis,ActaScientianrum Naturalium,1997,33(1):12-20
[27]程乾生.属性集和属性综合评价系统[J].系统工程理论与实践,1997,17(9):1-8Cheng Qiansheng.Attribute sets and attribute synthetic assessment system[J].Systems Engineering Theory&Practice,1997,17(9):1-8
[28]文畅平,杨果林.基于属性数学理论的岩土边坡地震稳定性评价[J].中国铁道科学,2010,31(5):8-14Wen Changping,Yang Guolin.The seismic stability evaluation of the rock and soil slope based on the attributemathematical theory[J].China Railway Science,2010,31(5):8-14
[29]许振浩,李术才,张庆松,等.TSP超前地质预报地震波反射特性研究[J].地下空间与工程学报,2008,4(4):640-644Xu Zhenhao,Li Shucai,Zhang Qingsong,et al.Reflection characteristic of seismic wave in TSP advance geologicalprediction[J].Chinese Journal of Underground Space and Engineering,2008,4(4):640-644
[30]邱道宏,李术才,张乐文,等.基于TSP203系统和GA-SVM的围岩超前分类预测[J].岩石力学与工程学报,2010,29(增1):3221-3226Zhang Daohong,Li Shucai,Zhang Lewen,et al.Prediction of surrounding rock classification in advance based onTSP203 system and GA-SVM[J].Chinese Journal of Rock Mechanics and Engineering,2010,29(s1):3221-3226