引文
[1]邓有平,王荣明,李坚.江西某核电站选址地质灾害研究及防治对策[J].资源调查与环境,2008,29(1):61-68.(DENG You-ping,WANG Rong-ming,LI Jian.Research and Countermeasure of Prevention and Cure ofGeological Disasters Appearing in Selecting Location for aCertain Nuclear Power Station in Jiangxi[J].ResourcesSurvey&Environment,2008,29(1):61-68.(in Chi-nese))
[2]马海毅.核电厂工程勘测的若干地质问题[J].电力勘测,2001,(1):38-41.(MA Hai-yi.Some GeologicalQuestions about Investigation in Nuclear Power Station[J].Electric Power Investigation,2001,(1):38-41.(in Chinese))
[3]王德民.辽宁核电站选址和地震地质工作的经验[J].核电工程与技术,1990,3(1):42-46.(WANG De-min.Experience on Siting Nuclear Power Plant in High Earth-quake Intensity Area[J].Nuclear Power Engineering&Technology,1990,3(1):42-46.(in Chinese))
[4]吕涛,杨球玉,耿学勇,等.岩石坚硬程度对核电站地基-基础地震响应特征的影响分析[J].岩土力学,2010,31(4):1319-1325.(LV Tao,YANG Qiu-yu,GENG Xue-yong,et al.Study of Influence of Rock Hard-ness on Characteristic of Seismic Response of Bedrock-Foundation of Nuclear Power Plants[J].Rock and SoilMechanics,2010,31(4):1319-1325.(in Chinese))
[5]石振明,王友权.某核电工程岩体地基均匀性评价[J].水文地质工程地质,2010,37(3):59-62.(SHIZhen-ming,WANG You-quan.Evaluation for the RockFoundation Homogeneousness of on Nuclear Power Engi-neering[J].Hydrogeology&Engineering Geology,2010,37(3):59-62.(in Chinese))
[6]李付安.红沿河核电站核岛负挖施工技术[J].爆破,2009,26(4):41-44.(LI Fu-an.Blasting ExcavationTechnology of Nuclear Island Foundation in HongyanheNuclear Power Station[J].Blasting,2009,26(4):41-44.(in Chinese))
[7]陆凡东,方向,范磊,等.核电站机组基坑负挖爆破振动测试分析[J].工程爆破,2010,16(1):32-34.(LU Fan-dong,FANG Xiang,FAN Lei,et al.Test A-nalysis of Blasting Vibration from Foundation Excavationof Nuclear Power Station Units[J].Engineering Blasting,2010,16(1):32-34.(in Chinese))
[8]夏祥,李海波,李俊如,等.岭澳核电站二期工程基岩爆破安全阀值分析[J],岩土力学,2008,29(11):2945-2951,2956.(XIA Xiang,LI Hai-bo,LI Jun-ru,etal.Research on Vibration Safety Threshold for Rock Un-der Blasting Excavation[J].Rock and Soil Mechanics,2008,29(11):2945-2951,2956.(in Chinese))
[9]傅倬,方向,郭涛,等.田湾核电二期深孔台阶爆破振动监测与分析[J].工程爆破,2008,14(3):74-75,56.(FU Zhou,FANG Xiang,GUO Tao,et al.Mo-nitoring and Analysis on Vibration of Bench Long HoleBlasting in Phase Two Construction of Tianwan NuclearPower Station[J].Engineering Blasting,2008,14(3):74-75,56.(in Chinese))
[10]邓怀中.深孔梯段爆破在阳江核电站厂工程的应用[J].爆破,2007,(1):30-32,35.(DENG Huai-zhong.Application of Deep Hole Blasting in Yangjiang Plant[J].Blasting,2007,(1):30-32,35.(in Chinese))
[11]温尊礼,韩文红,徐全军.核电设施附近基坑开挖爆破振动控制方法初探[J].工程爆破,2007,(3):82-84,81.(WEN Zun-li,HAN Wen-hong,XU Quan-jun.Rough Investigation of Control of Blasting Vibration fromExcavation of Foundation Pit Near Nuclear Power Plant[J].Engineering Blasting,2007,(3):82-84,81.(inChinese))
[12]王晓伟.群堆核电站爆破施工监测系统及其应用[J].武汉大学学报:工学版,2007,40(增1):312-315.(WANG Xiao-wei.Analysis of Blasting Monitoring Sys-tem for Nuclear Power Station with a Group of Reactorsand Its Application[J].Engineering Journal of Wuhan U-niversity,2007,40(Sup.1):312-315.(in Chinese))
[13]任国龙.三门核电循环水泵房基坑开挖对支护体系的爆破振动控制[J].工程爆破,2010,16(1):44-46.(REN Guo-long.Blasting Vibration Control of FoundationPit Excavation on Supporting System of Sanmen NuclearPower Circulating Water Pump House[J].EngineeringBlasting,2010,16(1):44-46.(in Chinese))
[14]胡远志.爆破挤淤技术在核电项目中的应用及安全分析[J].工程爆破,2010,16(1):29-31.(HU Yuan-zhi.Application of Blasting Toe-shooting Method and Its SafetyAnalysis in Nuclear Power Project[J].Engineering Blas-ting,2010,16(1):29-31.(in Chinese))
[15]马明泽,陶钧,王惠良.秦山核电厂的老化及寿期管理[J].中国核电,2010,(2):130-141.(MA Ming-zeTAO Jun,WANG Hui-liang.Aging and Lifetime Man-agement in Nuclear Power Plant[J].China Nuclear Pow-er,2010,(2):130-141.(in Chinese))
[16]夏祥,李海波,张大岩,等.红沿河核电站基岩爆破的控制标准[J].爆炸与冲击.2010,30(1):27-32.(XIA Xiang,LI Hai-bo,ZHANG Da-yan,et al.SafetyThreshold of Blasting-induced rock vibration for Hongyan-he Nuclear Power Plant[J].Explosion and ShockWaves,2010,30(1):27-32.(in Chinese))
[17]代志宏,盛湘衡,李正顺,等.防城港核电厂复杂沉积岩地基稳定性评价[J].电力勘测设计,2009,(6):61-64.(DAI Zhi-hong,SHENG Xiang-heng,LI Zheng-shun,et al.The Stability Evaluation of the Complex Sed-imentary Foundation in Fangchengang Nuclear PowerPlant[J].Electric Power Survey&Design,2009,(6):61-64.(in Chinese))
[18]程家文,高霈生.田湾核电站软土深基坑支护设计研究[J].中国水利水电科学研究院学报,2003,1(2):123-126,133.(CHENG Jia-wen,GAO Pei-sheng.Re-search and Design of Shoring up the Deep Foundation Pitin Soft Soil in TNPP Project[J].Journal of China Institu-te of Water Resources and Hydropower Research,2003,1(2):123-126,133.(in Chinese))
[19]赵同新.三门核电站泵房深基坑支护工程的设计和研究[J].岩土工程界,2009,12(2):37-41.(ZHAOTong-xin.Design and Research of Deep Foundation PitExcavation on Supporting System for Sanmen NuclearPower Station Water Pump House[J].Geotechnical En-gineering World,2009,12(2):37-41.(in Chinese))
[20]FITCH J E,YOUNG P H.Use and Effect of Explosivesin California Water[J].Calif Fish Game,1948,34(2):53-57.
[21]赵杰,王桂萱,裴强,等.某核电厂取水隧洞不同设计方案抗震性能分析[J].防灾减灾学报,2010,26(1):31-35.(ZHAO Jie,WANG Gui-xuan,PEI Qiang,et al.Seismic Analysis of Nuclear Power Project for In-take Tunnel Under Different Design Scheme[J].Journalof Disaster Prevention and Reduction,2010,26(1):31-35.(in Chinese))
[22]Itasca Consulting Group Inc.FLA-3D(Fast LagrangianAnalysis of Continua in 3 Dimensions),Version 3.00,User Manual[R].USA:Itasca Consulting Group Inc,2006.
[23]钱伏华,王开华,方辉煌,等.田湾核电站水泥基灌浆料试验与应用[J].中国核电,2009,2(3):224-229.(QIAN Fu-hua,WANG Kai-hua,FANG Hui-huang,etal.Experiment and Application of Cement-based GroupMaterial in Tianwan NPP[J].China Nuclear Power,2009,2(3):224-229.(in Chinese))
[24]吴波,周庆文.帷幕灌浆在核电站海工建筑物中的应用[J].港工技术,2008,(6):45-46.(WU Bo,ZHOUQing-wen.Application of Impervious Grout Curtain in theMarine Structure of the Nuclear Power Station[J].PortEngineering Technology,2008,(6):45-46.(in Chi-nese))
[25]马青海.核电站工程测量中的形变监测[J].核电工程与技术,1992,5(4):62-65.(MA Qing-hai.The De-formation Monitoring in Daya Bay NPS Engineering Meas-urement[J].Nuclear Power Engineering&Technology,1992,5(4):62-65.(in Chinese))
[26]张晓峰,田新珊,黄彦君,等.内陆核电厂对水库环境的影响——咸宁核电厂为例[J].湖泊科学,2010,22(2):181-188.(ZHANG Xiao-feng,TIAN Xin-shan,HUANG Yan-jun,et al.Impact of Inland Nuclear PowerPlant on Reservoir Environment:A Case on Xianning Nu-clear Power Plant[J].Journal of Lake Sciences,2010,22(2):181-188.(in Chinese))