地震数据质量控制技术研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
随着油田进一步的勘探,大量的历史数据需要重新处理和解释,计算机技术的提高为这些解释技术提供了基础。大批的历史数据由于多种原因不能重新使用,中石油地球科学与钻井项目(简称A1)的实施就是要对这些历史数据进行科学、系统地管理,使之重新得以利用。笔者结合自己的工作经验,总结出在A1项目地震数据加载前地震数据的质量控制的工作流程和注意事项,以及一些常见问题的处理方法,供大家参考。
With further exploration of oilfield, large numbers of historical data require to be processed and interpreted again. Enhanced computer technology has provided foundation for these interpretation technologies. Large quantities of historical data can not be used again because of various of reasons.Implement of the project, PetroChina Geoscience and Drilling, is to manage the historical data scientifically and systematically so that they can be used again. According to their own work experiences, the writers summarized the work flow and caution notes in seismic data quality control before loading them in A1 project, and processing methods in handling some common problems, which will provide reference for people.