综合多种信息提高油田开发方案设计阶段构造模型精度
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
以焉耆盆地宝浪油田宝中区块开发方案设计中建立构造模型的工作为实例,说明在油田开发设计阶段,如何综合利用多种信息,提高构造模型精度。宝中区块整个覆盖三维地震,但地震资料分辨率较低,在完成下侏罗统三工河组3个油组顶面构造图的工作中,首先使用倾角测井资料绘制构造等高线图及构造剖面图,控制工区整体构造形态;结合岩心描述和井间层位对比,了解地层横向变化基本规律及岩性纵向变化以及相应井旁地震道的地震响应;依据勘探阶段完成的构造图,参考据井孔崩落扩径方向确定的现今最大水平主应力方向,恢复古构造并模拟古构造应力场,计算目的层位平面破裂值强度,指示断层和裂缝发育情况;使用均方根振幅剖面解释小断层;完成构造图后,利用平面流体模型、流体分布的重力分异合理性,复查地震解释的断层。根据用该方法完成的最终构造图,部署了3口井,其中宝203井和宝205井实际钻遇的各油组顶面深度与构造图解释深度的误差最大为1.4m,最小为0.4m。图4表3参1(王孝陵摘)
Building structure model in Baolang oil field,
    Yanqi basin during the period of oilfield development plan design is regarded as
    a case study. It shows how to integrate various information to improve the
    precision of the structure model at this stage. 3D seismic data cover Baozhong
    block, however their resolution is very poor. When building top surface structure
    maps of three oilbearing layers in Sangonghe Formation of Jurassic, the dip
    meter data are firstly employed to draw contouring maps and crosssection maps
    of structure in order to control global structure configuration. Lithology description
    and the marker correlation between wells are combined to have a better
    understanding of formation lateral variation, vertical variation of lithology and
    seismic response of 1.4m and 0.4m, respectively. Tectonic stress the near hole
    seismogram. According to the structure map that finished at the exploration stage
    and the direction of recent horizontal maximum stress calculated from direction of
    borehole enlargement, palaeostructure is recovered and palaeostructural stress field
    is simulated. The fracturing value is calculated and faults and fractures are
    indicated. The seismic section of rootmeansquare amplitude is used to interpret
    small faults. When finishing initial structure map, the gravity segregation of fluid
    on the plane is used to check any missedinterpretation faults. Based on the
    final structure map by means of this method, Well Bao203 and Well Bao205
    are arranged. The maximum error and minimum error between actual drilling
    depth and the depth designed by structure maps is
引文
1严俊君(编译).利用岩心、露头、地震资料和弯曲空间分析对加州近岸区PointArguelo油田P0315区块的裂缝评价.北京:石油工业出版社,1985.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心