乌东德高拱坝抗震设计研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
乌东德水电站地处亚欧大陆地震带,其抗震性能受到广泛关注。采用"静力设计、动力调整"方法进行大坝体形设计,并采用现行抗震规范规定的基本分析方法与非线性有限元法对大坝选定体形的抗震性能与抗震安全性进行分析评价,提出了大坝抗震措施和强震监测设计方案。研究结果表明,乌东德高拱坝在设计与校核地震作用下,坝体应力状况较好,与国内几座高拱坝相比,应力水平较低,横缝开度较小,坝肩抗滑稳定裕度大,大坝-坝基系统具有较强的极限抗震能力。
Wudongde Hydropower Station is located in the Eurasian seismic belt,and its seismic safety draws extensive attention.The method of "static design and seismic adjustment" is adopted in the design of the shape of arch dam.The basic analysis method specified by current seismic code and nonlinear FEM are used to analyze the seismic behavior and the seismic safety respectively.The anti-seismic measures and monitoring design scheme of strong earthquake are given.The results show that the stress status of Wudongde high arch dam is in a satisfying state under both design and check earthquake;comparing with other domestic high arch dams,the dam is proved to have lower stress level and smaller transverse joint opening,and the margin of anti-sliding stability of the abutments is relatively large and the dam-foundation system has strong limited seismic bearing capability.
引文
[1]水电水利规划设计总院.混凝土坝抗震安全评价体系研究报告[R].北京:水电水利规划设计总院,2011.
    [2]DL5073-2000水工建筑物抗震设计规范[S].
    [3]曹去修,向光红,崔玉柱.高地震烈度区特高拱坝抗震设计[J].水力发电,2009,35(5):52-55.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心