黄河龙羊峡水电站工程地质勘察概述
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
龙羊峡水电站是黄河上游第一座梯级电站,坝高库大,工程地质条件复杂,工程勘察主要完成于上世纪80年代,本文介绍了该水电站区域稳定性与水库诱发地震、近坝库岸稳定与滑坡涌浪、坝址区工程地质、水文地质及岩土工程勘察工作的主要内容与经验。
Longyangxia Hydropower Station is the first step power station in the upper area of the Yellow River.The dam is very large and high,and the geological conditions are complex.The geotechnical investigation was mainly completed in 1980′s.The main working contents and experiences about the regional stability,the earthquake induced by the reservoir,the stability of the bank near the dam,the surge induced by landslides,the engineering geology,the hydrogeology and the geotechnical investigation in the dam area are introduced.
引文
[1]余仁福,柳培坤.龙羊峡水电工程区域稳定和地震活动研究.黄河龙羊峡水电站勘测设计重点技术问题总结,第一卷.北京:中国电力出版社,1998.
    [2]庆祖荫.龙羊峡水电站近坝库岸稳定及滑坡涌浪评价.黄河龙羊峡水电站勘测设计重点技术问题总结,第一卷.北京:中国电力出版社,1998.
    [3]李天扶.龙羊峡水电站坝址勘测工作总结.黄河龙羊峡水电站勘测设计重点技术问题总结,第二卷.中国电力出版社,2003.
    [4]王志硕.龙羊峡水电站坝区岩体地下水问题总结.黄河龙羊峡水电站勘测设计重点技术问题总结,第二卷.中国电力出版社,2003.
    ①水利电力部西北勘测设计院.黄河龙羊峡水电站技术设计,第三卷,工程地质.1986.
    ①国家电力公司西北勘测设计研究院.黄河龙羊峡水电站工程安全鉴定设计自检报告.1999.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心