岩溶隧道综合超前地质预报应用研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
岩溶隧道灾害预报是隧道快速安全施工的重要技术保障,以沪蓉西高速公路齐岳山隧道为工程背景,通过地质调查和分析,利用TSP地震波探测方法,地质雷达探测和超前水平钻探对YK326+790~YK329+810岩溶发育和岩性变化段进行了预报,基本探明了掌子面前方岩溶发育情况和岩性变化带,为及时制定处理预案提供了科学的依据。
Geological disaster forecast of karst tunnels is an important technical support to safe and fast tunnel constructions.Based on the engineering background of Qiyue Mountain Tunnel in the west section of Hu-Rong Highway,through geological survey and analysis,and using Tunnel Seismic Prediction method,ground penetrating radar,an advanced drilling geological prediction detection was done on the area of YK326+790~YK329+810,and in front of the tunnel face,karst development area and lithology changes belt have been essentially detected.A scientific basis of timely treatment plans are provided.
引文
[1]刘志刚,刘秀峰.TSP在隧道隧洞超前预报中的应用与发展[J].岩石力学与工程学报,2003,22(88):1399-1402.(LIU Zhigang,LIU Xiufeng.TSP ap-plication and development in tunnel forecast[J].Chi-nese Journal of Rock Mechanics and Engineering,2003,22(8):1399-1402.(in Chinese))
    [2]李术才,李树忱,张庆松,等.岩溶裂隙水与不良地质情况超前预报研究[J].岩石力学与工程学报,2007,26(2):217-224.(LI Shucai,LI Shuchen,ZHANGQingsong,et al.Forecast of karst-fracturedgroundwater and defective geological conditions[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(2):217-224.(in Chinese))
    [3]王梦恕.对岩溶地区隧道施工水文地质超前预报的意见[J],铁道勘查,2004,1:7-10(WANG Meng-shu.Hydrologic and Geological Forecast of TunnelConstruction in the Karst District.Railroad Survey[J],2004,1:7-10.(in Chinese))
    [4]刘志刚.概论岩溶或地质复杂隧道隧洞地质灾害超前预报技术[J].铁道建筑技术,2003(2):1-5.(LIUZhigang.On advance geological forecast of tunnels onkarst or varied geological conditions[J].Railway Con-struction Technology,2003(2):1-5.(in Chinese))
    [5]李忠,刘秀峰,黄成麟.提高TSP202超前预报系统探测距离的技术措施的研究[J].岩石力学与工程学报,2003,22(3):472-475.(LI Zhong,LIU Xiufeng,HUANG Chenglin.Study on the Technic methods ofincreasing detection distance of TSP-202 System[J].Chinese Journal of Rock Mechanics and Engi-neering,2003,22(3):472-475.(in chinese))
    [6]张庆松,李术才,孙克国,等.公路隧道超前地质预报应用现状与技术分析[J].地下空间与工程学报,2008,4(4):766-711.(ZHANG Qingsong,LI Shucai,SUNKeguo,et al.Analysis and present state of advance geo-logical forecast technology of highway tunnel[J].Chi-nese Journal of Underground Space and Engineering,2008,4(4):640-644.(in Chinese))
    [7]曲海峰,刘志刚,朱合华.隧道信息化施工中综合地质预报技术[J].岩石力学与工程学报,2006,25(6):1 246?1 251.(QU Haifeng,LIU Zhigang,ZHUHehua.Technique of synthetic geologic prediction intunnel informational construction[J].Chinese Jour-nal of Rock Mechanics and Engineering,2006,25(6):1 246?1 251.(in Chinese))
    [8]许振浩,李术才,张庆松,等.TSP超前地质预报地震波反射特性研究[J].地下空间与工程学报,2008,4(4):640-644.(XU Zhenhao,LI Shucai,ZHANGQingsong,et al.Reflection characteristic of seismicwave in TSP advance geological prediction[J].Chi-nese Journal of underground space and engineering,2008,4(4):640-644.(in Chinese))
    [9]李永鸿,徐光黎,杨银湖,等.地震反射波法技术及其在隧道超前地质预报中的应用研究[J].岩土工程学报,2005,27(10):1181-1184.(LI Yonghong,XUGuangli,YANG Yinhu,et al.Application of earth-quake reflected wave method to geological predictionfor tunneling[J].Chinese Journal of Geotechnical En-gineering,2005,27(10):1181-1184.(in Chinese))
    [10]钟世航,孙宏志,王荣,等.隧道掌子面前方地质预报的现状及发展之路[J].工程地球物理学报,2007,4(3):180-185.(ZHONG Shihang,SUNHongzhi,WANG Rong,et al.The present situa-tion of the geological prediction in front of tunnelface and its development[J].Chinese Journal of En-gineering Geophysics,2007,4(3):180-185.(inChinese))
    [11]薛诩国,李术才,张庆松,等.TSP203超前预报系统探测岩溶隧道的应用研究[J].地下空间与工程学报,2007,12:1187-1191.(XUE Yiguo,LI Shucai,ZHANG Qingsong,et al.Application of TSP203Advanced Prediction to Tunnel in Karst Areas[J].Chinese Journal of Underground Space and Engi-neering,2007,12:1187-1191.(in Chinese))

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心