引文
[1]Wang Zhenrong,Lan Jianghua.Tectonic analysis for theWenchuan great earthquake in the Sichuan Province[J].Journal of Mineral Petrol,2008,28(2):1-5.[王振荣,兰江华.四川汶川大地震的构造分析[J].矿物岩石,2008,28(2):1-5.]
[2]Li Yong,Huang Runqiu,Densmore A L.Basic featuresand research progresses of Wenchuan Ms 8.0 Earthquake[J].Journal of Sichuan University:Engineering Science E-dition.2009,41(3):7-21.[李勇,黄润秋,DensmoreA L等.汶川8.0级地震的基本特征及其研究进展[J].四川大学学报:工程科学版,2009,41(3):7-21.]
[3]Yao Xin,Xu Chong,Dai Fuchu,et al.Contribution of stra-ta lithology and slope gradient to landslides triggered byWenchuan Ms 8 Earthquake,Sichuan,China[J].Geolog-ical Bulletin of China,2009,28(8):1156-1162.[姚鑫,许冲,戴福初,等.四川汶川Ms 8级地震引发的滑坡与地层岩性、坡度的相关性[J].地质通报,2009,28(8):1156-1162.]
[4]Lin Maobin.The huge Wenchuan earthquake and Longmentectonic belt[J].Journal of Chengdu University of Technol-ogy:Science&Technology Edition,2008,35(4):366-370.[林茂炳.汶川大地震与龙门山构造带[J].成都理工大学学报:自然科学版.2008,35(4):366-370.]
[5]Hao Lina,Zhang Zhi.The distribution law of slump-mass inYingxiu-Beichuan fault zone[J].Coal Geology&Explora-tion.2009,37(5):43-46.[郝利娜,张志.映秀—北川断裂带沿线崩滑体分布规律浅析[J].煤田地质与勘探,2009,37(5):43-46.]
[6]Huang Runqiu,Li Weile.Analysis on the number and den-sity of landslides triggered by the 2008 Wenchuan Earth-quanke,China[J].Journal of Geological Hazards and En-vironment Preservation2,009,20(3):1-6.[黄润秋,李为乐.汶川地震触发崩塌滑坡数量及其密度特征分析[J].地质灾害与环境保护,2009,20(3):1-6.]
[7]Yin Yueping.Features of landslides triggered by the Wen-chuan Earthquake[J].Journal of Engineering Geology,20091,7(1):29-38.[殷跃平,汶川八级地震滑坡特征分析[J],工程地质学报,2009,17(1):29-38.]
[8]Qiao Jianping,Pu Xiaohong,Wang Meng,et al.A studyon characteristics of distribution of Earthquake-inducedlandslides and hazard zoning[J].Journal of Catastropholo-gy2,0092,4(2):25-29.[乔建平,蒲晓虹,王萌,等.大地震诱发滑坡的分布特点及危险性区划研究[J].灾害学2,0092,4(2):25-29.]
[9]Yin Yueping.Researches on the geo-hazards triggered byWenchuan Earthquake,Sichuan[J].Journal of Engineer-ing Geology,2008,16(4):433-444.[殷跃平.汶川八级地震地质灾害研究[J],工程地质学报,2008,16(4):433-444.]
[10]Chen Ningsheng,Di Baofeng,Li Zhanlu,et al.The eea-tures and measures of mountain hazards triggered by Earth-quake in Longmenshan Mountains[J].Journal of MountainScience2,0082,6(3):272-275.[陈宁生,第宝锋,李战鲁,等.“5.12”汶川地震龙门山风景区地震次生山地灾害特征与处理[J].山地学报,2008,26(3):272-275.]
[11]Zhang Zhen.Reconstruction problems on aftershock touristindustry of Pengzhou[J].Heilongjiang Science and Tech-nology Information,2008,34:141.[张震.彭州市灾后旅游恢复重建问题思考[J].黑龙江科技信息,2008,34:141.]
[12]Zheng Yaping.Enlightenment from research and manage-ment practices of disaster economics at home and abroad[J].Journal of Catastrophology,2009,24(4):112-117.[郑亚平,基于国内外灾害经济研究与管理实践的启示[J].灾害学,2009,24(4):112-117.]
[13]Lessons from landslide disasters in Europe[M].Italy:Nedies Project2,003.
[14]Michael J Crozier.Landslide hazard and risk:issues,con-cepts and approach[M].Landslide Hazard and Risk.Chi-chester,England:John Wiley&Sons,Ltd2,004:1-40.
[15]Zhang Lijun.Prevention of geological hazard starting fromland use planning[J].Geological Bulletin of China,2009,28(2-3):343-347.[张丽君.从土地利用规划入手提高地质灾害的防治水平-兼议地质灾害风险区划的急迫性与重要性[J].地质通报,2009,28(2-3):343-347.]
[16]Tian Hongling,Qiao Jianping,Zhu Bo,et al.Repaid e-valuation on environment resources carrying capacity ofearthquake stricken area in Chengdu[J].Journal of Si-chuan University:Engineering Science Edition,2009,41(Supp):45-48.[田宏岭,乔建平,朱波,等.基于GIS技术的成都市灾区资源环境承载力快速评价[J].四川大学学报:工程科学版,2009,41(增刊):45-48.]