摘要
PC Cluster集群计算机在大数据量的地震资料解释处理中应用比较广泛,其硬件结构和系统管理比较复杂。本文通过对PC Cluster集群计算机一例故障的分析,具体介绍了PC Cluster集群计算机节点更换及相关系统配置问题的处理方法。
The PC-cluster computers are widely applied to the seismic data processing and interpretation with large data volume, and the hardware structure and the system management are more complicated. The article concretely introduces a method that replaces the nodes of PC-cluster computer and processes the issues of relative system configuration by analyzing a case of broken-down in PC-cluster.