地震对人民的生命财产构成了严重的威胁。传统的抗震设计考虑使用阶段较多,而很少考虑地震对施工阶段结构的影响。对于那些工期长、结构复杂、工程量大的建筑,研究地震对其在施工阶段的影响十分必要。以在建的混凝土结构高层建筑为研究对象,首先以其施工过程和受力特点为基础,分析研究其在施工阶段抗震减震的必要性;然后用定性和定量相结合的方法,从基础工程施工、脚手架体系、模板系统、垂直运输体系、已建成结构、装饰工程施工等方面,对在建高层建筑的震害影响进行深入分析;最后提出诸如正确处理施工与设计的关系、确保施工质量、重视发展计算理论和构造措施、大力应用已有抗震减震技术、加大工程投入等对策来防范在建高层建筑的震害。
Earthquake is a serious threat to the safety of people's lives and property.The traditional design of anti-earthquake only considers the structures in using stage more than construction stage.For long-duration,complex and large projects,it is necessary to study the impacts of the earthquake on the project during the construction stage.For the high-rise buildings under construction which are concrete structures,at first,on the basis of their construction process and loading characteristics,we analyzed the necessity of the study on how to resist and damp earthquake to them.And then we analyzed the earthquake disaster on them in both qualitative and quantitative methods deeply from the following aspects: construction of foundation,scaffolding system,formwork system,vertical transportation system,built structure and decoration work.Finally we proposed some countermeasures such as correctly handling the relationship between construction and design,ensuring the construction quality,paying attention to develop computing theory and structural measures,applying existing anti-earthquake technologies,increasing project investment and so on,to prevent earthquake disaster on high-rise buildings under construction.
引文
[1]郑江,郝际平,李存良,等.法门寺合十舍利塔施工过程力学模拟与分析[J.]工业建筑,2009,39(10):90-113(Zheng Jiang,Hao Jiping,Li Cunliang,et al.Mechanicsemulation and analysis of the Heshi stupa of Famen Templeduring the construction process[J].Industrial Construction,2009,39(10):90-113(in Chinese))
    [2]丛术平,梁书亭.多层框架结构施工力学分析[J.]特种结构,2006,23(4):105-108(Cong Shuping,Liang Shuting.Mechanical analysis in construction of frame structures[J.]Special Structure,2006,23(4):105-108(in Chinese))
    [3]赵国藩,贡金鑫,赵尚传.工程结构生命全过程可靠度[M.]北京:中国铁道出版社,2004
    [4]李建峰.现代土木工程施工技术[M.]北京:中国电力出版社,2008
    [5]东南大学,同济大学,天津大学.混凝土结构[M.]北京:中国建筑工业出版社,2003
    [6]黄士基.高层建筑施工[M].广东:华南理工大学出版社,1997
    [7]周云,李伍平,浣石,等.防灾减灾工程学[M.]北京:中国建筑工业出版社,2007
    [8]张厚先,陈德方.高层建筑施工[M.]北京:北京大学出版社,2006
    [9]完海鹰,洪庆尔,李庆锋.大面积高层钢管脚手架支撑结构破坏模式的分析与工程实践[J.]合肥工业大学学报:自然科学版,2008,31(4):631-634(Wan Haiying,Hong Qinger,Li Qingfeng.Analysis and engineeringpractice of the failure mode of large area and high-levelsteel tube scaffolding support structure[J.]Journal of HefeiUniversity of Technology:Natural Science Edition,2008,31(4):631-634(in Chinese))
    [10]陈龙珠,梁发云,宋春雨,等.防灾工程学导论[M.]北京:中国建筑工业出版社,2006
    [11]舒文超,徐增祥.高层建筑施工中多层钢管模架体系荷载传递分析[J.]建筑施工,2006,28(2):121-123(ShuWenchao,Xu Zengxiang.Analysis of load transmission inmulti-storey steel pipe falsework for high-rise buildingconstruction[J.]Building Construction,2006,28(2:)121-123(in Chinese))