引文
[1]中华人民共和国行业标准编写组.SL264–2001水利水电工程岩石试验规程[S].北京:中国水利水电出版社,2001.(The Professional Standards Complication Group of People′s Republic of China.SL264–2001Specifications for rock tests in water conservancy and hydroelectric engineering[S].Beijing:China Water Power Press,2001.(in Chinese))
[2]刘允芳.岩体地应力与工程建设[M].武汉:湖北科学技术出版社,2000.(LIU Yunfang.Geostress of rock mass and engineering construction[M].Wuhan:Hubei Science and Technology Press,2000.(in Chinese))
[3]BARTON C A,ZOBACK M D.Stress perturbations associated with active faults penetrated by boreholes:possible evidence for near-complete stress drop and a new technique for stress magnitude measurement[J].Journal of Geophysics Research,1994,99(B5):9373–9390.
[4]HAIMSON B C,CORNET F H.ISRM suggested methods for rock stress estimation,part III:Hydraulic fracturing methods[J].International Journal of Rock Mechanics and Mining Sciences,2003,40(7/8):1011–1020.
[5]CORNET F H,DOAN M L,FONTBONNE F.Electrical imaging and hydraulic testing for a complete stress determination[J].International Journal of Rock Mechanics and Mining Sciences,2003,40(7–8):1225–1241.
[6]WILEVEAU Y,CORNET F H,DESROCHES J,et al.Complete in situ stress determination in an argillite sedimentary formation[J].Physics and Chemistry of the Earth,2007,32(8–14):866–878.
[7]肖明.三维初始应力场反演与应力函数拟合[J].岩石力学与工程学报,1989,8(4):337–345.(XIAO Ming.Back analysis of three-dimensional initial geostress field and its stress function fitting[J].Chinese Journal of Rock Mechanics and Engineering,1989,8(4):337–345.(in Chinese))
[8]肖明,刘志明.锦屏二级水电站三维地应力场反演回归分析[J].人民长江,2000,31(9):42–44.(XIAO Ming,LIU Zhiming.Back regression analysis of three-dimensional geostress field of Jinping II hydropower station[J].Yangtze River,2000,31(9):42–44.(in Chinese))
[9]杨林德.初始地应力与围岩时间效应性态参数黏弹性反演计算的边界单元法[J].地下空间,1990,10(2):96–102.(YANG Linde.Using boundary element method to back analyze the initial geostress and timely and sticky rock mass parameters[J].Underground Space,1990,10(2):96–102.(in Chinese))
[10]李守巨,刘迎曦,王登刚.基于遗传算法的岩体初始应力场反演[J].煤炭学报,2001,26(1):13–17.(LI Shouju,LIU Yingxi,WANG Denggang.Inversion procedure of initial stress fields in rock masses based on genetic algorithm[J].Journal of China Coal Society,2001,26(1):13–17.(in Chinese))
[11]梅松华,盛谦,冯夏庭,等.龙滩水电站左岸地下厂房区三维地应力场反演分析[J].岩石力学与工程学报,2004,23(23):4006–4011.(MEI Songhua,SHENG Qian,FENG Xiating,et al.Back analysis of3D in situ stress field of underground power house area of Longtan hydropower station[J].Chinese Journal of Rock Mechanics and Engineering,2004,23(23):4006–4011.(in Chinese))
[12]胡斌,冯夏庭,黄小华,等.龙滩水电站左岸高边坡区初始地应力场反演回归分析[J].岩石力学与工程学报,2005,24(22):4055–4064.(HU Bin,FENG Xiating,HUANG Xiaohua,et al.Regression analysis of initial geostress field for left bank high slope region at Longtan hydropower station[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(22):4055–4064.(in Chinese))
[13]金长宇,马震岳,张运良,等.神经网络在岩体力学参数和地应力场反演中的应用[J].岩土力学,2006,27(8):1263–1266.(JIN Changyu,MA Zhenyue,ZHANG Yunliang,et al.Application of neural network to back analysis of mechanical parameters and initial stress field of rock masses[J].Rock and Soil Mechanics,2006,27(8):1263–1266.(in Chinese))
[14]余卫平,杨健,汪小刚,等.峡谷地区大型地下洞室群岩体初始地应力场反演分析[J].水文地质工程地质,2007,(2):20–24.(YU Weiping,YANG Jian,WANG Xiaogang,et al.Back analysis of initial geostress of underground tunnels in sharp valley[J].Hydrogeology and Engineering Geology,2007,(2):20–24.(in Chinese))
[15]李渝生,王士天.中国西南地区挽近期地壳构造应力场的演化历史及成因机制[J].地质灾害与环境保护,2003,13(1):9–12.(LI Yusheng,WANG Shitian.The evolution and genetic mechanism of crust tectonic stress field since late Cenozoic in southwest China[J].Journal of Geological Hazards and Environment Preservation,2003,13(1):9–12.(in Chinese))
[16]王凯英,马瑾,顾国华,等.1996年川滇地区发生的一次应力转向事件[J].地学前缘,2003,10(特刊):233–239.(WANG Kaiying,MA Jin,GU Guohua,et al.Rotation of stress axis in Sichuan—Yunnan region in1996[J].Earth Science Frontiers,2003,10(Special):233–239.(in Chinese))
[17]钟继茂,程万正.由多个地震震源机制解求川滇地区平均应力场方向[J].地震学报,2006,28(4):337–346.(ZHONG Jimao,CHENG Wanzheng.Determination of directions of the mean stress field in Sichuan—Yunnan region from a number of focal mechanism solutions[J].Acta Seismologica Sinica,2006,28(4):337–346.(in Chinese))
[18]朱焕春,赵海斌.河谷地应力场的数值模拟[J].水利学报,1995,(5):29–36.(ZHU Huanchun,ZHAO Haibin.Numerical simulation for rock stress field in a valley[J].Journal of Hydraulic Engineering,1995,(5):29–36.(in Chinese))
[19]朱焕春,李浩.论岩体构造应力[J].水利学报,2001,(9):81–85.(ZHU Huanchun,LI Hao.On tectonic stress in rock mass[J].Journal of Hydraulic Engineering,2001,(9):81–85.(in Chinese))
[20]黄润秋,王贤能,唐胜传,等.深埋长隧道工程开挖的主要地质灾害问题研究[J].地质灾害与环境保护,1997,8(1):50–68.(HUANG Runqiu,WANG Xianneng,TANG Shengchuan,et al.Research on the main geological hazards of deep buried long tunnel[J].Journal of Geological Hazards and Environment Preservation,1997,8(1):50–68.(in Chinese))
[21]李攀峰,张倬元,刘宏,等.某水电站地下厂房硐室群岩爆预测与防治研究[J].中国地质灾害与防治学报,2004,15(2):39–43.(LI Panfeng,ZHANG Zhuoyuan,LIU Hong,et al.Study of rock burst prediction and prevention for underground of a hydroelectric station Caverns[J].The Chinese Journal of Geological Hazard and Control,2004,15(2):39–43.(in Chinese))
[22]谷明成,何发亮,陈成宗.秦岭隧道岩爆的研究[J].岩石力学与工程学报,2002,21(9):1324–1329.(GU Mingcheng,HE Faliang,CHEN Chengzong.Study of rock burst in Qingling tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2002,21(9):1324–1329.(in Chinese))
[23]吕庆,孙红月,尚岳全,等.深埋特长公路隧道岩爆预测综合研究[J].岩石力学与工程学报,2005,24(16):2982–2988.(LU Qing,SUN Hongyue,SHANG Yuequan,et al.Comprehensive study of prediction of rock burst in deep and over length highway tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(16):2982–2988.(in Chinese))
[24]李树森,聂德新,任光明.岩芯饼裂机制及其对工程地质特性影响的分析[J].地球科学进展,2004,19(增):376–379.(LI Shusen,NIE Dexin,REN Guangming.The fracture mechanism of discal drill core and its influence on characteristic of engineering geology[J].Advances in Earth Sciences,2004,19(Supp.):376–379.(in Chinese))
[25]缪晓军,吴继敏,李景波.圆形洞室岩爆成因分析及其地质灾害研究[J].河海大学学报(自然科学版),2002,30(5):37–40.(MIAO Xiaojun,WU Jimin,LI Jingbo.Causes of rock burst in circular chambers and its geological disaster analysis[J].Journal of Hohai University(Natural Science),2002,30(5):37–40.(in Chinese))
[26]刘允芳,肖本职.西部地区地震活动与地应力研究[J].岩石力学与工程学报,2005,24(24):4502–4508.(LIU Yunfang,XIAO Benzhi.Study of seismic activity and geostress in west China[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(24):4502–4508.(in Chinese))
[27]徐林生,唐伯明,慕长春,等.高地应力与岩爆有关问题的研究现状[J].公路交通技术,2002,(4):48–51.(XU Linsheng,TANG Boming,MU Changchun,et al.Current research situation of high ground stress and rock blasting[J].Technology of Highway and Transport,2002,(4):48–51.(in Chinese))
[28]何思为,向贤礼,卢世杰.高应力区应力与岩爆的关系[J].广东工业大学学报,2002,19(3):1–6.(HE Siwei,XIANG Xianli,LU Shijie.Relationship between the stress and rock burst in highly stressed zone[J].Journal of Guangdong University of Technology,2002,19(3):1–6.(in Chinese))
[29]赵自强,王学潮,随裕红.南水北调西线工程深埋隧洞岩爆与地应力研究[J].华北水利水电学院学报,2002,23(1):48–50.(ZHAO Ziqiang,WANG Xuechao,SUI Yuhong.The deep tunnel rock blasting and crustal stress research on west route project of water transfer from south to north[J].Journal of North China Institute of Water Conservancy and Hydroelectric Power,2002,23(1):48–50.(in Chinese))
[30]徐则民,黄润秋,陈颖辉,等.河谷应力集中及岩体响应[J].工程勘察,2003,(1):4–7.(XU Zeming,HUANG Runqiu,CHEN Yinghui,et al.Stress concentration caused by river valleys and the response of rock mass[J].Geotechnical Investigation and Surveying,2003,(1):4–7.(in Chinese))
[31]王广德,石豫川,葛华,等.岩爆与围岩分类[J].工程地质学报,2006,14(1):83–89.(WANG Guangde,SHI Yuchuan,GE Hua,et al.Rock burst and classification of surrounding rock masses[J].Journal of Engineering Geology,2006,14(1):83–89.(in Chinese))
[32]许东俊,章光,李廷芥,等.岩爆应力状态研究[J].岩石力学与工程学报:2000,19(2):169–172.(XU Dongjun,ZHANG Guang,LI Tingjie,et al.Study of the stress state in rock burst[J].Chinese Journal of Rock Mechanics and Engineering,2000,19(2):169–172.(in Chinese))
[33]汪波,何川,吴德兴,等.基于岩爆破坏形迹修正隧道区地应力及岩爆预测的研究[J].岩石力学与工程学报,2007,26(4):811–817.(WANG Bo,HE Chuan,WU Dexing,et al.Study of modification of geostress and forecast of rock burst based on destructive size of rock burst[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(4):811–817.(in Chinese))