引文
[1]Hewes J T.Seismic design and performance of precast concrete egmental bridge columns[D].La Jolla,CA:Department of Structural Engineer-ing,University of California at San Diego,2002.
[2]Khaleghi B.Use of precast concrete members for accelerated bridge construction in Washington State[C]//Journal of the Transportation ResearchBoard,CD 11-S.Washington,D.C.:Transportation Research Board of the National Academies,2005,187–196.
[3]Seismic design code for prestressed concrete structures[S].Japan Prestresssed Concrete Engineering Association.2002.
[4]Department of Transportation Federal Highway Administration.Connection details for prefabrieated bridge elements and systems[R].US:HIGH-WAY FOR LIFE.2009.
[5]Chou Chung-Che,Chang Hao-Jan,Hewes J T.Two-plastic-hinge and two dimensional finite element models for post-tensioned precast concretesegmental bridge columns[J].Engineering Structures,2013,46:205–217.
[6]兰海燕.预制节段拼装桥墩抗震性能研究现状[J].公路交通科技,2012(6):38-42.LAN Haiyan.Status quo of research on seismic performance of precast segmental assembly piers[J].Technology of Highway and Transport,2012,(6):38-42.(in Chinese)
[7]徐栋.节段施工体外预应力桥梁的极限强度分析[D].上海:同济大学,1999.XU Dong.Ultimate strength analysis of segment construction external prestressing bridge[D].Shanghai:Tongji University,1999.(in Chinese)
[8]李坚,陆元春.预制节段混凝土桥梁的设计与工程实践[J].城市道路与防洪,2003,6:35-38.LI Jian,LU Yuanchun.Design and engineering practice of precast segmental concrete bridge[J].Urban Roads Bridges&Flood Control,2003,6:35-38.(in Chinese)
[9]李国平.全预制混凝土桥梁技术概论[C]//第十八届全国桥梁学术会议论文集,北京:人民交通出版社,2008.146-150.LI Guoping.Introduction of technology on the all precast segmental concrete bridge[C]//The 18th National Meeting on Bridge Technology.Bei-jing:China Communication Press,2008.146-150.(in Chinese)
[10]Li Zhenqiang,Juan David Leiva.Pretensioned precast concrete hollow-ore units used for interchange bridge projects in Honduras[J].PCI Journal,2010,55(2):71-81.
[11]成昆铁路技术总结委员会.成昆铁路-第四册桥梁[M].北京:人民铁道出版社,1980.The Committee of Technology Summary of Chengdu-unming Railway.Chengdu-unming Railway(the forth part)-ridge[M].Beijing:China Rail-way Press,1980.(in Chinese)
[12]铁道部第四勘测设计院.铁路工程设计技术手册《桥梁墩台》[M].北京:中国铁道出版社,1999.China Railway Siyuan Survey and Design Group CO.,LTD.Railway engineering technical manual-Bridge pier and abutment”[M].Beijing:Chi-na Railway Press,1999.(in Chinese)
[13]叶华成.上海长江大桥水上非通航孔墩身预制安装技术[J].桥梁建设,2007,5:55-58.YE Huacheng.Techniques for precasting and installation of pier shafts of Non navigable span of shanghai Changjiang River Bridge[J].BridgeConstruction,2007,5:55-58.(in Chinese)
[14]杨寿忠,陈明华,李斌,等.节段桥梁技术在重庆市新牌坊立交桥中的应用[C]//第十七届全国桥梁学术会议论文集(上册),北京:人民交通出版社,2006.535-540.YANG Shouzhong,CHEN Minghua,LI Bing,et al.The application of the precast segmental bridge in the Xinpaifang overpass In chongqing[C]//The 17th National Meeting on Bridge Technology.Beijing:China Communication Press,2006,535-540.(in Chinese)
[15]彭放.新型预应力装配式桥墩的应用[J].华南港工,1994,2:66-70.PENG Fang.The application of new prestressing precast bridge pier[J].South China Harbour Engineering,1994,2:66-70.(in Chinese)
[16]曾平喜,唐衡,冯永明.杭州湾跨海大桥预制墩身施工技术[C]//2005年全国桥梁学术会议论文集.北京:人民交通出版社,2005:510-523.ZENG Pingxi,TANGHeng,FENG Yongming.The precast segmental pier construction technology of Hanzhou bay bridge[C]//The 17th NationalMeeting on Bridge Technology.Beijing:China Communication Press,2005:510-523.(in Chinese)
[17]王志强,葛继平,魏红一.节段拼装桥墩抗震性能研究进展[J].地震工程与工程振动,2009,29(4):147-154.WANG Zhiqiang,GE Jiping,WEI Hongyi.Recent development in seismic research of segmental bridge columns[J].Journal of Earthquake Engi-neering and Engineering Vibration,2009,29(4):147-154.(in Chinese)
[18]葛继平.节段拼装桥墩抗震性能试验研究与理论分析[D].上海:同济大学,2009.GE Jiping.Experimental and analytical research on seismic performance of precast segmental bridge columns[D].Shanghai:Tongji University,2009.(in Chinese)
[19]杨俊荣.体外预应力装配式桥墩方案设计及有限元分析[D].武汉:武汉理工大学,2011.YAN Junrong.The schematic design and FEA of fabricated piers with external prestressing[D].Wuhan:Wuhan University of Technology.2011.(in Chinese)
[20]Ou Yu-Chen,Tsai Mu-Sen,Chang Kuo-Chun,et al.Cyclic behavior of precast segmental concrete bridge columns with high performance or conven-tional steel reinforcing bars as energy dissipation bars[J].Earthquake Engineering and Structural Dynamics,2010,39:1181–1198.
[21]布占宇,占陈文,石鑫磊,等.节段拼装混凝土桥墩抗震性能研究[J].宁波大学学报:理工版,2011,24(2):83-88.BU Zhanyu,ZHAN Chenwen,SHI Xinlei,et al.Research on seismic resistance of precast segmental concrete bridge piers[J].Journal of NingboUniversity:Natural Science&Engineering Edition,2011,24(2):83-88.(in Chinese)
[22]布占宇,唐光武.无黏结预应力带耗能钢筋预制节段拼装桥墩抗震性能研究[J].中国铁道科学,2011,32(3):33-40.BU Zhanyu,TANG Guangwu.Seismic performance investigation of unbonded prestressing precast segmental bridge piers with energy dissipationbars[J].China Railway Science,2011,32(3):33-40.(in Chinese)
[23]Chou Chung-Che,Hsu Chih-Po.Hysteretic model development and seismic response of unbonde post-tensioned precast CFT segmental bridge col-umns[J].Earthquake Engineering and Structural Dynamics,2008,37:919–934.
[24]Kima T H,Lee H M,Kima Y J,et al.Shin.Performance assessment of precast concrete segmental bridge columns with a shear resistant connectingstructure[J].Engineering Structures,2010,32:1292-1303.
[25]葛继平,王志强.干接缝节段拼装桥墩集中塑性铰模型的地震响应分析[J].工程力学,2010,27(8):185-190.GE Jiping,WANG Zhiqiang.Seismic performance studies of segmental bridge columns with match-cast dry joints using concentrated plastic hingemethod[J].Engineering Mechanics,2010,27(8):185-190.(in Chinese)
[26]葛继平,王志强,魏红一.干接缝节段拼装桥墩抗震分析的纤维模型模拟方法[J].振动与冲击,2010,29(3):52-57.GE Jiping,WANG Zhiqiang,WEI Hongyi.Seismic performance analysis of segmental bridge columns with match-cast dry joints using fiber beam-column element method[J].Journal of Vibration and Shock,2010,29(3):52-57.(in Chinese)
[27]葛继平,王志强.干接缝节段拼装桥墩振动台试验研究[J].工程力学,2011,28(9):122-128.GE Jiping,WANG Zhiqiang.Shake table tests of segmental bridge columns with match-cast dry joints[J].Engineering Mechanics,2011,28(9):122-128.(in Chinese)
[28]陈兴冲.南疆线拼装式桥墩接头抗震试验研究及分析[M].兰州:兰州铁道学院,1997.CHEN Xingchong.Experimental and analysis research of assembled bridge pier joints in the in South Xinjiang Railway[M].Lanzhou:LanzhouInstitute of Railway,1997.(in Chinese)
[29]田琪,陈兴冲,朱东生,等.拼装式桥墩接头的承载能力与滞回特性的试验研究[J].工程力学,1999,16(2):107-113.TIAN Qi,CHEN Xingchong,ZHU Dongsheng,et al.Experimental study on loading capacity and hystertic properties of assembled bridge pier joint[J].Engineering Mechanics,1999,16(2):107-113.(in Chinese)
[30]陈兴冲,虞庐松,田琪,等.拼装式双柱桥墩抗震能力的评估[J].桥梁建设,1998,3:65-67.CHEN Xingchong,YU Lusong,TIAN Qi,et al.Aseismic capacity assessment of the assembly double column piers[J].Bridge Construction,1998,3:65-67.(in Chinese)
[31]Kwan W P,Billington S L.Unbonded posttensioned concrete bridge piers I:Monotonic and cyclic analyses[J].Journal of Bridge Engineering,2003,8(2):92-101.
[32]Kwan W P,Billington S L.Unbonded posttensioned concrete bridge piers II:Seismic analyses[J].Journal of Bridge Engineering,2003,.8(2):102-111.
[33]Hieber D G,Wacker J M.State-of-the-art report on precast concrete systems for rapid construction of bridges[R].Washington:Washington StateTransportation Commission,Department of Transportation,WA-RD 594,2005.
[34]Hieber D G,Wacker J M.Precast concrete pier systems for rapid construction of bridges in seismic regions[R].Washington:Washington StateTransportation Commission,Department of Transportation,WA-RD 611,2005.
[35]Motared S,Saiidi M,Sanders,D.Seismic response of precast bridge columns with energy dissipating joints[R].Nevada:Center for Civil Engi-neering Earthquake Research,Department of Civil and Environmental Engineering,University of Nevada,Reno,Nevada,Report No.CCEER-11-01,2011.
[36]李国平,张喜刚,项海帆.基于性能的混凝土桥梁规范体系的研究计划[J].桥梁,2011,41(3):75-77.LI Guoping,ZHANG Xigang,XIAN Haifang.The research plan of performance-based design code for concrete bridge[J].Bridge,2011,41(3):75-77.(in Chinese)
[37]李建中,管仲国.基于性能桥梁抗震设计理论发展[J].工程力学,2011,S2:24-30.LI Jianzhong,GUAN Zhongguo.Performance-based seismic design for bridges[J].Engineering Mechanics,2011,S2:24-30.(in Chinese)
[38]朱晞江辉.桥梁墩柱基于性能的抗震设计方法[J].土木工程学报,2009,4:85-92.ZHU Xi,JIANG Hui.Performance-based seismic design method for RC bridge piers[J].China Civil Engineering Journal,2009,4:85-92.(inChinese)