引文
1 Qiu Z H,et al.On the cause of ground stress tensile pulsesobserved before the 1976 Tangshan earthquake[J],Bull.Seism.Soc.Am.,1998,88,989-994.
2李茂玮.乌恰7.4级地震的土层应力前兆[J].内陆地震,1987,1(1):77-83.(Li Mouwei.Soil stress precursors ofthe Wuqia M7.4 earthquake[J].Inland Earthquakes,1987,1(1):77-83)
3邱泽华,周龙寿,池顺良.用超限率分析法研究汶川地震的前兆应变变化[J].大地测量与地球动力学,2009,(4):1-4,9.(Qiu Zhehua,Tang Lei and Zhou Longshou.Observed strain changes from 4-component borehole strain-meter network before 2008 Wenchuan earthquake[J].Jour-nal of Geodesy and Geodynamics,2009,(4):1-4,9)
4邱泽华,张宝红,池顺良.汶川地震前姑咱台观测的异常应变变化[J].中国科学:地球科学,2010,40(8):1 031-1 039.(Qiu Zehua,Zhang Baohong and Chi Shunliang.Ab-normal strain changes observed at Guza before the Wenchuanearthquake[J].Science in China,2010,,40(8):1 031-1039.doi:10.1007/s11430-010-0049-4.)
5国家地震局地震地质大队编.有关地应力测量仪器试制等问题的谈话(1968年1月12日)[A].李四光同志有关地震工作谈话选辑[C].1976,23-25.(Brigade of Seismo-geology,State Seismological Bureau.About fabricating instru-ments for ground stress monitoring(on Jan,.12,1968)[A].Selected talks of Li Siguang on earthquake-related work[C].1976,23-25)
6 Hast N.The measurement of rock pressure in mines[M].Stockholm,1958.
7国家地震局地震地质大队编.与中国科学院兰州地球所的几位同志谈地震预报(1966年10月)[A].李四光同志有关地震工作谈话选辑[C].1976,5-6.(Brigade ofSeismo-geology,State Seismological Bureau.Talk with col-leagues of Lanzhou earthquake institute about earthquakeprediction(in Oct.1966)[A].Selected talks of Li Siguangon earthquake-related work[C].1976,5-6)
8国家地震局地震地质大队编.谈地震地质大队的方向和任务(1968年1月8日)[A].李四光同志有关地震工作谈话选辑[C].1976,21-23.(Brigade of Seismo-geology,State Seismological Bureau.About direction and takes of Bri-gade of Seismo-geology(on Jan.8,1968)[A].Selected talksof Li siguang earthquake-related work[C].1976,21-23)
9 Sacks I S and Evertson D W.Sensitive borehole strain-ratemeter[J].Carnegie Inst,Washington Yearb,1971,68:448-453.
10 Sacks I S,et al.Sacks-Evertson strainmeter,its installa-tion in Japan and some preliminary results concerning strainsteps[J].Pap Met Geophys.,1971,22:195-207.
11 Sakata S.On the concept of some newly-invented boreholethree-component strainmeters[J](in Japanese with Englishabstract),Rep Nat Res Center Disaster Pre,1981,25:95-126.
12 Gladwin MT.High precision multi-component borehole de-formation monitoring[J].Rev Sci Instru.1984,55:2011-2016.
13 Ishii H,et al.Development of multi-component borehole in-strument for earthquake prediction study:some observedexamples of precursory and co-seismic phenomena relatingto earthquake swarms and application of the instrument forrock mechanics[A].Seismic process monitoring[C].edi-ted by H.Ogasawara,et al,Rotterdam:Balkema,2002,365-377.
14石井纮.新钻孔地壳活动综合观测装置的开发和观测[R].东浓地震科学研究所,2001.(Ishii H.Developmentof new multi-component borehole instrument[R].Tono Re-search Institute of Earthquake Science(in Japanese),2001,6:5-10)
15 Jaeger J C and Cook N G W.Fundamentals of rock me-chanics[M].Chapman and Hall(London).2nd ed.,1976.
16潘立宙.关于地应力测量的几个公式的推导及讨论[A].全国地应力专业会议论文选编(上)[C].1977,1-41.(Pan Lizhou.On the formulae of ground stress meas-urement[A].Selected papers of the national conference onstress measurement(Part 1)[C].1977,337-348)
17苏恺之.地应力相对测量方法[A].全国地应力专业会议论文选编(上)[C].1977,42-61.(Su Kaizhi.Meth-ods of relative measurement of ground stress[A].Selectedpapers of the national conference on stress measurement(Part 1)[C].1977,42-61)
18欧阳祖熙.RDB-1型电容式地应变计[A].全国地应力专业会议论文选编(下)[C].1977,337-348.(OuyangZuxi.RDB-1 type electric capacity strainmeter[A].Select-ed papers of the national conference on stress measurement(Part 2)[C].1977,337-348)
19池顺良.连续自记压容地应力仪[A].全国地应力专业会议论文选编(下)[C].1977,369-373.(Chi S L.E-lectric capacity stressmeter of automatic continuous record-ing[A].Selected papers of the national conference onstress measurement(Part 2)[C].1977,369-373)
20陈鑫连,张奕麟,蔡惟鑫.地壳变动连续观测技术[M].北京:地震出版社,1989.(Chen X L,Zhang Y L and CaiW X.Techniques of continuous observation of crustal de-formation[M].Beijing:Seismological Press,1989)
21潘立宙.测量地应力的钻孔变形法[A].地应力测量的原理和应用[C].北京:地质出版社,1981,1-47.(PanL Z.Some remarks on the borehole deformation method inmeasuring ground stress[A].in:Principles and applica-tions of ground stress measurements[C].Beijing:Publish-ing House of Geology,1981,1-47)
22 Savin G N.Stress concentration around holes[M].Perga-mon Press,1961.
23 Gladwin M T and R Hart.Design parameters for boreholestrain instrumentation[J].Pageoph,1985,123:59-80.
24骆鸣津,等.用引潮力进行钻孔应变-应力的原地标定[J].地壳形变与地震,1989,(4):8-62.(Luo Mingjin,et al.In-situ calibration of borehole strain-stress with tidalforce[J].Crustal Deformation and Earthquake,1989,(4):8-62)
25 Hart R HG,et al.Tidal calibration of borehole strain met-rics:Removing the effects of small-scale inhomogeneity[J].JGR,1996,101(B11):25 553-25 571.
26邱泽华,石耀霖,欧阳祖熙.四分量钻孔应变观测的实地绝对标定[J].地震,2005,25(3):27-34.(Qiu Z H,ShiY L and Ouyang Z X.Absolute in-situ calibration of 4-component borehole strain observation[J].Earthquake,2005,25(3):27-34)
27 Leeman E R.The measurement of stress in rocks[J].Journal of the South African Institute of Mining and Metal-lurgy,1964,65(2):45-112.
28邱泽华,石耀霖,欧阳祖熙.四分量钻孔应变观测的实地相对标定[J].大地测量与地球动力学,2005,(1):118-122.(Qiu Zehua,Shi Yaolin and Ouyang Zuxi.Relative in-situ calibration of 4-component borehole strainmeters[J].Journal of Geodesy and Geodynamics,2005,(1):118-122)