引文
[1]王梦恕.对岩溶地区隧道施工水文地质超前预报的意见[J].铁道勘查,2004,(1):7-9,18.(WangMengshu.Hydrologic and geological forecast of tunnelconstruction in the Karst district[J].Railroad Survey,2004,(1):7-9,18.(in Chinese))
[2]Tai Tien Wang,Wen Li Wang,Ming Leng Lin.Har-nessing the catastrophic inrush of water into new Yung-churen Tunnel in Taiwan[J].Tunnelling and Under-ground Space Technology,19(2004)418.
[3]Salis M,Duckstein L.Mining under a limestone aquiferin southern Sardinia a multiobjective approach[J].Geotechnical and Geological Engineering,1983,1(4):357-374.
[4]李利平,李术才,张庆松.岩溶地区隧道裂隙水突出力学机制研究[J].岩土力学,2010,31(2):524-528.(Li Liping,Li Shucai,Zhang Qingsong.Study ofmechanism of water inrush induced by hydraulic fractu-ring in Karst tunnels[J].Rock and Soil Mechanics,2010,31(2):524-528.(in Chinese))
[5]Jincai Zhang.Investigations of water inrushes from aqui-fers under coal seam[J],International Journal of RockMechanics&Mining Sciences,42(2005),350-360.
[6]Koji Masuda.Effects of water on rock strength in a brit-tle regime[J].Journal of Structural Geology,2001,23:1 653-1 657.
[7]李利平.高风险岩溶隧道突水灾变演化机理及其应用研究[D].济南:山东大学,2009.(Li Liping.Studyon catastrophe evolution mechanism of Karst water in-rush and its engineering application of high risk Karsttunnel[D].Jinan:Shandong University,2009.(inChinese))
[8]李术才,李树忱,张庆松,等.岩溶裂隙水与不良地质情况超前预报研究[J].岩石力学与工程学报,2007,26(2):217-225.(Li Shucai,Li Shuchen,Zhang Qing-song,et al.Forecast of karst-fractured groundwater anddefective geological conditions[J].Chinese Journal ofRock Mechanics and Engineering,2007,26(2):217-225.(in Chinese))
[9]张雷,赵剑,张和平.隧道涌水量预测的计算方法研究[J].公路交通科技,2007,(1):121-123.(ZhangLei,Zhao Jian,Zhang Heping.Study on calculationmethod for tunnel seepage prediction[J].Technology ofHighway and Transport,2007,(1):121-123.(in Chi-nese))
[10]徐国峰,杨建峰,陈侃福.台缙高速公路苍岭隧道水文地质勘察与涌水量预测[J].岩石力学与工程学报,2005,24(增2):5 531-5 542.(Xu Guofeng,YangJianfeng,Chen Kanfu.Surveying of hydrogeology con-dition and forecasting of water inflow in Cangling tunnelat Taizhou—Jinyun highway[J].Chinese Journal ofRock Mechanics and Engineering,2005,24(Supp.2):5 531-5 542.(in Chinese))
[11]王媛,秦峰,李冬田.南水北调西线工程区地下径流模数、岩体透水性及隧洞涌水量预测[J].岩石力学与工程学报,2005,24(20):3673-3678.(WangYuan,Qin Feng,Li Dongtian.Groundwater runoff mod-ulus,rock permeability and prediction of water quanti-ties of tunnel in west route of south-to-north watertransfer project[J].Chinese Journal of Rock Mechan-ics and Engineering,2005,24(20):3 673-3 678.(inChinese))
[12]李兴高,刘维宁,张昀青.隧道渗涌水量的随机模型预测[J].中国安全科学学报,2002,12(4):60-64.(Li Xinggao,Liu Weining,Zhang Yunqing.Predictingthe amount of water inflow in tunnel by stationary ran-dom model[J].China Safety Science Journal,2002,12(4):60-64.(in Chinese))
[13]王建秀,杨立中,何静.深埋隧道涌水量数值计算中的试算流量法[J].岩石力学与工程学报,2002,21(12):1 776-1 780.(Wang Jianxiu,Yang Lizhong,HeJing.Trial method for simulating tunnel discharge[J].Chinese Journal of Rock Mechanics and Engi-neering,2002,21(12):1 776-1 780.(in Chinese))
[14]徐国峰,杨建峰,陈侃福.台缙高速公路苍岭隧道水文地质勘察与涌水量预测[J].岩石力学与工程学报,2005,24(增2):5 531-5 542.(Xu Guofeng,YangJianfeng,Chen Kanfu.Surveying of hydrogeology con-dition and forecasting of water inflow in Cangling tunnelTaizhou—Jinyun highway[J].Chinese Journal ofRock Mechanics and Engineering,2005,24(Supp.2):5 531-5 542.(in Chinese))
[15]张庆松,李术才,孙克国,等.公路隧道超前地质预报应用现状与技术分析[J].地下空间与工程学报,2008,4(4):766-711.(Zhang Qingsong,Li Shu-cai,Sun Keguo,et al.Analysis and present state ofadvance geological forecast technology of highway tun-nel[J].Chinese Journal of Underground Space andEngineering,2008,4(4):640-644.(in Chinese))
[16]许振浩,李术才,张庆松,等.TSP超前地质预报地震波反射特性研究[J].地下空间与工程学报,2008,4(4):640-644.(Xu Zhenhao,Li Shucai,ZhangQingsong,et al.Reflection characteristic of seismicwave in TSP advance geological prediction[J].ChineseJournal of Underground Space and Engineering,2008,4(4):640-644.(in Chinese))
[17]Andisheh Alimoradi,Ali Moradzadeh,Reza Naderi,etal.Prediction of geological hazardous zones in front ofa tunnel face using TSP-203 and artificial neural net-works[J],Tunnelling and Underground Space Tech-nology,doi:10.1016/j.tust.2008.01.001
[18]何刚,沙椿,丁陈奉,等.TSP-203系统数据采集的改进方案[J].地球物理学进展,2006,21(4):1332-1 337.(He Gang,Sha Chun,Ding Chengfen,et al.Investigation on data acquisition application of TSP-203system[J].Progress in Geophysics,2006,21(4):1 332-1 337.(in Chinese))
[19]李天斌,孟陆波,朱劲,等.隧道超前地质预报综合分析方法[J].岩石力学与工程学报,2009,28(12):2 429-2 436.Li Tianbin,Meng Lubo,Zhu Jin,et al.Comprehensive analysis method for advanced forecastof geology in tunnels[J].Chinese Journal of Rock Me-chanics and Engineering,2009,28(12):2 429-2 436(in Chinese))
[20]刘志刚,刘秀峰.TSP(隧道地震勘探)在隧道隧洞超前地质预报中的应用与发展[J].岩石力学与工程学报,2003,22(8):1399-1402.(Liu Zhigang,LiuXiufeng.TSP application and development in tunnellead forecast[J].Chinese Journal of Rock Mechanicsand Engineering,2003,22(8):1 399-1 402.(in Chi-nese))