预应力混凝土框架柱的箍筋配置
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
柱箍筋配置量的定量计算一直是工程设计人员关心的问题 ,PUSHOVER方法为柱箍筋的配置定量计算的实现提供了可能。从三个方面探讨了柱箍筋的计算 ,指出了抗震设计规范构造配箍在高地震烈度下的不足
The calculation of the stirrups quantity of columns is one of the most concerned things to the structure designers,the PUSHOVER makes it possible to realize the calculation of the strirrups quanitity of columns,the calculation method of the stirrups quantity in three aspects is discussed,it is pointed out that the stirrups quantity of columns is sometimes insufficient with the current aseismic design code under major earthquakes.
引文
1 ACI ,ReinforcedConcreteStructuresinSeismicZones,PublicationSP -53,AmericanConcreteInstitute,Detroit,Michigan,1977
    2 PauleyT ,PriestleyMJN .SeismicDesignofReinforcedConcreteandMa sonryBuildings,JohnWiley&Sons,NewYork,1992
    3 MugurumaH .SeismicProblemsofPPCBuildingStructureswithSpecialReferencetoBasicResearchinJapan,PP .231~54,PartialPrestressing,fromTheorytoPracticeVol.2,MartinusNijhoffPublishers,Boston,1986
    4 CollinsMichaelP ,MitchellDenis.PrestressedConcreteStructres,PrenticeHallEnglewoodCliffs,NewJersey,07632,1995
    5 吕志涛,孟少平.现代预应力设计.北京:中国建筑工业出版社,1998
    6 PostTensioningInstitute,PostTensioningManual,FifthEdition,1990
    7 国家地震局工程力学研究所.地震工程译文集.北京:地震出版社,1978
    8 冯健.高层建筑预应力混凝土曲梁转换层结构的研究与应用:[博士学位论文].南京:东南大学,2000

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心