引文
[1]刘招伟,何满潮,王树仁.圆梁山隧道岩溶突水机理及防治对策研究[J].岩土力学,2006,27(2):228-232.LIU Zhao-wei,HE Man-chao,WANG Shu-ren.Study ofkarst water burst mechanism and preventioncountermeasure in Yuanliangshan tunnel[J].Rock andSoil Mechanics,2006,27(2):228-232.
[2]张庆松,李术才,韩宏伟,等.岩溶隧道施工风险评价与突水灾害防治技术研究[J].山东大学学报(工学版),2009,39(3):106-110.ZHANG Qing-song,LI Shu-cai,HAN Hong-wei,et al.Study of risk evaluation and water inrush disasterpreventing technology during construction of karsttunnels[J].Journal of Shandong University(Engineering Science),2009,39(3):106-110.
[3]李利平,李术才,陈军,等.基于岩溶突涌水风险评价的隧道施工许可机制及其应用研究[J].岩石力学与工程学报,2011,30(7):1345-1354.LI Li-ping,LI Shu-cai,CHEN Jun,et al.Constructionlicense mechanism and its application based on karstwater inrush risk evaluation[J].Chinese Journal of RockMechanics and Engineering,2011,30(7):1345-1354.
[4]许振浩,李术才,李利平,等.基于层次分析法的岩溶隧道突水突泥风险评估[J].岩土力学,2011,32(6):1757-1765.XU Zhen-hao,LI Shu-cai,LI Li-ping,et al.Riskassessment of water or mud inrush of karst tunnels basedon analytic hierarchy process[J].Rock and SoilMechanics,2011,32(6):1757-1765.
[5]匡星,白明洲,王成亮,等.基于模糊评价方法的隧道岩溶突水地质灾害综合预警方法[J].公路交通科技,2010,27(11):100-103.KUANG Xing,BAI Ming-zhou,WANG Cheng-liang,et al.Research of comprehensive warning of water inrushhazards in karst tunnel based on fuzzy evolutionmethod[J].Journal of Highway and TransportationResearch and Development,2010,27(11):100-103.
[6]毛邦燕,许模,蒋良文.隧道岩溶突水、突泥危险性评价初探[J].中国岩溶,2010,29(2):183-189.MAO Bang-yan,XU Mo,JIANG Liang-wen.Preliminary study of risk assessment of water and mud inrush in karsttunnel[J].Carsologica Sinica,2010,29(2):183-189.
[7]韩行瑞.岩溶隧道涌水及其专家评判系统[J].中国岩溶,2004,23(3):213-218.HAN Xing-rui.Karst water bursting in tunnel and expertjudging system[J].Carsologica Sinica,2004,23(3):213-218.
[8]叶志华,韩行瑞,张高明,等.隧道岩溶涌水专家评判系统在朱家岩隧道涌水预报中的应用[J].中国岩溶,2006,25(2):139-145.YE Zhi-hua,HAN Xing-rui,ZHANG Gao-ming,et al.Application of expert’s judging system in predicting karstwater bursting in Zhujiayan tunnel[J].Carsologica Sinica,2006,25(2):139-145.
[9]杜毓超,韩行瑞,李兆林.基于AHP的岩溶隧道涌水专家评判系统及其应用[J].中国岩溶,2009,28(3):281-287.DU Yu-chao,HAN Xing-rui,LI Zhao-lin.Professionalevaluating system for karst tunnel gushing based on AHPand its application[J].Carsologica Sinica,2009,28(3):281-287.
[10]杨春玲.基于属性数学的综合评价模型[D].大连:大连理工大学,2008.
[11]程乾生.属性识别理论模型及其应用[J].北京大学学报(自然科学版),1997,33(1):12-20.CHENG Qian-sheng.Attribute recognition theoreticalmodel with application[J].Acta Scientiarum NaturaliumUniversitatis Pekinensis,1997,33(1):12-20.
[12]程乾生.质量评价的属性数学模型和模糊数学模型[J].数理统计与管理,1997,16(6):18-23.CHENG Qian-sheng.Attribute mathematical model andfuzzy mathematical model for quality assessment[J].Application of Statistics and Management,1997,16(6):18-23.
[13]程乾生.属性集和属性综合评价系统[J].系统工程理论与实践,1997,17(9):1-8.CHENG Qian-sheng.Attribute sets and attribute syntheticassessment system[J].Systems Engineering—Theory&Practice,1997,17(9):1-8.
[14]文畅平.隧道瓦斯突出危险性评价的属性识别模型与实例[J].煤炭学报,2011,36(8):1322-1328.WEN Chang-ping.Attribute recognition model and itsapplication of fatalness assessment of gas burst intunnel[J].Journal of China Coal Society,2011,36(8):1322-1328.
[15]文畅平.基于属性数学理论的岩体质量分级方法[J].水利发电学报,2008,27(3):75-80.WEN Chang-ping.Classification of rockmass stabilitybased on attributive mathematical theory[J].Journal ofHydroelectric Engineering,2008,27(3):75-80.
[16]文畅平,杨果林.基于属性数学理论的岩土边坡地震稳定性评价[J].中国铁道科学,2010,31(5):8-14.WEN Chang-ping,YANG Guo-lin.The seismic stabilityevaluation of the rock and soil slope based on the attributemathematical theory[J].China Railway Science,2010,31(5):8-14.
[17]文畅平.属性综合评价系统在岩爆发生和烈度分级中的应用[J].工程力学,2008,25(6):153-158.WEN Chang-ping.Application of attribute syntheticevaluation system in prediction of possibility andclassification of rock burst[J].Engineering Mechanics,2008,25(6):153-158.
[18]邓云叶.应用属性数学理论的采空区地基稳定性评价[J].测绘科学,2011,36(4):48-49.DENG Yun-ye.Assessment of goaf foundation stabilitybased on attribute mathematical theory[J].Science ofSurveying and Mapping,2011,36(4):48-49.
[19]张强,刘克,高自友.属性综合评价系统在城市交通规划中的应用[J].系统工程理论与实践,2002,22(6):113-120.ZHANG Qiang,LIU Ke,GAO Zi-you.An application ofattribute synthetic evaluation system in urban trafficplanning[J].System Engineering—Theory&Practice,2002,22(6):113-120.
[20]葛颜慧.岩溶隧道突水风险评价与预警机制研究[D].济南:山东大学,2010.
[21]沈祥明,刘坡拉,汪继锋.基于层次分析法的铁路岩溶隧道突水风险评价[J].铁道工程学报,2010,12:56-63.SHEN Xiang-ming,LIU Po-la,WANG Ji-feng.Evaluation of water inrush risks of karst tunnel withanalysis hierarchy process[J].Journal of RailwayEngineering Society,2010,12:56-63.
[22]王东.武广线韶关段某岩溶隧道涌(突)水量预测及对施工影响评价[D].成都:西南交通大学,2008.
[23]许振浩,李术才,李利平,等.基于风险动态评估与控制的岩溶隧道施工许可机制[J].岩土工程学报,2011,33(11):1715-1725.XU Zhen-hao,LI Shu-cai,LI Li-ping,et al.Constructionpermit mechanism of karst tunnels based on dynamicassessment and management of risk[J].Chinese Journalof Geotechnical Engineering,2011,33(11):1715-1725.
[24]张旭东.深部岩溶隧道溃水成灾机理及其工程处治技术研究[D].重庆:重庆大学,2010.
[25]SAATY T L.How to make a decision:The analytichierarchy process[J].European Journal of OperationalResearch,1990,48(1):9-26.
[26]李术才,刘斌,李树忱,等.基于激发极化法的隧道含水地质构造超前探测研究[J].岩石力学与工程学报,2011,30(7):1297-1309.LI Shu-cai,LIU Bin,LI Shu-chen,et al.Study ofadvanced detection for tunnel water bearing geologicalstructures with induced polarization method[J].ChineseJournal of Rock Mechanics and Engineering,2011,30(7):1297-1309.