引文
[1]钱鸣高,石平五,许家林.矿山压力与岩层控制[M].北京:中国矿业大学出版社,2010:65–99.(QIAN Minggao,SHI Pingwu,XU Jialin.Mining pressure and strata control[M].Beijing:China Mining University Publishing House,2010:65–99.(in Chinese))
[2]高保彬,王晓蕾,朱明礼,等.复合顶板高瓦斯厚煤层综放开采“两带”动态发育特征[J].岩石力学与工程学报,2012,31(增1):3 444–3 451.(GAO Baobin,WANG Xiaolei,ZHU Mingli,et al.Dynamic development characteristics of two zones of overburden strata under conditions of compound roof,highly gassy and thick coal seam in full-mechanized topcoal caving faces[J].Chinese Journal of Rock Mechanics and Engineering,2012,31(增1):3 444–3 451.(in Chinese))
[3]姜岩.采动覆岩离层及其分布规律[J].山东矿业学院学报,1997,16(1):19–22.(JIANG Yan.Mining strata abscission layer and their distribution rule[J].Journal of Shandong Mining Institute,1997,16(1):19–22.(in Chinese))
[4]王庆照,蒋升,司马俊杰.厚煤层重复采动覆岩破裂发育规律研究[J].山东科技大学学报:自然科学版,2010,29(4):67–82.(WANG Qingzhao,JIANG Sheng,SIMA Junjie.Study on fracturing and development rules of overlying strata under repeated mining in thick coal seam[J].Journal of Shandong University of Science and Technology:Natural Science,2010,29(4):67–82.(in Chinese))
[5]王福厚.高位钻孔抽放瓦斯冒落带及裂隙带高度确定方法[J].煤炭技术,2008,27(8):75–76.(WANG Fuhou.Determination method of caving and fracture zone height for gas drainage by high level borehole[J].Coal Technology,2008,27(8):75–76.(in Chinese))
[6]李焕,吕自伟,赵亮,等.高位钻孔瓦斯抽放冒落带与裂隙带高度的测定方法[J].现代矿业,2011,(1):49–51.(LI Huan,LU Ziwei,ZHAO Liang,et al.Determination methods of caving and fractured zone height for gas drainage by high level borehole[J].Modern Mining,2011,(1):49–51.(in Chinese))
[7]李华奇,刘鹏程.采空区冒落带高度影响因素及分布规律分析[J].煤炭技术,2011,30(8):117–119.(LI Huaqi,LIU Pengcheng.Analysis of influencing factors and distribution regularities of caving zone heights[J].Coal Technology,2011,30(8):117–119.(in Chinese))
[8]煤炭科学研究总院北京开采研究所.煤矿地表移动与覆岩破坏规律及其应用[M].北京:煤炭工业出版社,1983:130–135.(Branch of Beijing Mining Institute,China Coal Research Institute.Law for ground surface movement and overburden failure in coal mine and its application[M].Beijing:China Coal Industry Publishing House,1983:130–135.(in Chinese))
[9]国家煤炭工业局.建筑物、水体、铁路及主要井巷煤柱留设与压煤开采规程[M].北京:煤炭工业出版社,2000:225–233.(State Coal Industry Bureau.Building,water body,railroad and main mine lanecoal pillar with pressure mining engineering[M].Beijing:China Coal Industry Publishing House,2000:225–233.(in Chinese))
[10]石金峰,麻凤海,洪加明.综采放顶煤条件下覆岩冒落带,裂缝带高度的探讨[J].矿山测量,1996,(3):41–44.(SHI Jinfeng,MA Fenghai,HONG Jiaming.Under the conditions of fully mechanized caving coal face strata maoladai,fractured zone height[J].Mine Surveying,1996,(3):41–44.(in Chinese))
[11]张彬,牟义,张俊英,等.瞬变电磁法在导水裂隙带高度探测中的研究应用[J].煤炭工程,2011,(3):44–46.(ZHANG Bin,MU Yi,ZHANG Junying,et al.Transient electromagnetic method in the research and application in the detection of water flowing fractured zone height[J].Coal Project,2011,(3):44–46.(in Chinese))
[12]李文生,李文,尹尚先.综采一次采全高顶板导水裂缝带发育高度研究[J].煤炭科学技术,2012,40(6):104–107.(LI Wensheng,LI Wen,YIN Shangxian.Study on development height of water flow crack zone in roof above fully mechanized one passing full seam mining face[J].Coal Science and Technology,2012,40(6):104–107.(in Chinese))
[13]郑军.上覆岩层运动规律的相似模拟试验研究[J].煤炭科技,2011,(1):6–8.(ZHENG Jun.Overburden movement law of similarity simulation test study[J].Coal Science,2011,(1):6–8.(in Chinese))
[14]张兴民,于克君,席京德,等.微地震技术在煤矿“两带”监测领域的研究与应用[J].煤炭学报,2000,25(6):566–570.(ZHANG Xingmin,YU Kejun,XI Jingde,et al.The research and application of microseismic technology in mine fractured and caving zones monitoring[J].Journal of China Coal Society,2000,25(6):566–570.(in Chinese))
[15]程学丰,刘盛东,刘登宪.煤层采后围岩破坏规律的声波CT探测[J].煤炭学报,2001,26(2):153–155.(CHENG Xuefeng,LIU Shengdong,LIU Dengxian.Failure law of the sound wave CT detection after mining[J].Journal of China Coal Society,2001,26(2):153–155.(in Chinese))
[16]王川婴,LAW K Tim.钻孔摄像技术的发展与现状[J].岩石力学与工程学报,2005,24(19):3 440–3 447.(WANG Chuanying,LAW K Tim.Review of borehole camera technology[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(19):3 440–3 447.(in Chinese))