引文
[1]U.S.NRC.Regulatory Identification and Characterization of Seismic Hazard and Determination of Safe Shutdown Earthquake Ground Motion,Regulatory Guide 1.165.1997.
[2]BUDNITZ R J,APOSTOLAKIS G,BOORE D M,et al.Recommendations for Probabilistic Seismic Hazard Analysis:Guidance on Uncertainty and Use of Experts,NUREG/CR 6372.1997.
[3]MCGUIRE R K,VENEZIANO D,TORO G,et al.Seismic Hazard Methodology for the Central and Eastern United States,Volume 1: methodology,EPRI - NP -4726 - Vol.1.1989.
[4]SOBEL P.Revised Livermore Seismic Hazard Estimates for Sixty-nine Nuclear Power Plant Sites East of the Rocky Mountains,NUREG- 1488.1994.
[5]BOMMER JULIAN J,ABRAHAMSON,NORMAN A.Why Do Modem Probabilistic Seismic-hazard Analyses Often Lead to Increased Hazard Estimates.BSSA,2006,96(6):1967 - 1977.
[6]U.S.NRC.Reactor Site Criteria,10CFR100.2010.
[7]FRANKEL A D,PETERSEN M D,MUELLER C S,et al.Documents- tion for the 2002 Update of the National Seismic Hazard Maps,Openfile Report 02-420.2002.
[8]国家质量监督检验检疫总局.GB10836-2001中国地震动参数区划图.2001.
[9]AJINCI A F,GALADINI D,PANTOSTI,et al.Effect of Time Dependence on Probabilistic Seismic-hazard Maps and Deaggregation for the Central Apennines.BSSA,2009,99(2):585-610.
[10]STIRLING M W,VERRY G H,MCBERRYMAN K R.A New Seismic Hazard Model for New Zealand.BSSA,2002,92(5):1878 - 1903.
[11]CORNELL C A.Engineering Seismic Risk Analysis.BSSA,1968, 58(5):1583 -1606.
[12]U.S.NRC.Seismic Safety Margins Research Program PhaseⅠFinal Report-Overview,NUREG/CR-2015.1981.
[13]U.S.NRC.Perspectives Gained from the Individual Plant Examination of External Events,NUREG-1742.2002.
[14]ZIEGLER A,DIAMANTIDIS D.Maximum Loss Prediction for Earthquake Insurance.Reliability Engineering,1987,18(1):61 -69.
[15]YUCEMEN M S,YILMAZ C,ERDIK M.Probabilistic Assessment of Earthquake Insurance Rates for Important Structures:Application to Gumusova - Gerede Motorway.Structural Safety,2008,30(5 ): 420-435.
[16]MCGUIRE R K.Effects of Uncertainty in Seismicity on Estimates of Seismic Hazard for the East Coast of United States.BSSA,1977,67 (3):827 -848.
[17]WU JIAN,GAO MENGTAN,CHEN KUN,et al.Discussion on the Influence of Truncation of Ground Motion Residual Distribution on Probabilistic Seismic Hazard Assessment.Earthq Eng & Eng Vib, 2011,10:379-392.
[18]SPUNDICH P,JOYNER W B,LINDH A G,et al.A Revised Ground Motion Prediction Relation for Use in Extensional Tectonic Regimes. BSSA,1999,89(5):1156-1170.
[19]ABRAHAMS0N N A,SILVA W J.Empirical Response Spectral Attenuation Relations for Shallow Crustal Earthquakes.SRL,1997,68 (1):64-127.
[20]YU YANXIANG.Attenuation Relation of Ground Motion Parameters - Review and Determination of SL-2 Design Basis Ground Motion for Yangjiang Nuclear Power Plant in Guangdong Province.Research Report,Institute of Geophysics,China Earthquake Administration, No.05FC3004.2005:79-96.
[21]U.S.NRC.Design Response Spectra for Seismic Design of Nuclear Power Plant,Regulatory guide 1.60.Revision 1.1973:1 -4.
[22]NEWMARK N M.HALL W J.Development of Criteria for Seismic Review of Selected Nuclear Power Plants.1977.